Shaurya Nagar
Dhanraj Builders Consortium
Bareilly, Uttar Pradesh
Approved
10th May 2019
Completed
9th Nov 2021
Registration No.
UPRERAPRJ488135
Project Type
Residential
District
Bareilly
Taluka
Bareilly
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ488135 |
| Project Status | Completed |
| Project Category | Residential |
| District | Bareilly |
| Taluka | Bareilly |
| Start Date | 2019-05-10 |
| Completion Date | 2021-11-09 |
| Total Area (sqm) | 13330 |
| Project Cost (Lacs) | 2133 |
| Duration (Months) | 30 |
| Registration Fee | 72000 |
Promoter Details
| Promoter Name | Dhanraj Builders Consortium |
| Promoter ID | UPRERAPRM87365 |
| Mobile | 81******** |
Project Team
| role | name |
|---|---|
| Architect | Anil Kumar Saxena |
| Contractor | Tasleem Khan |
| Structural Engineer | Brajpal Singh |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1327,1328 | 13330 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 1 | GF | 1 BHK | 24 | 23.46 | 0 |
| 1 | 1 | 1 BHK | 24 | 23.46 | - |
| 1 | 2 | 1 BHK | 24 | 23.46 | - |
| 1 | 3 | 1 BHK | 24 | 23.46 | - |
| 1 | 4 | 1 BHK | 24 | 23.46 | - |
| 2 | GF | 1 BHK | 24 | 23.46 | 0 |
| 2 | 1 | 1 BHK | 24 | 23.46 | - |
| 2 | 2 | 1 BHK | 24 | 23.46 | - |
| 2 | 3 | 1 BHK | 24 | 23.46 | - |
| 2 | 4 | 1 BHK | 24 | 23.46 | - |
| 3 | GF | 1 BHK | 24 | 23.46 | 0 |
| 3 | 1 | 1 BHK | 24 | 23.46 | - |
| 3 | 2 | 1 BHK | 24 | 23.46 | - |
| 3 | 3 | 1 BHK | 24 | 23.46 | - |
| 3 | 4 | 1 BHK | 24 | 23.46 | - |
| 4 | GF | 1 BHK | 24 | 23.46 | 0 |
| 4 | 1 | 1 BHK | 24 | 23.46 | - |
| 4 | 2 | 1 BHK | 24 | 23.46 | - |
| 4 | 3 | 1 BHK | 24 | 23.46 | - |
| 4 | 4 | 1 BHK | 24 | 23.46 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Each block is having length-69.54Mtr and width 10.510Mtr |
| Boundary Wall | 1.67Mtr High Boundary wall has been raised |
| Road Work | Roads will be provided as per the sanctioned plan of 6Mtr,5Mtr,4Mtr respectively. |
| Footpaths | Footpaths are provided inside the parks |
| Water Supply Including Drinking Water Facilities | Total 2 No.tube-wells are proposed to meet total daily water demand (141KLD Per Day) of the colony. Anticipated yield of one tube-well 15000 Ltrs per day. One Tube-well will yield 180 Cum of water for 12Hours running a day. Depth of tube-well of diameter 450mm would be in the range 125-175m. |
| Sewer System | Sewer drains will be provided as per sanctioned plan |
| Drain | Drains will be provided as per sanctioned plan |
| Parks | 2003 Sqm area is proposed in the project for Parks |
| Tree Planting | Around 110 Nos of trees will be planted in the parks as well as along the road side |
| Design For Electric Supply Including Street Lighting | 650KVA transformer, poll mounted, Oil filled with off load tap changer will be provided. Roads and parks will be lighted with duel function light and wire polls. All Blocks will have the electric connection from the Meter room provided at the Ground Floor on stair case area wall. |
| Community Buildings | Three Convenient shops are provided as community building |
| Treatment and Disposal System of Sewage and Sullage water | Bio Sewage Treatment Plant of 110 KLD with Burmi Compost Technology will be used in the Project. Sewer line will be installed for disposal of Sullage water till the STP. |
| Solid Waste Management And Disposal System | A Common garbage area with three side covered walls will be provided in the project. |
| Water Conservation System | 2 Rainwater recharge pits will be provided in the project and Drains will be provided for Water Conservation. |
| Energy Management System Including Use of Renewable Energy | Eco Friendly Flyash bricks will also be used along with Red Bricks in the project. |
| Fire Protection And Fire Safety System | A 5000 Ltr Fire Storage Tank is provided over each mumty. therefore around 40000 Ltrs water will always be stored for fire safety measures. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Shri Ram Murti Smarak Medical College 3.5Km from Proposed site |
| Emergency Evacuation Services | 2 Stair Cases in each block are provided for Emergency Evacuation. |
| Other Miscellaneous Work | Lush Green Parks, Wide Roads, Open Parking along with Continent Shops. |
Bank Details
| Bank Name | Punjab National Bank |
| Branch | Ekta Nagar Bareilly U.P |
| Branch Address | Ekta Nagar Bareilly U.P |
| Account Holder | RAKESH SHARMA LEAD MEMBER AND RAMESH GUPTA PARTNER |
| Account Number | 8794002100000375 |
| IFSC Code | PUNB0879400 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate