New Launch - India Real Estate Report 2026.

Tamanna Aarzoo

M/s Shalimar Corp Ltd.

Barabanki, Uttar Pradesh

RERA approved

Approved

15th Feb 2021

Project completed

Completed

15th Feb 2024

Registration No.

UPRERAPRJ922369

Project Type

Residential

District

Barabanki

Taluka

Nawabganj

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ922369
Project StatusCompleted
Project CategoryResidential
DistrictBarabanki
TalukaNawabganj
Start Date2021-02-15
Completion Date2024-02-15
Total Area (sqm)4465
Project Cost (Lacs)2158
Duration (Months)37
Registration Fee27500

Promoter Details

Promoter NameM/s Shalimar Corp Ltd.
Promoter IDUPRERAPRM4092
Mobile74********

Project Team

rolename
ArchitectJSR Architects
ContractorKD Commercial
Structural EngineerSanjive Jain

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra105,110, Mohammadpura Chauki, Faizabad road, Barabanki4465.14

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
EWSGF1 BHK1827.870
EWS11 BHK1727.87-
EWS21 BHK1727.87-
EWS31 BHK1727.87-
EWS41 BHK1727.87-
EWS51 BHK1727.87-
EWS61 BHK1727.87-
LIGGF1 BHK1830.400
LIG11 BHK1730.40-
LIG21 BHK1730.40-
LIG31 BHK1730.40-
LIG41 BHK1730.40-
LIG51 BHK1730.40-
LIG61 BHK1730.40-

Development Works

work_namedescription
Demarcation of PlotsThis is single plot rectangle shaped, having total 1 number of exit gate from the 9 meter wide front road and 7 meter internal road. site is surrender by the other on one side.
Boundary Wall1.8-2.1 meter high nad 230mm thick boundary wall design. MS board entrance and exit gates are developed with boundary.
Road Workconcrete road with high quality concrete rigid pavers will be used as per design suggest by the architect fir internal road.
Footpathsall internal road will have narrow footpath red sand stone pavers or equipment finishes.
Water Supply Including Drinking Water FacilitiesGround water may also be used, also end user shall be used there individual RO System as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
Sewer SystemCentralized Sewerage system shall be provided. All sewerage water shall be go to the STP for treatment after treatment, water shall be recycle and it will use in gardening, Flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal Sewerage system
DrainStorm water system shall be provided. Storm water from roads and other landscape area shall be connect to the storm water drain channel and go to the rain water harvesting Pit for recharge the ground water and overflow shall be connect with municipal drain line.
ParksN.A.
Tree PlantingTree plantation shall be as per norms applicable.
Design For Electric Supply Including Street LightingWe have designed thew system as per local electricity board and consider centralized transformer, HT panel, LT panel, feeder pillar and DG back for common service like external lighting.
Community BuildingsN.A.
Treatment and Disposal System of Sewage and Sullage waterCentralized sewerage system shall be provided. all sewerage water shall be go to the STP for treatment after treatment, water shall be recycle at it will be use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the municipal sewerage system.
Solid Waste Management And Disposal SystemThere is proper garbage collection area provided for the solid waste management.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. in STP and pump room all the equipment shall have energy efficient motor.
Fire Protection And Fire Safety SystemAll the fire norms shall be followed as NBC and approval of fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesWater for domestic use and flushing go down through gravity from domestic as well as flushing tanks. all sewerage shall be go to the STP for recycling the water. Storm water for roof, roads and other area shall be connect to the storm water drain channel and go to the rain water harvesting Pit for recharge the ground water and overflow shall be connect with Municipal drain.
Emergency Evacuation ServicesFire staircase provided in each block.
Other Miscellaneous WorkN.A.

Bank Details

Bank NameUNION BANK OF INDIA
BranchBARABANKI
Branch AddressBARABANKI
Account HolderSHALIMAR CORP LTD COLLECTION ACCOUNT FOR TAMANNA AARZOO
Account Number371501010111914
IFSC CodeUBIN0537152

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy