BOULEVARD WALK (PHASE 4)
REGAL EMPORIA INFRATECH PRIVATE LIMITED
Gautam Buddha Nagar, Uttar Pradesh
Approved
1st Sept 2017
Completed
29th Mar 2023
Registration No.
UPRERAPRJ15654
Project Type
Commercial
District
Gautam Buddha Nagar
Taluka
Gautam Buddha Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ15654 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Gautam Buddha Nagar |
| Taluka | Gautam Buddha Nagar |
| Start Date | 2017-09-01 |
| Completion Date | 2023-03-29 |
| Total Area (sqm) | 547 |
| Project Cost (Lacs) | 1594 |
| Duration (Months) | 67 |
| Registration Fee | 10940 |
Promoter Details
| Promoter Name | REGAL EMPORIA INFRATECH PRIVATE LIMITED |
| Promoter ID | UPRERAPRM6522 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | MODARCHINDIA |
| Contractor | MONTE CARLO LTD |
| Structural Engineer | OPTIMIZATION CONSULTANTS |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | C-02 | 547 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| MULTIPLEX | GF | OTHER | 0 | 0 | 0 |
| MULTIPLEX | 1 | OTHER | 0 | 0 | - |
| MULTIPLEX | 2 | OTHER | 0 | 0 | - |
| MULTIPLEX | 3 | OTHER | 1 | 445.82 | - |
| MULTIPLEX | 3 | OTHER | 1 | 74.35 | - |
| MULTIPLEX | 3 | OTHER | 1 | 74.32 | - |
| MULTIPLEX | 3 | OTHER | 1 | 111.49 | - |
| MULTIPLEX | 3 | OTHER | 1 | 94.51 | - |
| MULTIPLEX | 4 | OTHER | 5 | 74.33 | - |
| MULTIPLEX | 4 | OTHER | 1 | 74.01 | - |
| MULTIPLEX | 4 | OTHER | 1 | 73.92 | - |
| MULTIPLEX | 4 | OTHER | 1 | 74.31 | - |
| MULTIPLEX | 4 | OTHER | 4 | 74.32 | - |
| MULTIPLEX | 4 | OTHER | 1 | 74.07 | - |
| MULTIPLEX | 4 | OTHER | 1 | 74.57 | - |
| MULTIPLEX | 4 | OTHER | 2 | 74.47 | - |
| MULTIPLEX | 4 | OTHER | 1 | 74.34 | - |
| MULTIPLEX | 4 | OTHER | 1 | 121.86 | - |
| MULTIPLEX | 4 | OTHER | 1 | 148.24 | - |
| MULTIPLEX | 4 | OTHER | 1 | 66.15 | - |
| MULTIPLEX | 4 | OTHER | 1 | 88.96 | - |
| MULTIPLEX | 4 | OTHER | 2 | 74.30 | - |
| MULTIPLEX | 4 | OTHER | 2 | 74.41 | - |
| MULTIPLEX | 4 | OTHER | 1 | 74.27 | - |
| MULTIPLEX | 4 | OTHER | 1 | 74.24 | - |
| MULTIPLEX | 4 | OTHER | 2 | 74.36 | - |
| MULTIPLEX | 4 | OTHER | 1 | 73.81 | - |
| MULTIPLEX | 4 | OTHER | 1 | 66.43 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | AS PER PLAN |
| Boundary Wall | AS PER PLAN |
| Road Work | AS PER PLAN |
| Footpaths | AS PER PLAN |
| Water Supply Including Drinking Water Facilities | Since municipal water supply may not be expected to fulfill the entire requirement, it is proposed to meet the total water requirement for the campus by other source/external supply such as bore wells etc. Water shall be passed through a multi grade filter, softened and chlorinated prior to the supply to the buildings |
| Sewer System | Soil & Waste from Toilet & Kitchen will be collected separately for soil & waster pipe line and after that sewer pipe line laid underground with manhole & connected to Centralized STP |
| Drain | Separate line for rain water with Harvesting pit & Other line for soil & waste and connected to STO |
| Parks | AS PER PLAN |
| Tree Planting | AS PER PLAN |
| Design For Electric Supply Including Street Lighting | Efficient & Effective design of substation with 100% Power back up & street light in walk way and parks . Adequate design to reduce losses in transmission & distribution . |
| Community Buildings | AS PER PLAN |
| Treatment and Disposal System of Sewage and Sullage water | Sewer water treatment through Centralized STP with their disposal arrangement |
| Solid Waste Management And Disposal System | AS PER PLAN |
| Water Conservation System | VFD based hydro pneumatic pumps used with sensor , treated STP water used for flushing & Horticulture |
| Energy Management System Including Use of Renewable Energy | VFD based Pumps & equipment selected on best energy efficient point . Photoelectric senor used for external and common area light with provision of solar energy |
| Fire Protection And Fire Safety System | Internal & external hydrant system , sprinkler ,Heat Detector, smoke detector MCP & Fire Extinguishers in all floors . As per Fire norms |
| Social Infrastructure And Other Public Amenities Including Public Health Services | AS PER PLAN |
| Emergency Evacuation Services | AS PER PLAN |
| Other Miscellaneous Work | AS PER PLAN |
Bank Details
| Bank Name | INDUSIND BANK LIMITED |
| Branch | INDUSIND BANK, SECTOR-18, NOIDA BRANCH |
| Branch Address | SECTOR-18, NOIDA, UP-201301 |
| Account Holder | REGAL EMPORIA INFRATECH PRIVATE LIMITED SEPARATE BANK ACCOUNT FOR BOULEVARD WALK PHASE-04 |
| Account Number | 250027002929 |
| IFSC Code | INDB0000036 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





