New Launch - India Real Estate Report 2026.

INDOSAM75

Indosam Infra Private Limited

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

14th Jan 2014

Project completed

Completed

31st Dec 2019

Registration No.

UPRERAPRJ10087

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ10087
Project StatusCompleted
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2014-01-14
Completion Date2019-12-31
Total Area (sqm)15771
Project Cost (Lacs)17887
Duration (Months)72
Registration Fee84000

Promoter Details

Promoter NameIndosam Infra Private Limited
Promoter IDUPRERAPRM4464
Mobile70********

Project Team

rolename
ArchitectSPACE DESIGNERS
ContractorFASTECH PROJECTS PRIVATE LIMITED
Structural EngineerOPTIMUM DESIGN

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-0515771.23

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
BGF3 BHK287.350
BGF3 BHK3104.860
B13 BHK387.35-
B13 BHK3104.86-
B23 BHK387.35-
B23 BHK3104.86-
B33 BHK387.35-
B33 BHK3104.86-
B43 BHK387.35-
B43 BHK3104.86-
B53 BHK387.35-
B53 BHK3104.86-
B63 BHK387.35-
B63 BHK3104.86-
B73 BHK387.35-
B73 BHK3104.86-
B83 BHK387.35-
B83 BHK3104.86-
B93 BHK387.35-
B93 BHK3104.86-
B103 BHK387.35-
B103 BHK3104.86-
B113 BHK387.35-
B113 BHK3104.86-
B123 BHK387.35-
B123 BHK3104.86-
B133 BHK387.35-
B133 BHK3104.86-
C13 BHK299.32-
C14 BHK2143.41-
C23 BHK299.32-
C24 BHK2143.41-
C33 BHK299.32-
C34 BHK2143.41-
C43 BHK299.32-
C44 BHK2143.41-
C53 BHK299.32-
C54 BHK2143.41-
C64 BHK2143.41-
C73 BHK299.32-
C74 BHK2143.41-
C83 BHK299.32-
C84 BHK2143.41-
C63 BHK299.32-
C93 BHK299.32-
C94 BHK2143.41-
C103 BHK299.32-
C104 BHK2143.41-
C113 BHK299.32-
C114 BHK2143.41-
C123 BHK299.32-
C124 BHK2143.41-
C133 BHK299.32-
C134 BHK2143.41-
C143 BHK299.32-
C144 BHK2143.41-
C153 BHK299.32-
C154 BHK2143.41-
C163 BHK299.32-
C164 BHK2143.41-
C173 BHK299.32-
C174 BHK2143.41-
C183 BHK299.32-
C184 BHK2143.41-
D12 BHK355.68-
D12 BHK565.15-
D13 BHK375.77-
D22 BHK355.68-
D22 BHK565.15-
D23 BHK375.77-
D32 BHK355.68-
D32 BHK565.15-
D33 BHK375.77-
D42 BHK355.68-
D42 BHK565.15-
D43 BHK375.77-
D52 BHK355.68-
D52 BHK565.15-
D53 BHK375.77-
D62 BHK355.68-
D62 BHK565.15-
D63 BHK375.77-
D72 BHK355.68-
D72 BHK565.15-
D73 BHK375.77-
D82 BHK355.68-
D82 BHK565.15-
D83 BHK375.77-
D92 BHK355.68-
D92 BHK565.15-
D93 BHK375.77-
D102 BHK355.68-
D102 BHK565.15-
D103 BHK375.77-
D112 BHK355.68-
D112 BHK565.15-
D113 BHK375.77-
D122 BHK355.68-
D122 BHK565.15-
D123 BHK375.77-
D132 BHK565.15-
D133 BHK375.77-
D142 BHK355.68-
D142 BHK565.15.-
D143 BHK375.77-
D152 BHK355.68-
D152 BHK565.15-
D153 BHK375.77-
D162 BHK355.68-
D162 BHK565.15-
D163 BHK375.77-
D172 BHK355.68-
D172 BHK565.15-
D173 BHK375.77-
D182 BHK355.68-
D182 BHK565.15-
D183 BHK375.77-
FGF3 BHK185.610
F13 BHK175.77-
F13 BHK385.61-
F23 BHK275.77-
F23 BHK485.61-
F33 BHK275.77-
F33 BHK485.61-
F43 BHK275.77-
F43 BHK485.61-
F53 BHK275.77-
F53 BHK485.61-
F63 BHK275.77-
F63 BHK485.61-
F73 BHK275.77-
F73 BHK485.61-
F83 BHK275.77-
F83 BHK485.61-
F93 BHK275.77-
F93 BHK485.61-
F103 BHK275.77-
F103 BHK485.61-
F113 BHK275.77-
F113 BHK485.61-
F123 BHK275.77-
F123 BHK485.61-
F133 BHK275.77-
F133 BHK485.61-
F113 BHK485.61-

Development Works

work_namedescription
Demarcation of PlotsPlot no.GH-05, Sector-75, Noida of area 15771.23 sq. mtrs.
Boundary WallBoundary wall of approx. 1950 mm high along the periphery
Road WorkCement concrete roads
Footpathsinterlock tiles
Water Supply Including Drinking Water FacilitiesUnderground tank and respective overhead tank of each tower
Sewer SystemUnderground sewer line
DrainUnderground drains with catch pits
Parks2110 sq mtrs of parks/common greens to be provided
Tree Planting144 trees to be planted
Design For Electric Supply Including Street LightingOne compact sub-station of 11 KVA input and LT supply through main HT panel. Street light provided.
Community BuildingsClub at Tower -F, Ground floor
Treatment and Disposal System of Sewage and Sullage water345 KLD STP. Treated water used for irrigation and surplus to be discharged in public drain.
Solid Waste Management And Disposal SystemManual handling of solid waste and disposal
Water Conservation SystemFour rain water harvesting pits and recycling of treated waste water as far as possible
Energy Management System Including Use of Renewable EnergyEnergy management through compact sub-station
Fire Protection And Fire Safety SystemHydrant system with pumps station shall be provided
Social Infrastructure And Other Public Amenities Including Public Health ServicesRetail Shopping complex, Reception lobby and Amphi theater
Emergency Evacuation ServicesFire stairs provided in each building
Other Miscellaneous WorkAs and when required

Bank Details

Bank NameDCB BANK LIMITED
BranchSECTOR-18, NOIDA
Branch AddressSECTOR-18, NOIDA
Account HolderINDOSAM INFRA PRIVATE LIMITED
Account Number11922000000091
IFSC CodeDCBL0000119

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy