EXPRESS ZENITH (TOWER A)

Express Builders & Promoters Pvt. Ltd.

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Mar 2024

Project completed

Completed

24th Mar 2026

Registration No.

UPRERAPRJ980703/04/2024

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ980703/04/2024
Project StatusCompleted
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2024-03-01
Completion Date2026-03-24
Total Area (sqm)3900
Project Cost (Lacs)9571
Duration (Months)25
Registration Fee130000

Promoter Details

Promoter NameExpress Builders & Promoters Pvt. Ltd.
Promoter IDUPRERAPRM4493
Mobile98********

Project Team

rolename
ArchitectFourth Dimension
ContractorKVS CONSTRUCTION
Structural EngineerOPTIMUM DESIGN PVT LTD

Land Details

typekhasra_or_plot_noarea_sqmt
Plot2A21700

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
A13 BHK2100.50-
A13 BHK1100.21-
A13 BHK1101.06-
A13 BHK2101.83-
A13 BHK2100.00-
A23 BHK2100.50-
A23 BHK1100.21-
A23 BHK1101.06-
A23 BHK2101.83-
A23 BHK2100.00-
A33 BHK2100.50-
A33 BHK1100.21-
A33 BHK1101.06-
A33 BHK2101.83-
A33 BHK2100.00-
A43 BHK2100.50-
A43 BHK1100.21-
A43 BHK1101.06-
A43 BHK2101.83-
A43 BHK2100.0-
A53 BHK2100.50-
A53 BHK1100.21-
A53 BHK2101.83-
A53 BHK2100.00-
A63 BHK2100.50-
A63 BHK1100.21-
A63 BHK1101.06-
A63 BHK2101.83-
A63 BHK2100.00-
A73 BHK2100.50-
A73 BHK1100.21-
A73 BHK1101.06-
A73 BHK2101.83-
A73 BHK2100.00-
A83 BHK2100.50-
A83 BHK1100.21-
A83 BHK1101.06-
A83 BHK2101.83-
A83 BHK2100.00-
A93 BHK2100.50-
A93 BHK1100.21-
A93 BHK1101.06-
A93 BHK2101.83-
A93 BHK2100.00-
A103 BHK2100.50-
A103 BHK1100.21-
A103 BHK1101.06-
A103 BHK2101.83-
A103 BHK2100.00-
A113 BHK2100.50-
A113 BHK1100.21-
A113 BHK1101.06-
A113 BHK2101.83-
A113 BHK2100.00-
A123 BHK2100.50-
A123 BHK1100.21-
A123 BHK1101.06-
A123 BHK2101.83-
A123 BHK2100.00-
A133 BHK2100.50-
A133 BHK1100.21-
A133 BHK2101.83-
A133 BHK2100.00-
A143 BHK2100.50-
A143 BHK1100.21-
A143 BHK1101.06-
A143 BHK2101.83-
A143 BHK2100.00-
A15PENTHOUSE2175.03-
A154 BHK1216.67-
A154 BHK1227.00-
A154 BHK1211.79-
A164 BHK1216.67-
A164 BHK1227.00-
A164 BHK1211.79-
NON TOWERGFSHOP120.760
NON TOWERGFSHOP222.720
NON TOWERGFSHOP126.650
NON TOWERGFSHOP128.300
NON TOWERGFSHOP125.200
NON TOWERGFSHOP130.740
A53 BHK1101.06-
A133 BHK1101.06-
COMMERCIAL-AGFSHOP139.580
COMMERCIAL-AGFSHOP630.250
COMMERCIAL-AGFSHOP130.100
COMMERCIAL-AGFSHOP128.930
COMMERCIAL-AGFSHOP140.730
COMMERCIAL-AGFOTHER119.930
COMMERCIAL-AGFOTHER612.870
COMMERCIAL-AGFOTHER117.370
COMMERCIAL-AGFOTHER112.800
COMMERCIAL-AGFOTHER112.300

Development Works

work_namedescription
Demarcation of PlotsNot applicable
Boundary Wall6ft height boundary wall of RCC wall /column and brick work as per drawings
Road WorkCement Concrete Road over the subbase 100mm thick PCC
FootpathsNot applicable
Water Supply Including Drinking Water Facilitieswater connection for the domestic uses will be Provided by the NOIDA and Storage will be done in under ground water tank of the capacity as per the norms.
Sewer SystemMain Sewer line has been designed as per norms and pvc pipe of 10 kg pressure will be used in the vertical stacks in the shafts,partially sewer line will lay in basement ceiling and will finally connect to STP.
DrainUnderground pipeline drain will be lay in slope as per norms and collecting chambers as per the norms will be provide to collect the surface rain water
Parkssoft Landscape has been done in the park with sufficient electrical lighting
Tree PlantingTree Plantation of the different variable of tree as per the site conditions has been done
Design For Electric Supply Including Street LightingM.S street light Designer poles with energy saving LED lighting fixtures will be use.
Community BuildingsThe community building has been completed as per sanction plan
Treatment and Disposal System of Sewage and Sullage waterSTP will be installed at basement for treated the Sewer and treated water will be recycled for use in flushing and gardeining.
Solid Waste Management And Disposal Systemwill be done by the external vendors by collecting the garbage from the dustbin/shops and segreggate the same for the recycling the dry waste and prepare the compost from the wet waste.
Water Conservation Systemrain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area
Energy Management System Including Use of Renewable EnergySolar panel will be installed on the terrace for the conservation of the electricity as per the norms of MOE.
Fire Protection And Fire Safety SystemSystem will be provided as per the fire department guidelines to fullfil the fire norms as per the NBC
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable
Emergency Evacuation Servicesseparate fire stair case is designed for evacuation service in the building
Other Miscellaneous WorkNot applicable

Bank Details

Bank NameHDFC BANK
BranchSECTOR 62 - NOIDA
Branch AddressHDFC BANK LTD C-25, STELLAR IT PARK,
Account HolderEBPPL ZENITH TOWER A COLLECTION ACCOUNT
Account Number57500001416447
IFSC CodeHDFC0002649

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy