Project Details

RERA IDUPRERAPRJ182578
Project StatusCompleted
Project CategoryResidential
DistrictBijnor
TalukaNajibabad
Start Date2020-12-01
Completion Date2023-12-31
Total Area (sqm)7680
Project Cost (Lacs)1980
Duration (Months)37
Registration Fee43500

Promoter Details

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter IDUPRERAPRM4243
Mobile63********

Project Team

rolename
ArchitectMukesh Ruhela
ContractorA. V. SINGH
Structural EngineerEr. A. V. Singh

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra13,14,42,44,49, 5065460

Development Works

work_namedescription
Demarcation of PlotsAs per attached layout plan
Boundary WallFor Plots no provision is made
Road WorkAs per approved layout plan provision of 24.00 mt wide road, 18.00 mt. wide road and 9.00 mt. wd. road are made. Construction of these Road are in progress. Crust design of road is 15.00 cm WBM ,15.00 cm WBM, 5.00 cm WMM Ist layer laid and IInd layer of WMM, BM and SDBC to be done.
FootpathsIn the internal colony roads of the proposed plots no provision of the scheme.
Water Supply Including Drinking Water FacilitiesFor fulfilling the need of water provision 01 no OHT of 330 KL capacity is provided and 02 nos pump house with rising main, Internal water line of 250 mm, 200 mm, 140mm, 125mm and 100 mm dia in progress.
Sewer SystemSewer system in progress with sewer pipe dia meter of 350 mm and 250 mm.
DrainConstruction of drain and culvert work in progress as per design section of CK, C1, C2, C3, C4, C5, C7, and C10 type.
Parks03 nos parks are Proposed in layout plan for Najibabad Yojna.
Tree PlantingTree plantation in progress and to be completed as per norms after allotment
Design For Electric Supply Including Street Lighting33/11 KVA electric sub station is proposed.
Community BuildingsCommunity center of 2572.00 Sq. Mt. is proposed for whole scheme as per layout plan.
Treatment and Disposal System of Sewage and Sullage water01 No STP is proposed of area 2234.00 Sq. Mt. for whole scheme as per layout plan.
Solid Waste Management And Disposal SystemNo provision as per sanction plan. Later on will provided as per norms.
Water Conservation SystemNot applicable for plots
Energy Management System Including Use of Renewable EnergyNot applicable for plots
Fire Protection And Fire Safety SystemFor residential plot not required although fire hydrants will be provided at different locations in layout plan as per design.
Social Infrastructure And Other Public Amenities Including Public Health ServicesAvailable in vicinity of scheme area of plots
Emergency Evacuation ServicesNot applicable for residential plots
Other Miscellaneous WorkScheme is situated adjoining to the city area and located on Kotdwar Najibabad Main Road in Najibabad Dist Bijnor.

Bank Details

Bank NameHDFC Bank
BranchSri Ganga Ice Factory Haridwar Road
Branch AddressSri Ganga Ice Factory, Haridwar Road Near Malla Godown Najibabad U.P. 246763
Account HolderUPAVP Kotdwar Road Yojana Najibabad
Account Number50100083190247
IFSC CodeHDFC0001941

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy