New Launch - India Real Estate Report 2026.

DLF Techpark Noida Phase 2

URVASI INFRATECH PRIVATE LIMITED

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Apr 2023

Completion pending

Pending

30th Sept 2026

Registration No.

UPRERAPRJ385951/08/2024

Project Type

Commercial

District

Gautam Buddha Nagar

Taluka

Dadri

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ385951/08/2024
Project StatusNew
Project CategoryCommercial
DistrictGautam Buddha Nagar
TalukaDadri
Start Date2023-04-01
Completion Date2026-09-30
Total Area (sqm)24796
Project Cost (Lacs)18469
Duration (Months)42
Registration Fee258000

Promoter Details

Promoter NameURVASI INFRATECH PRIVATE LIMITED
Promoter IDUPRERAPRM190453
Mobile95********

Project Team

rolename
ArchitectROHIT SAINI
ContractorM/s RSB INFRASTRUCTURE LIMITED
Structural EngineerRAKESH CHAUHAN

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPlot No. 1, Sector 143 A, Noida24,796.04

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Block DGFOTHER14787.3680
Block D1OTHER14352.078-
Block D2OTHER14352.078-
Block D3OTHER14352.078-
Block D4OTHER14352.078-
Block D5OTHER14352.078-
Block D6OTHER14352.078-
Block D7OTHER14373.228-
Block D8OTHER14352.078-
Block D9OTHER14373.228-
Block D10OTHER14373.228-
Block D11OTHER14373.228-
Block D12OTHER14373.228-
Block EGFOTHER14787.3680
Block E1OTHER14352.078-
Block E2OTHER14352.078-
Block E3OTHER14352.078-
Block E4OTHER14352.078-
Block E5OTHER14352.078-
Block E6OTHER14352.078-
Block E7OTHER14373.228-
Block E8OTHER14352.078-
Block E9OTHER14373.228-
Block E10OTHER14373.228-
Block E11OTHER14373.228-
Block E12OTHER14373.228-

Development Works

work_namedescription
Demarcation of PlotsWe have 3 side road plot of total size 100256 sq. mtr. (proposed project covered 33310 sq. mtr.) having 3 entrance gate towards east side (45 m. wide road), 2 entrance gate towards south side (45 m . Wide road) and 1 entrance gate towards west side (30 m. Wide road)
Boundary Wall"Data Centre 2 - The total boundary wall height is 2400mm and barbed wire above. (Data Centre 3) - The total boundary wall height is 2400mm and barbed wire above."
Road WorkData Centre 2 & 3) - Minimum 6M wide driveways are planned in tremix.
Footpaths" Data Centre 2 & 3) - Barrier free pedestrian movement is planned to connect different areas while avoiding vehicular clashes."
Water Supply Including Drinking Water Facilities(Data Centre 2 &3 )Treated water supply is provided through WTP Plant Room.
Sewer System"Combined STP Provided for Data Centre 1,IT Block of Phase 1 & Data Centre 2 also. MBBR STP provided in Campus."
DrainStorm water drainage provided. Storm water from Terrace, Roads and other landscape area shall be connected to Storm water drain channel with its further connectivity to Rain water harvesting Pit for recharge the Ground water. Overflow from RWH Pit shall be connected to Municipal drain line.
Parks" Data Centre 2 & 3) - Green area is planned along plot line and along the building. Multipurpose lawn is also planned."
Tree Planting" Data Centre 2 &3) - Trees are planned along boundary wall as buffer planting. Trees are also planned along building."
Design For Electric Supply Including Street Lighting"Common Area and Base Build lighting shall be Planned . As far as concern of High Side electrical System shall be deigned by STT(Client) We will design & implement Electrical System as per NBC Code/ Local Electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc."
Community BuildingsNot proposed
Treatment and Disposal System of Sewage and Sullage waterMBBR STP provided in Campus. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system, when would come into force.
Solid Waste Management And Disposal System" Block B - Combined STP Provided for Data Centre1 ,IT Block of Phase 1 and Data Centre 2 also"
Water Conservation SystemProject shall be planned with low flow fixtures as well dual flush cistern. Further rainwater harvesting system is also proposed to improve the ground water level.
Energy Management System Including Use of Renewable Energy" Data Centre 2 & 3 - We have provided LED Lighting for common area and external infra. Solar power generation we are using."
Fire Protection And Fire Safety SystemFire Fighting and Fire Protection system is planned in campus as per NBC Code.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot proposed.
Emergency Evacuation ServicesFire staircase shall be provided. And Refuse area shall also be provided as part of emergency evacuation services.
Other Miscellaneous WorkNot proposed

Bank Details

Bank NameICICI Bank
BranchK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch AddressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Account HolderUrvasi Infratech Private Limited - Collection A/c - DLF Techpark Noida Phase 2
Account Number342005000156
IFSC CodeICIC0000031

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy