Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah
U.P. Awas Evam Vikas Parishad
Etawah, Uttar Pradesh
Approved
30th Sept 2020
Completed
31st Mar 2023
Registration No.
UPRERAPRJ362532
Project Type
Residential
District
Etawah
Taluka
Etawah
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ362532 |
| Project Status | Completed |
| Project Category | Residential |
| District | Etawah |
| Taluka | Etawah |
| Start Date | 2020-09-30 |
| Completion Date | 2023-03-31 |
| Total Area (sqm) | 500 |
| Project Cost (Lacs) | 288 |
| Duration (Months) | 31 |
| Registration Fee | 5000 |
Promoter Details
| Promoter Name | U.P. Awas Evam Vikas Parishad |
| Promoter ID | UPRERAPRM4243 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | Arvind Deo Arya |
| Contractor | Pradeep Kumar Executive Engineer U.P. Housing and Development Board |
| Structural Engineer | Dr. Pradeep Kumar |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 354, 366 | 11250 |
| Plot | GH-4 | 4302 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| B4 | GF | OTHER | 12 | 22.77 | 0 |
| B4 | 1 | OTHER | 12 | 22.77 | - |
| B4 | 2 | OTHER | 12 | 22.77 | - |
| B4 | 3 | OTHER | 12 | 22.77 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The Plot is clearly demarcated in Spining Mill Awasiya Yojna Etawah. As per the sanctioned layout the plot is situated facing 18.00 m wide road in layout. Apart from 18.00 m wide road 5.00 m wide road and 6.00 m wide road are also proposed in layout encompassing this plot. |
| Boundary Wall | Boundary wall is not included in the proposed projected. It will be constructed seprate project. |
| Road Work | Road work for the whole scheme is completed. In the proposed project of 48 Nos. of houses 5.00 meter wide road 48.00 meter in length 6.00 meter wide road 74.00 meter length which is shown in layout is to be constructed as seperate project. |
| Footpaths | Footpaths are not proposed in the sanctioned layout plan of the project. |
| Water Supply Including Drinking Water Facilities | Over head tank and Water supply distribution system is already laid for the whole scheme. Only connection with main line is required for this project which will be done at completion stage as seperate project. |
| Sewer System | Main Sever Line of whole scheme had been completed. Only connection with main sewer line is required for this project which will be done at completion stage as seperate project. |
| Drain | Drainage system of whole scheme are in under project which is likely to be completed November 2020. Internal drain approx 74.00 meter length to be constructed as seperate project. |
| Parks | Construction of boundary wall/RCC grill of the proposed park in the scheme is already completed. For the particular project as per layout park is loacted at with in the vicinity of hardly 80.00 m from the proposed project. |
| Tree Planting | Tree plantation in the scheme is under progress which will be done on roads and parks of the scheme. For the mentioned plot of PMAY 48 Nos. of houses plantation on 5.00 m and 6.00 m wide road will be done after drain and road work. |
| Design For Electric Supply Including Street Lighting | Electric supply including street lighting is not included in the proposed projected. It will be constructed seprate project. |
| Community Buildings | Community building is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project. |
| Treatment and Disposal System of Sewage and Sullage water | Treatment and disposal system of sewage and sullage water is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project. |
| Solid Waste Management And Disposal System | Solid waste management and disposal system is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project. |
| Water Conservation System | In the presence proposed PMAY housing scheme unit area of individual flat is very small thus water conservation system is not the part of this project. |
| Energy Management System Including Use of Renewable Energy | In the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR. |
| Fire Protection And Fire Safety System | In the present proposed PMAY Housing scheme Fire proctetion and fire safety system is not the part of approved DPR. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Public Amenities such as schools, hospitals etc are available in nearby vicinity |
| Emergency Evacuation Services | Sufficient No of staircases is being proposed in the building |
| Other Miscellaneous Work | Ample amount of open areas park etc are available in the Spining Mill Awasiya Yojna Etawah |
Bank Details
| Bank Name | HDFC BANK |
| Branch | ETAWH |
| Branch Address | ETAWAH |
| Account Holder | EX ENG CONST UNIT UP AWAS EVAM VIKAS PARISHAD ETAWAH |
| Account Number | 50100320737918 |
| IFSC Code | HDFC0009596 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in