Suncity
Omega Builders
Barabanki, Uttar Pradesh
Approved
1st Apr 2021
Completed
31st Mar 2022
Registration No.
UPRERAPRJ498190
Project Type
Residential
District
Barabanki
Taluka
Nawabganj
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ498190 |
| Project Status | Completed |
| Project Category | Residential |
| District | Barabanki |
| Taluka | Nawabganj |
| Start Date | 2021-04-01 |
| Completion Date | 2022-03-31 |
| Total Area (sqm) | 12665 |
| Project Cost (Lacs) | 276 |
| Duration (Months) | 12 |
| Registration Fee | 68500 |
Promoter Details
| Promoter Name | Omega Builders |
| Promoter ID | UPRERAPRM130424 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | Arc Namit Agarwal |
| Contractor | Sai Enterprises |
| Structural Engineer | Capt. Manoj Wasan |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 255, 256 | 12664.66 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | THE PLOTS WILL BE WELL DEMARCATED BY PLACING IRON ANGELS ON ALL FOUR CORNERS OF EACH PLOT SO THAT THEY CAN BE EASILY IDENTIFIED AND THAT A SIGN BOARD WITH THE PLOT NUMBER SHALL BE PUT UP ON THE FRONT OF EACH PLOT WITH THE DIMENSIONS AREA AND SIZE. |
| Boundary Wall | BOUNDARY WALL WILL BE PROVIDED WITH BRICK WORK UPTO 1.2M ALONG WITH M.S GRILL UPTO 0.6M HT BIFURCATING THE PHASE II ONLY NOT ON ANY OTHER SIDE OF THE PLOT. |
| Road Work | 12MTS ROAD WITH CENTRAL BITUMIN FINISH AND SOFT PAVEMENTS ON BOTH SIDES OF ROAD SHALL MADE ON EASTERN SIDE 18MTR WIDE ROAD WITH CENTRAL BITUMIN FINISHED AND SOFT PAVEMENTS ON BOTH SIDES SHALL BE MADE ON NORTH SIDE. |
| Footpaths | THERE WILL BE FOOTPATH ALONG BOTH THE ROADS. |
| Water Supply Including Drinking Water Facilities | WATER SUPPLY TO INDIVIDUAL PLOT WILL BE THROUGH PROPOSED 80MM. |
| Sewer System | 250MM PIPE WITH CHAMBER AT JUNCTION OF TWO PLOTS IS TO BE PROVIDED. THIS SEWER LINE SHALL BE CONNECTED WITH THE EXISTING MUNICIPAL SEWAGE LINE. |
| Drain | DRAIN ALONG THE MAIN ROAD SHALL BE PROVIDED WITH PROPER SLOPE. |
| Parks | PARK SHALL BE DEVELOPED WITH STRUCTURED GREEN AREA. |
| Tree Planting | TREE ALONG THE ROAD AND ONE TREE IN THE FRONT SIDE OF EACH PLOT SHALL BE PLANTED. |
| Design For Electric Supply Including Street Lighting | ELECTRICITY POLES WITH LT CONNECTION AND STREET LIGHT SHALL BE ERRECTED ALONG THE ROAD SO THAT PLOT HOLDER CAN GET EASY CONNECTION. |
| Community Buildings | A CLUB IS PROVIDED IN THE PROJECT. |
| Treatment and Disposal System of Sewage and Sullage water | NA |
| Solid Waste Management And Disposal System | NA |
| Water Conservation System | PROPER GUIDELINES WILL BE FOLLOWED FOR CONSERVATION OF NATURAL WATER. |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | NA |
| Social Infrastructure And Other Public Amenities Including Public Health Services | PROPER PROVISION FOR SOCIAL INFRA AND PUBLIC AMENITIES PROVIDED. |
| Emergency Evacuation Services | NA |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | AXIS BANK LTD |
| Branch | GRAM OBRI, BARABANKI |
| Branch Address | GRAM OBRI, BARABANKI |
| Account Holder | OMEGA BUILDERS- SEPARATE BANK ACCOUNT FOR SUNCITY |
| Account Number | 921020001643484 |
| IFSC Code | UTIB0000743 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in