DLF Techpark Noida
URVASI INFRATECH PRIVATE LIMITED
Gautam Buddha Nagar, Uttar Pradesh
Approved
6th Jan 2021
Completed
1st Apr 2024
Registration No.
UPRERAPRJ720547
Project Type
Commercial
District
Gautam Buddha Nagar
Taluka
Dadri
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ720547 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Gautam Buddha Nagar |
| Taluka | Dadri |
| Start Date | 2021-01-06 |
| Completion Date | 2024-04-01 |
| Total Area (sqm) | 33310 |
| Project Cost (Lacs) | 32685 |
| Duration (Months) | 39 |
| Registration Fee | 344000 |
Promoter Details
| Promoter Name | URVASI INFRATECH PRIVATE LIMITED |
| Promoter ID | UPRERAPRM190453 |
| Mobile | 95******** |
Project Team
| role | name |
|---|---|
| Architect | Ujjal Kar - R.N. Gupta & Associates |
| Contractor | RP Singh - Chandralekha Constructions Pvt. Ltd. AND Sarvjit Saini - B L Kashyap and Sons Ltd. |
| Structural Engineer | Mr Pankish Goel |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | Plot No. 1, Sector 143 A, Noida | 33310 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Block A (IT) | GF | SHOP | 1 | 136.21 | 0 |
| Block A (IT) | GF | SHOP | 1 | 104.86 | 0 |
| Block A (IT) | GF | SHOP | 1 | 89.54 | 0 |
| Block A (IT) | GF | SHOP | 1 | 136.21 | 0 |
| Block A (IT) | GF | OTHER | 1 | 125.5 | 0 |
| Block A (IT) | GF | OTHER | 1 | 125.5 | 0 |
| Block A (IT) | 1 | OTHER | 1 | 1606.47 | - |
| Block A (IT) | 1 | OTHER | 1 | 1614.45 | - |
| Block A (IT) | 2 | OTHER | 1 | 1094.81 | - |
| Block A (IT) | 2 | OTHER | 1 | 1100.26 | - |
| Block A (IT) | 2 | OTHER | 1 | 1100.06 | - |
| Block A (IT) | 2 | OTHER | 1 | 1100.21 | - |
| Block A (IT) | 3 | OTHER | 1 | 1094.81 | - |
| Block A (IT) | 3 | OTHER | 1 | 1100.26 | - |
| Block A (IT) | 3 | OTHER | 1 | 1100.06 | - |
| Block A (IT) | 3 | OTHER | 1 | 1100.21 | - |
| Block A (IT) | 4 | OTHER | 1 | 1094.81 | - |
| Block A (IT) | 4 | OTHER | 1 | 1100.26 | - |
| Block A (IT) | 4 | OTHER | 1 | 1100.06 | - |
| Block A (IT) | 4 | OTHER | 1 | 1100.21 | - |
| Block A (IT) | 5 | OTHER | 1 | 1094.81 | - |
| Block A (IT) | 5 | OTHER | 1 | 1100.26 | - |
| Block A (IT) | 5 | OTHER | 1 | 1100.06 | - |
| Block A (IT) | 5 | OTHER | 1 | 1100.21 | - |
| Block A (IT) | 6 | OTHER | 1 | 911.6 | - |
| Block A (IT) | 6 | OTHER | 1 | 916.6 | - |
| Block A (IT) | 6 | OTHER | 1 | 1008.09 | - |
| Block A (IT) | 6 | OTHER | 1 | 1008.24 | - |
| Block B (Data Centre) | GF | OTHER | 1 | 2787.54 | 0 |
| Block B (Data Centre) | 1 | OTHER | 1 | 3090.15 | - |
| Block B (Data Centre) | 2 | OTHER | 1 | 3090.15 | - |
| Block B (Data Centre) | 3 | OTHER | 1 | 3090.15 | - |
| Block B (Data Centre) | 4 | OTHER | 1 | 3090.15 | - |
| Block B (Data Centre) | 5 | OTHER | 1 | 3090.15 | - |
| Block B (Data Centre) | 6 | OTHER | 1 | 3110.04 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have 3 side road plot of total size 100256 sq. mtr. (proposed project covered 33310 sq. mtr.) having 3 entrance gate towards east side (45 m. wide road), 2 entrance gate towards south side (45 m . Wide road) and 1 entrance gate towards west side (30 m. Wide road) |
| Boundary Wall | Block A (IT Building) - The total boundary wall height is 2400mm with 600mm high toe wall and 1800mm high railing. Block B (Data Centre) - The total boundary wall height is 2400mm and barbed wire above. |
| Road Work | Block A (IT Building) - Minimum 6M wide Driveways are planned in concrete pavers. Block B (Data Centre) - Minimum 6M wide driveways are planned in tremix. |
| Footpaths | Block A (IT Building) - Barrier free pedestrian movement is planned to connect different areas while avoiding vehicular clashes. Block B (Data Centre) - Barrier free pedestrian movement is planned to connect different areas while avoiding vehicular clashes. |
| Water Supply Including Drinking Water Facilities | For both Block A (IT) and B (Data Centre), Treated water supply is provided through WTP Plant Room. |
| Sewer System | Combined STP Provided for Data Centre and IT Block. MBBR STP provided in Campus. |
| Drain | Storm water drainage provided. Storm water from Terrace, Roads and other landscape area shall be connected to Storm water drain channel with its further connectivity to Rain water harvesting Pit for recharge the Ground water. Overflow from RWH Pit shall be connected to Municipal drain line. |
| Parks | Block A (IT Building) - Green area is planned along plot line and along the building.Lawns are also planned. Block B (Data Centre) - Green area is planned along plot line and along the building. Multipurpose lawn is also planned. |
| Tree Planting | Block A (IT Building) - Trees are planned along boundary wall as buffer planting. Trees are also planned along building to create focal points. Block B (Data Centre) - Trees are planned along boundary wall as buffer planting. Trees are also planned along building. |
| Design For Electric Supply Including Street Lighting | Common Area and Base Build lighting shall be Planned . As far as concern of High Side electrical System shall be confirm by STT We will design & implement Electrical System as per NBC Code/ Local Electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. |
| Community Buildings | Not proposed |
| Treatment and Disposal System of Sewage and Sullage water | MBBR STP provided in Campus. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system, when would come into force. |
| Solid Waste Management And Disposal System | Block A - Shall be planned and proposed as per Solid Waste Management Rules. Block B - Combined STP Provided for Data Centre and IT Block. |
| Water Conservation System | Project shall be planned with low flow fixtures as well dual flush cistern. Further rainwater harvesting system is also proposed to improve the ground water level. |
| Energy Management System Including Use of Renewable Energy | Block A - We have provided LED Lighting , Energy Efficient HVAC System and generation of renewable solar energy and back to grid. Block B - We have provided LED Lighting for common area and external infra. Solar power generation we are using. |
| Fire Protection And Fire Safety System | Fire Fighting and Fire Protection system is planned in campus as per NBC Code. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not proposed. |
| Emergency Evacuation Services | Fire staircase shall be provided. And Refuse area shall also be provided as part of emergency evacuation services. |
| Other Miscellaneous Work | Not proposed. |
Bank Details
| Bank Name | ICICI BANK LIMITED |
| Branch | CONNAUGHT PLACE, NEW DELHI |
| Branch Address | 9A, PHELPS BUILDING, CONNAUGHT PLACE, NEW DELHI |
| Account Holder | M/S URVASI INFRATECH PRIVATE LIMITED-COLLECTION AC FOR DLF TECHPARK NOIDA |
| Account Number | 000705053510 |
| IFSC Code | ICIC0000007 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate