New Launch - India Real Estate Report 2026.

CYBERTHUM PHASE II

MAX-DIGI INFOTECH PRIVATE LIMITED

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Sept 2021

Project completed

Completed

25th Sept 2024

Registration No.

UPRERAPRJ452606

Project Type

Commercial

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ452606
Project StatusCompleted
Project CategoryCommercial
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2021-09-01
Completion Date2024-09-25
Total Area (sqm)54398
Project Cost (Lacs)43100
Duration (Months)37
Registration Fee554000

Promoter Details

Promoter NameMAX-DIGI INFOTECH PRIVATE LIMITED
Promoter IDUPRERAPRM70627
Mobile98********

Project Team

rolename
ArchitectKULMEET SHANGARI ACPL Design Limited
ContractorPARMESH CONSTRUCTION COMPANY LIMITED
Structural EngineerDr. Vinod Jain

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPLOT NO. 2, SECTOR 140 A NOIDA108800

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
PHASE F (Block-B)BSMNTOTHER00-
PHASE F (Block-B)BSMNT2OTHER00-
PHASE F (Block-B)BSMNT3OTHER00-
PHASE F (Block-B)GFOTHER13319.3330
PHASE F (Block-B)1OTHER13866.986-
PHASE F (Block-B)2OTHER16959.865-
PHASE F (Block-B)3OTHER1101.439-
PHASE G (Block C)BSMNTOTHER00-
PHASE G (Block C)BSMNT2OTHER00-
PHASE G (Block C)BSMNT3OTHER00-
PHASE G (Block C)GFOTHER13815.3670
PHASE G (Block C)1OTHER12188.193-
PHASE G (Block C)2OTHER13690.719-
PHASE G (Block C)3OTHER12434.743-
PHASE C ( IT-3)BSMNTOTHER00-
PHASE C ( IT-3)BSMNT2OTHER00-
PHASE C ( IT-3)BSMNT3OTHER00-
PHASE C ( IT-3)GFOTHER1821.7480
PHASE C ( IT-3)1OTHER00-
PHASE C ( IT-3)2OTHER1469.857-
PHASE C ( IT-3)3OTHER1469.857-
PHASE C ( IT-3)4OTHER1992.964-
PHASE C ( IT-3)5OTHER00-
PHASE C ( IT-3)6OTHER1905.964-
PHASE C ( IT-3)7OTHER1992.964-
PHASE C ( IT-3)8OTHER11060.944-
PHASE C ( IT-3)9OTHER11060.944-
PHASE D ( IT-4)BSMNTOTHER00-
PHASE D ( IT-4)BSMNT2OTHER00-
PHASE D ( IT-4)BSMNT3OTHER00-
PHASE D ( IT-4)GFOTHER1821.7480
PHASE D ( IT-4)1OTHER00-
PHASE D ( IT-4)2OTHER1469.857-
PHASE D ( IT-4)3OTHER1469.857-
PHASE D ( IT-4)4OTHER1992.964-
PHASE D ( IT-4)5OTHER00-
PHASE D ( IT-4)6OTHER1905.964-
PHASE D ( IT-4)7OTHER1992.964-
PHASE D ( IT-4)8OTHER11060.944-
PHASE D ( IT-4)9OTHER11060.944-

Development Works

work_namedescription
Demarcation of PlotsThe Project landwill be demarcated by its boundary wall to the exact shape, size and orientation as per sanction map by Noida Development Authority.
Boundary WallA 2.4M High boundary wall of brick and plaster will be constrution with deep foundation to be earthquake resistant. The wall will then be plastered and painted as per asthetics.
Road WorkA pavement quality concrete will be laid in thickness of + 200 mm on top of compacted Dry lean concrete/ coarse grained sub-base.
FootpathsAn M-15 grade of paver block/ inter locking tiles will be laid in the project for walking areas. Tiles will be 3 to 4 inch thick and the colour patters will be lasting and visible at all hours.
Water Supply Including Drinking Water FacilitiesA portable ground water supply through and pumping arrangement will be delivered to the water tank of 25000l capacity of terrace.
Sewer SystemThe sewage will be collected through a soil pipe arrangement, U-bends and inspection chambers leading to the septic tank of the project, from where the sewage will be disposed to the STP system.
DrainA surface drain with specs of 150mm CC sub-base over compacted earth topped with 20mm of cement mortar to the size of 150 x 75 laid in slope of 1 to 300 leading to GT.
ParksTwo lush green parks will be maintained in the project per apporved plan by Noida development authority. The parks will have foothpaths, sitting area and small play area for kids.
Tree PlantingThe trees will be planted at all suitable loactions of the project and along the boundary wall. The tree section will be done to enusre no hindrance in the services for future
Design For Electric Supply Including Street LightingElectrical layout and capacity will be installed to suffice the domestic use of the project. The load sanctions will be taken from the Vidyut Vibhag.
Community BuildingsNOT APPLICABLE
Treatment and Disposal System of Sewage and Sullage waterCENTRALISED STP TO TREAT THE SEWEAGE
Solid Waste Management And Disposal SystemPROJECT SHALL HAVE WASTE SEGREGATION AREA AND OWC FRO TREATMENT
Water Conservation SystemRain Water harvesting System, Duel Flush System.
Energy Management System Including Use of Renewable EnergyLED LIGHT AND TIMER CONTROL RANELS SHALL BE USED FOR EFFICIENT ENERGY MANAGEMENT
Fire Protection And Fire Safety SystemFIRE ALARM SYSTEM PROVIDED
Social Infrastructure And Other Public Amenities Including Public Health ServicesNOT APPLICABLE
Emergency Evacuation ServicesAS PER APPROVED BUILDING PLAN
Other Miscellaneous WorkAS PER APPROVED BUILDING PLAN

Bank Details

Bank NameICICI BANK
BranchSECTOR 137 NOIDA
Branch AddressVIVANTE,104,PLOT NO. GH-07A, SECTOR 137, NOIDA
Account HolderMax Digi Infotech Pvt.Ltd.
Account Number345105000910
IFSC CodeICIC0003451

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy