New Launch - India Real Estate Report 2026.

ELDECO CITY MART

ELDECO INFRABUILD LIMITED

Bareilly, Uttar Pradesh

RERA approved

Approved

15th Nov 2021

Project completed

Completed

30th Mar 2024

Registration No.

UPRERAPRJ937712

Project Type

Commercial

District

Bareilly

Taluka

Bareilly

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ937712
Project StatusCompleted
Project CategoryCommercial
DistrictBareilly
TalukaBareilly
Start Date2021-11-15
Completion Date2024-03-30
Total Area (sqm)640
Project Cost (Lacs)219
Duration (Months)29
Registration Fee12800

Promoter Details

Promoter NameELDECO INFRABUILD LIMITED
Promoter IDUPRERAPRM93592
Mobile88********

Project Team

rolename
ArchitectSANJAY KUMAR GUPTA
ContractorATUL KUMAR SINGH
Structural EngineerAKHILESH KUMAR SINGH

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra512640.16

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Eldeco MartBSMNTSHOP218.06-
Eldeco MartBSMNTSHOP218.24-
Eldeco MartBSMNTSHOP118.29-
Eldeco MartBSMNTSHOP118.5-
Eldeco MartGFSHOP218.060
Eldeco MartGFSHOP218.240
Eldeco MartGFSHOP118.290
Eldeco MartGFSHOP118.50
Eldeco Mart1SHOP218.06-
Eldeco Mart1SHOP218.24-
Eldeco Mart1SHOP118.29-
Eldeco Mart1SHOP118.5-

Development Works

work_namedescription
Demarcation of PlotsThe plot is a part of Well Developed and approved mini township and demarcation of plot is already done at the site, with its approach roads.
Boundary WallThe project is a part of well developed township. Its demarcation is well defined but No hard Boundary Wall has been proposed in the project.
Road WorkNo internal Roads has been proposed as per the approved layout. The area shall be paved using CC Blocks/ Exterior grade tiles/ stones as per design detailing.
FootpathsNo internal Roads/ Foot-path has been proposed as per approved layout. The area shall be paved using CC Blocks/ Exterior grade tiles/ stones as per design detailing.
Water Supply Including Drinking Water FacilitiesAdequate Drinking water facility is proposed in the project.
Sewer SystemA 150mm diameter sewer line shall be laid in slope to collect soil and waste water from the toilet. This sewer line will be in turn connected to the available main sewer line of the project on the main road.
DrainAn underground drainage system shall collect ground Surface discharge and connect it to the main drainage line available on the main road.
ParksNo green park has been proposed within the complex as per approved drawing. However some average height plants shall be provided as a part of landscape.
Tree PlantingPlantation is already done as per the approved drawing and we will provide same no. of trees as per the drawing, as a part of the landscape.
Design For Electric Supply Including Street LightingProper cabling system shall be laid as per electric design upto the electric room. Electric Light (GI) Poles shall be installed as a part of external in the project.
Community BuildingsNo Community buildings have been proposed.
Treatment and Disposal System of Sewage and Sullage waterFor treatment and disposal of sewage sullage water STP is being provided in the main township.
Solid Waste Management And Disposal SystemManagement and Disposal of solid waste will be coordinated with the municipal authorities and one of best systems available will be provided.
Water Conservation SystemThe Plan has a provision for 1 number Rain water harvesting pit. The rain water on terrace of the complex shall be collected through downpipes and directed to the proposed rain water harvesting pit.
Energy Management System Including Use of Renewable Energy25 percent of the total external lights shall have solar power backup.
Fire Protection And Fire Safety SystemThe provision of a down comer and fire extinguishers on each floors have been provided. Along with 2 fire extinguishers on each floor a manual fire alarm system shall be provided.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesAn emergency exit route chart shall be provided at two places at each floor.
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameHDFC Bank Ltd.
BranchBareilly-II U.P.
Branch AddressMohini Hospital Priyadarshni Nagar, Bareilly-243122 U.P
Account HolderEldeco Infrabuild Limited Collection Escrow A/c for Eldeco City Arcade
Account Number57500000816800
IFSC CodeHDFC0000860

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy