VRINDAVAN VIHAR

Shruti Garden

Bulandshahr, Uttar Pradesh

RERA approved

Approved

1st Oct 2022

Completion pending

Pending

5th Aug 2027

Registration No.

UPRERAPRJ818122

Project Type

Residential

District

Bulandshahr

Taluka

Khurja

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ818122
Project StatusNew
Project CategoryResidential
DistrictBulandshahr
TalukaKhurja
Start Date2022-10-01
Completion Date2027-08-05
Total Area (sqm)2781
Project Cost (Lacs)2277
Duration (Months)59
Registration Fee19000

Promoter Details

Promoter NameShruti Garden
Promoter IDUPRERAPRM223706
Mobile98********

Project Team

rolename
ArchitectAnuj Agarwal
ContractorSS Infratech- Through Sanjay Singh.
Structural EngineerAkhilesh Singh

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPlot No. GH-02, Kalindi Kunj Residential Scheme , Khurja2781.03

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
VRINDAVAN VIHARBSMNTOTHER00-
VRINDAVAN VIHARBSMNT2OTHER00-
VRINDAVAN VIHARBSMNT3OTHER00-
VRINDAVAN VIHARGFOTHER000
VRINDAVAN VIHAR14 BHK4146.04-
VRINDAVAN VIHAR12 BHK280.48-
VRINDAVAN VIHAR24 BHK4146.04-
VRINDAVAN VIHAR22 BHK280.48-
VRINDAVAN VIHAR34 BHK4146.04-
VRINDAVAN VIHAR32 BHK280.48-
VRINDAVAN VIHAR44 BHK4146.04-
VRINDAVAN VIHAR42 BHK280.48-

Development Works

work_namedescription
Demarcation of PlotsThe project land will be demarcated as per the approved layout. The setbacks and building lines will also be as per approved map.
Boundary Wall7 feet high boundary wall will be constructed with RCC wall/ column and brick work as per drawings. The design will be earthquake resistant. The finishing will be done with all weather paint.
Road WorkRigid pavement to cater the residents vehicles will be constructed. The PQC will be laid over 200 mm granular sub-base and 2 layers of water bound macadam . All layers will be compacted to density as per design.
FootpathsThe footpath will be 75mm high from roads . The 75mm cement-concrete interlocking tiles will be laid over 100mm thick PCC with sand bed of 50mm.
Water Supply Including Drinking Water FacilitiesThe water supply will be provided by Khurja Development Authority. The underground storage will be constructed to store and lift the water to roof tanks. Thereon the water will be supplied to individual units.
Sewer SystemThe sewer lines will be designed as per norms and the PVC pipes of 10 Kgf pressure will be used to carry the sewer. The sewer will be lead to municipal sewer line.
Drainunderground pipe line drains will be designed as per norms and laid in required slopes. The collection chambers will constructed to cater for the surface runoffs.
ParksThere will be two parks. The soft land scaping will be done along with lighting arrangements.
Tree PlantingThe tree of different varieties and in minimum numbers specified by the authority will be planted at all suitable locations of the project.
Design For Electric Supply Including Street LightingElectrical sub-station will be designed and installed as per UPPCL norms. MS street light designer poles with energy saving LED lights will be installed.
Community BuildingsNot applicable
Treatment and Disposal System of Sewage and Sullage waterNot applicable
Solid Waste Management And Disposal SystemDust bins will be installed in the suitable common areas of the project. The garbage collection and disposal arrangements will done by third-Party vendor mechanism.
Water Conservation SystemRain water harvesting pit as per the approved design in the specified project location to collect the surface and roof run-off to aid the ground water recharge.
Energy Management System Including Use of Renewable EnergySolar panels as per the MOE norms will be installed on the roof top.
Fire Protection And Fire Safety SystemThe fire fighting system as per the fire department norms will be installed in the project.. The separate fire case is designed for the evacuation services in the building. UP fire department./ NBC 2016 will be referred.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesSeparate stairs as per U.P fire department norms to assist smooth escape of residents in case of fire
Other Miscellaneous WorkAs per requirements of project.

Bank Details

Bank NameBANK OF BARODA
BranchLAXMANGANJ, KHURJA
Branch AddressMAHARAJA AGRASEN MARG, KHURJA
Account HolderSHRUTI GARDEN VRINDVAN VIHAR COLLECTION ACCOUNT
Account Number2582020000223
IFSC CodeBARB0KHURJA

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy