Construction of 48 Nos Flats (G+3) Under Pradhanmantri Awas Yojna (AHP) at Spining Mill Awasiya Yojna Etawah

U.P. Awas Evam Vikas Parishad

Etawah, Uttar Pradesh

RERA approved

Approved

30th Sept 2020

Project completed

Completed

31st Mar 2023

Registration No.

UPRERAPRJ362532

Project Type

Residential

District

Etawah

Taluka

Etawah

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ362532
Project StatusCompleted
Project CategoryResidential
DistrictEtawah
TalukaEtawah
Start Date2020-09-30
Completion Date2023-03-31
Total Area (sqm)500
Project Cost (Lacs)288
Duration (Months)31
Registration Fee5000

Promoter Details

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter IDUPRERAPRM4243
Mobile97********

Project Team

rolename
ArchitectArvind Deo Arya
ContractorPradeep Kumar Executive Engineer U.P. Housing and Development Board
Structural EngineerDr. Pradeep Kumar

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra354, 36611250
PlotGH-44302

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
B4GFOTHER1222.770
B41OTHER1222.77-
B42OTHER1222.77-
B43OTHER1222.77-

Development Works

work_namedescription
Demarcation of PlotsThe Plot is clearly demarcated in Spining Mill Awasiya Yojna Etawah. As per the sanctioned layout the plot is situated facing 18.00 m wide road in layout. Apart from 18.00 m wide road 5.00 m wide road and 6.00 m wide road are also proposed in layout encompassing this plot.
Boundary WallBoundary wall is not included in the proposed projected. It will be constructed seprate project.
Road WorkRoad work for the whole scheme is completed. In the proposed project of 48 Nos. of houses 5.00 meter wide road 48.00 meter in length 6.00 meter wide road 74.00 meter length which is shown in layout is to be constructed as seperate project.
FootpathsFootpaths are not proposed in the sanctioned layout plan of the project.
Water Supply Including Drinking Water FacilitiesOver head tank and Water supply distribution system is already laid for the whole scheme. Only connection with main line is required for this project which will be done at completion stage as seperate project.
Sewer SystemMain Sever Line of whole scheme had been completed. Only connection with main sewer line is required for this project which will be done at completion stage as seperate project.
DrainDrainage system of whole scheme are in under project which is likely to be completed November 2020. Internal drain approx 74.00 meter length to be constructed as seperate project.
ParksConstruction of boundary wall/RCC grill of the proposed park in the scheme is already completed. For the particular project as per layout park is loacted at with in the vicinity of hardly 80.00 m from the proposed project.
Tree PlantingTree plantation in the scheme is under progress which will be done on roads and parks of the scheme. For the mentioned plot of PMAY 48 Nos. of houses plantation on 5.00 m and 6.00 m wide road will be done after drain and road work.
Design For Electric Supply Including Street LightingElectric supply including street lighting is not included in the proposed projected. It will be constructed seprate project.
Community BuildingsCommunity building is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Treatment and Disposal System of Sewage and Sullage waterTreatment and disposal system of sewage and sullage water is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Solid Waste Management And Disposal SystemSolid waste management and disposal system is proposed in layout of Spining Mill Awasiya Yojna Etawah. Which is not too far away from this project.
Water Conservation SystemIn the presence proposed PMAY housing scheme unit area of individual flat is very small thus water conservation system is not the part of this project.
Energy Management System Including Use of Renewable EnergyIn the present proposed PMAY Housing scheme energy management system including use of renewable energy is not proposed in the approved DPR.
Fire Protection And Fire Safety SystemIn the present proposed PMAY Housing scheme Fire proctetion and fire safety system is not the part of approved DPR.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPublic Amenities such as schools, hospitals etc are available in nearby vicinity
Emergency Evacuation ServicesSufficient No of staircases is being proposed in the building
Other Miscellaneous WorkAmple amount of open areas park etc are available in the Spining Mill Awasiya Yojna Etawah

Bank Details

Bank NameHDFC BANK
BranchETAWH
Branch AddressETAWAH
Account HolderEX ENG CONST UNIT UP AWAS EVAM VIKAS PARISHAD ETAWAH
Account Number50100320737918
IFSC CodeHDFC0009596

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy