Om Heights 01
OM HEIGHTS
Firozabad, Uttar Pradesh
Approved
1st Apr 2023
Pending
30th Mar 2027
Registration No.
UPRERAPRJ466704
Project Type
Residential
District
Firozabad
Taluka
Firozabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ466704 |
| Project Status | New |
| Project Category | Residential |
| District | Firozabad |
| Taluka | Firozabad |
| Start Date | 2023-04-01 |
| Completion Date | 2027-03-30 |
| Total Area (sqm) | 2025 |
| Project Cost (Lacs) | 906 |
| Duration (Months) | 48 |
| Registration Fee | 15500 |
Promoter Details
| Promoter Name | OM HEIGHTS |
| Promoter ID | UPRERAPRM223185 |
| Mobile | 93******** |
Project Team
| role | name |
|---|---|
| Architect | Vinod Sharma |
| Contractor | Self |
| Structural Engineer | Er. Mahendra Singh Sekhawat |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | Plot No. 01 on Khasra No. 357, Mauja Tapa Khurd, Firozabad | 2024.95 |
| Plot | Plot No. 01 on Khasra No. 357, Mauja Tapa Khurd, Firozabad | 2024.95 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| OM HEIGHTS -01 | BSMNT | OTHER | 0 | 0 | - |
| OM HEIGHTS -01 | BSMNT2 | OTHER | 0 | 0 | - |
| OM HEIGHTS -01 | BSMNT3 | OTHER | 0 | 0 | - |
| OM HEIGHTS -01 | GF | 2 BHK | 2 | 75.53 | 0 |
| OM HEIGHTS -01 | GF | 3 BHK | 2 | 86.11 | 0 |
| OM HEIGHTS -01 | GF | 3 BHK | 2 | 87.97 | 0 |
| OM HEIGHTS -01 | 1 | 2 BHK | 2 | 75.53 | - |
| OM HEIGHTS -01 | 1 | 3 BHK | 3 | 86.11 | - |
| OM HEIGHTS -01 | 1 | 3 BHK | 2 | 87.97 | - |
| OM HEIGHTS -01 | 2 | 2 BHK | 2 | 75.53 | - |
| OM HEIGHTS -01 | 2 | 3 BHK | 2 | 86.11 | - |
| OM HEIGHTS -01 | 2 | 3 BHK | 2 | 87.97 | - |
| OM HEIGHTS -01 | 3 | 2 BHK | 2 | 75.53 | - |
| OM HEIGHTS -01 | 3 | 3 BHK | 2 | 86.11 | - |
| OM HEIGHTS -01 | 3 | 3 BHK | 2 | 87.97 | - |
| OM HEIGHTS -01 | 4 | 2 BHK | 2 | 75.53 | - |
| OM HEIGHTS -01 | 4 | 3 BHK | 2 | 86.11 | - |
| OM HEIGHTS -01 | 4 | 3 BHK | 2 | 87.97 | - |
| OM HEIGHTS -01 | 5 | 2 BHK | 2 | 75.53 | - |
| OM HEIGHTS -01 | 5 | 3 BHK | 2 | 86.11 | - |
| OM HEIGHTS -01 | 5 | 3 BHK | 2 | 87.97 | - |
| OM HEIGHTS -01 | 6 | 2 BHK | 2 | 75.53 | - |
| OM HEIGHTS -01 | 6 | 3 BHK | 2 | 86.11 | - |
| OM HEIGHTS -01 | 6 | 3 BHK | 2 | 87.97 | - |
| OM HEIGHTS -01 | 7 | 2 BHK | 2 | 75.53 | - |
| OM HEIGHTS -01 | 7 | 3 BHK | 2 | 86.11 | - |
| OM HEIGHTS -01 | 7 | 3 BHK | 2 | 87.97 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | The project land will be demarcated with the boundary wall. The plot will be demarcated as per approved map from FSDA maintaining the offsets of boundary wall to building line. |
| Boundary Wall | The brick wall will be plastered and Painted. The wall foundation will be to ensure the earthquake resistance. The cement mortar will be used t bond and the all season paint will be used. |
| Road Work | The paver block interlocking patter will be laid over the sand bed of 50 to 80 mm. The layer underneath will be compacted granular layer. The strength of the paver block will be as per design under anticipated load. the minimum thickness of paver block will be 80mm M-35. |
| Footpaths | The interlocking pavers will be laid over the sand bed and compacted granular layer. |
| Water Supply Including Drinking Water Facilities | The ground/ Municipal water will be pumped to the underground water tank of capacity 35KL. The water from there will be pumped to the terrace tanks and in turn supplied to individual units through PVC pipes. |
| Sewer System | Sewer System will be installed in the project. 110 OD UPVC pipes will be installed for soil and waste water. also the Vertical and multi floor trap along with man holes and inspection chambers will e installed. The sewer will be lead to STP |
| Drain | Sub Surface lined drain with inspection chambers will be installed at ground and 110 OD upvc pies in building to cater for waste water through multi floor traps . The drain water will be discharged in the municipal drain |
| Parks | The park will be on the adjoining land of the project |
| Tree Planting | Tree plantation will be done along the boundary wall of the project . The trees selection will be as per local soil type and considering the growth patter so as no to interfere with the project utilities. |
| Design For Electric Supply Including Street Lighting | The electrical supply will be done as per approved design and load from the local electrical body. The electrical distribution will be done with boxes and individual meters will be for each unit. The load approval will be s per required load for projects common areas and facilities along with domestic usage. |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | The state of art multi stage sewage treatment plant will be installed of capacity 57KLD covering the area of 60 square meter with height of 6m. The sewage will be treated to bring the effluents within limit for safe disposal. |
| Solid Waste Management And Disposal System | The waste collection bins will be installed on each floors and common location and the collected waste will be disposed through the existing municipal collection method. |
| Water Conservation System | The rain water harvesting pit with multi stage filtration system will be installed in collection chamber where the rainwater on surface runoffs will be collected and discharged to ground through 150mm diameter perforated pipe. |
| Energy Management System Including Use of Renewable Energy | The project will use all the green technologies and electrical methods for construction and development of the project. |
| Fire Protection And Fire Safety System | The fire extinguishers will be installed at all floors and common areas. The wet riser system with separate water tank will be installed as per the approved norms of the fire department |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | The stairs will be designed to assist the emergency evacuation. All the norms of fire department will be followed for safe access in case of fire |
| Other Miscellaneous Work | As per Project requirement. |
Bank Details
| Bank Name | Punjab National Bank |
| Branch | SSI Branch, Firozabad |
| Branch Address | Ganesh Nagar, Firozabad, 283203 |
| Account Holder | Om Heights Collection Account For Om Heights 01 |
| Account Number | 0959102900000010 |
| IFSC Code | PUNB0095910 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





