ELDECO CITY MART
ELDECO INFRABUILD LIMITED
Bareilly, Uttar Pradesh
Approved
15th Nov 2021
Completed
30th Mar 2024
Registration No.
UPRERAPRJ937712
Project Type
Commercial
District
Bareilly
Taluka
Bareilly
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ937712 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Bareilly |
| Taluka | Bareilly |
| Start Date | 2021-11-15 |
| Completion Date | 2024-03-30 |
| Total Area (sqm) | 640 |
| Project Cost (Lacs) | 219 |
| Duration (Months) | 29 |
| Registration Fee | 12800 |
Promoter Details
| Promoter Name | ELDECO INFRABUILD LIMITED |
| Promoter ID | UPRERAPRM93592 |
| Mobile | 88******** |
Project Team
| role | name |
|---|---|
| Architect | SANJAY KUMAR GUPTA |
| Contractor | ATUL KUMAR SINGH |
| Structural Engineer | AKHILESH KUMAR SINGH |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 512 | 640.16 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Eldeco Mart | BSMNT | SHOP | 2 | 18.06 | - |
| Eldeco Mart | BSMNT | SHOP | 2 | 18.24 | - |
| Eldeco Mart | BSMNT | SHOP | 1 | 18.29 | - |
| Eldeco Mart | BSMNT | SHOP | 1 | 18.5 | - |
| Eldeco Mart | GF | SHOP | 2 | 18.06 | 0 |
| Eldeco Mart | GF | SHOP | 2 | 18.24 | 0 |
| Eldeco Mart | GF | SHOP | 1 | 18.29 | 0 |
| Eldeco Mart | GF | SHOP | 1 | 18.5 | 0 |
| Eldeco Mart | 1 | SHOP | 2 | 18.06 | - |
| Eldeco Mart | 1 | SHOP | 2 | 18.24 | - |
| Eldeco Mart | 1 | SHOP | 1 | 18.29 | - |
| Eldeco Mart | 1 | SHOP | 1 | 18.5 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The plot is a part of Well Developed and approved mini township and demarcation of plot is already done at the site, with its approach roads. |
| Boundary Wall | The project is a part of well developed township. Its demarcation is well defined but No hard Boundary Wall has been proposed in the project. |
| Road Work | No internal Roads has been proposed as per the approved layout. The area shall be paved using CC Blocks/ Exterior grade tiles/ stones as per design detailing. |
| Footpaths | No internal Roads/ Foot-path has been proposed as per approved layout. The area shall be paved using CC Blocks/ Exterior grade tiles/ stones as per design detailing. |
| Water Supply Including Drinking Water Facilities | Adequate Drinking water facility is proposed in the project. |
| Sewer System | A 150mm diameter sewer line shall be laid in slope to collect soil and waste water from the toilet. This sewer line will be in turn connected to the available main sewer line of the project on the main road. |
| Drain | An underground drainage system shall collect ground Surface discharge and connect it to the main drainage line available on the main road. |
| Parks | No green park has been proposed within the complex as per approved drawing. However some average height plants shall be provided as a part of landscape. |
| Tree Planting | Plantation is already done as per the approved drawing and we will provide same no. of trees as per the drawing, as a part of the landscape. |
| Design For Electric Supply Including Street Lighting | Proper cabling system shall be laid as per electric design upto the electric room. Electric Light (GI) Poles shall be installed as a part of external in the project. |
| Community Buildings | No Community buildings have been proposed. |
| Treatment and Disposal System of Sewage and Sullage water | For treatment and disposal of sewage sullage water STP is being provided in the main township. |
| Solid Waste Management And Disposal System | Management and Disposal of solid waste will be coordinated with the municipal authorities and one of best systems available will be provided. |
| Water Conservation System | The Plan has a provision for 1 number Rain water harvesting pit. The rain water on terrace of the complex shall be collected through downpipes and directed to the proposed rain water harvesting pit. |
| Energy Management System Including Use of Renewable Energy | 25 percent of the total external lights shall have solar power backup. |
| Fire Protection And Fire Safety System | The provision of a down comer and fire extinguishers on each floors have been provided. Along with 2 fire extinguishers on each floor a manual fire alarm system shall be provided. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | An emergency exit route chart shall be provided at two places at each floor. |
| Other Miscellaneous Work | Not Applicable |
Bank Details
| Bank Name | HDFC Bank Ltd. |
| Branch | Bareilly-II U.P. |
| Branch Address | Mohini Hospital Priyadarshni Nagar, Bareilly-243122 U.P |
| Account Holder | Eldeco Infrabuild Limited Collection Escrow A/c for Eldeco City Arcade |
| Account Number | 57500000816800 |
| IFSC Code | HDFC0000860 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate