New Launch - India Real Estate Report 2026.

GULSHAN AVANTE

Gulshan Developers Private Limited

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

5th May 2023

Completion pending

Pending

30th Apr 2028

Registration No.

UPRERAPRJ860880

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ860880
Project StatusNew
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2023-05-05
Completion Date2028-04-30
Total Area (sqm)5417
Project Cost (Lacs)13313
Duration (Months)60
Registration Fee32500

Promoter Details

Promoter NameGulshan Developers Private Limited
Promoter IDUPRERAPRM210893
Mobile95********

Project Team

rolename
ArchitectAmit Gangal
ContractorGulshan Developers Pvt. Ltd.
Structural EngineerV. D. Sharma

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-03A, Sector-16B, Greater Noida, Uttar Pradesh5417

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER-AGFSHOP141.430
TOWER-AGFSHOP132.550
TOWER-AGFSHOP147.340
TOWER-AGFSHOP141.260
TOWER-A1OTHER00-
TOWER-A24 BHK1164.25-
TOWER-A24 BHK1164.25-
TOWER-A34 BHK2164.25-
TOWER-A44 BHK2164.25-
TOWER-A54 BHK2164.25-
TOWER-A64 BHK2164.25-
TOWER-A74 BHK2164.25-
TOWER-A84 BHK2164.25-
TOWER-A94 BHK2164.92-
TOWER-A124 BHK2164.25-
TOWER-A134 BHK2164.25-
TOWER-A144 BHK2164.25-
TOWER-A154 BHK2164.25-
TOWER-A164 BHK2164.25-
TOWER-A104 BHK2164.25-
TOWER-A174 BHK2164.25-
TOWER-A184 BHK2164.25-
TOWER-A194 BHK2164.25-
TOWER-A204 BHK2164.25-
TOWER-A214 BHK2164.25-
TOWER-A224 BHK2164.25-
TOWER-A234 BHK2164.25-
TOWER-A244 BHK2164.25-
TOWER-A114 BHK2164.25-
TOWER-BGFOTHER000
TOWER-B1OTHER00-
TOWER-B24 BHK1164.25-
TOWER-B24 BHK1164.25-
TOWER-B34 BHK2164.25-
TOWER-B44 BHK2164.25-
TOWER-B54 BHK2164.25-
TOWER-B64 BHK2164.25-
TOWER-B74 BHK2164.25-
TOWER-B84 BHK2164.25-
TOWER-B94 BHK2164.25-
TOWER-B104 BHK2164.25-
TOWER-B114 BHK2164.25-
TOWER-B124 BHK2164.25-
TOWER-B134 BHK2164.25-
TOWER-B144 BHK2164.25-
TOWER-B154 BHK2164.25-
TOWER-B164 BHK2164.25-
TOWER-B174 BHK2164.25-
TOWER-B184 BHK2164.25-
TOWER-B194 BHK2164.25-
TOWER-B204 BHK2164.25-
TOWER-B214 BHK2164.25-
TOWER-B224 BHK2164.25-
TOWER-B234 BHK2164.25-
TOWER-B244 BHK2164.25-

Development Works

work_namedescription
Demarcation of PlotsAs per lease plan.
Boundary WallBrick Work and Permanent Furnishing on boundary wall of 7 feets height .
Road WorkCement concrete road with laying of pavers on top with the width of 7.5 meters .
FootpathsStone paving as per landscape architect plan Fire path way of 7.50 mtr.
Water Supply Including Drinking Water FacilitiesMunicipal water supply is collected in an underground storage reservoir. Underground storage of water is also required as reserve for firefighting purposes. It is proposed to provide static storage for firefighting as per the present requirements of NBC Over Head storage thanks are proposed to be placed on the terrace. It is proposed to have approximately half day requirement storage for fire fighting purposes also as per National Building code.
Sewer SystemThe soil waste from toilets kitchen will be collected in single network of sewer pipes laid underground having manholes/ inspection chambers at appropriate intervals. It is proposed to install sewage treatment plan on the site for treatment of sewage.
DrainThe Terrace and balconies of the buildings are proposed to be drained by means of down take pipes while open areas and roads would be drained in to drains. These drains are proposed to be aligned along the rods within the Complex as per the landscape design. The down take pipes from terraces and balconies would discharge in to the municipal drainage system after passing through rain water harvesting and ground water recharging structures.
ParksLandscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches and walkways. proposed landscape area in the project is 1044.907spmt.
Tree PlantingAs per landscape consultant / as per IGBC green building norms . One tree per 100 sqmt pf open area is proposed having approx 45 Trees in total.
Design For Electric Supply Including Street LightingThe Building shall be supplied power by the state Electricity Board. Since the source is unstable due to frequent brown out /black outs, it is proposed that full DG power backup shall be provided to all the common service and apartment. Some critical load such as emergency lighting headed equipment of ELV system etc. shall be additionally backed up using UPS battery backup system. the electrical power requirement for the project has been estimate based on 50 watt/ sq.mtr of built up areas, of the apartment ( As per up electricity ) lighting for streets, car park area , landscape areas, walkways (both covered and and uncovered) shall be automatically controlled by timer as per the time zone . LED shall be used to in all common area and external lighting to reduce power consumption.
Community BuildingsClub house as per plan having Multi purpose hall GYM Gaming Zone cafeteria spa / salon senior lounge.
Treatment and Disposal System of Sewage and Sullage waterIt is proposed to install sewage treatment plant on the site for treatment of sewage . The quantity of recycle water required in flushing horticulture shall be treated up to tertiary level and the balance total capacity of sewage treatment plant =100 KLD.
Solid Waste Management And Disposal SystemSegregation of soild waste and provision of Organic waste converter.
Water Conservation SystemA. The operation of pumps will be based on level sensors to ensure that water is not wasted and to avoid unnecessary operation of the equipment. B. Pumps equipment will be selected on best energy efficiency point. C. water conservation will be provided using low flow fixtures/ flow restrictors . D. Dual flush flushing cisterns will reduce water consumption. The water conservation in dual flush will be maximum 3 liters for low flush and 6 liters for high flush. E. sensor based urinals will be installed to ensure flushing only when in use to reduce the water consumption , F. provision of sewage treatment plant is proposed to treat 100 waste water generated. G. Recycle of treated effluent will reduce the total net fresh water demand of the project. Thereby reducing the load and dependency on municipal supply.
Energy Management System Including Use of Renewable EnergyA. All lifts shall be provided with AC variable voltage variable frequency drives (ACVVF). B. Power factor shall be maintained 0.90 to unity . C. Astronomical Timers shall be used to switch ON/OFF street lighting and landscape lighting for power conservation. D. Timers shall be used to switch ON/OFF parking lights during non- Peak hours for power conservation. E. LED shall be used to in all common area and external lighting to reduce power consumption F. Controller based Synchronization along with PLC based load management is proposed to reduce the oil consumption and effective utilization of DG sets. G. All DG sets will be CPCB certified for noise and emissions.
Fire Protection And Fire Safety SystemThe project falls under Residential Buildings category A-4 ( Apartment) having height above 60 meters for apartment buildings. as per the nbc-2016 table 7, page 41and 42. Internal and external fire hydrant system shall be provide with landing valve hose reel with shut off nozzle short branch pipe with nozzle and fire mans axe . Automatic sprinklers system is provided. The system shall be suitably zoned for its optimum functional performance. sprinklers shall be distributed throughout the building as per the national building code and IS; 15105 requirements. In order to the fire / smoke in incipient stages an intelligent / Addressable automatic fire detection alarm system is proposed to be provided to cover all areas to provide timely warning to occupants to evacuate safely before the fire/ smoke spreads. The system shall be full zoned addressable, digital self- diagnostic and cover all internal and external areas.
Social Infrastructure And Other Public Amenities Including Public Health ServicesClub swimming pool etc.
Emergency Evacuation ServicesFire staircase /refuge area to be provided as per sanction plan .
Other Miscellaneous WorkCommercial space with in complex.

Bank Details

Bank NameICICI BANK LTD
BranchNOIDA SECTOR-137, NOIDA
Branch AddressSECTOR-137 , NOIDA GULSHAN VIVAVTE, NOIDA-201301
Account HolderGULSHAN DEVELOPERS PRIVATE LIMITED COLLECTION ACCOUNT FOR GULSHAN AVANTE
Account Number777705662801
IFSC CodeICIC0003451

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy