Jaypee Greens, E-6 Land2, Greater Noida
Jaiprakash Associates Limited
Gautam Buddha Nagar, Uttar Pradesh
Approved
27th Oct 2010
Completed
31st Aug 2018
Registration No.
UPRERAPRJ5679
Project Type
Residential
District
Gautam Buddha Nagar
Taluka
Gautam Buddha Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ5679 |
| Project Status | Completed |
| Project Category | Residential |
| District | Gautam Buddha Nagar |
| Taluka | Gautam Buddha Nagar |
| Start Date | 2010-10-27 |
| Completion Date | 2018-08-31 |
| Total Area (sqm) | 836 |
| Project Cost (Lacs) | 0 |
| Duration (Months) | 95 |
| Registration Fee | 8360 |
Promoter Details
| Promoter Name | Jaiprakash Associates Limited |
| Promoter ID | UPRERAPRM6273 |
| Mobile | 96******** |
Project Team
| role | name |
|---|---|
| Architect | Arcop Associates Pvt. Ltd. |
| Contractor | NA |
| Structural Engineer | TPC Technical Projects Consultants (P) Ltd. |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | C3-33, Land-2, Sec-26&31, Gr. Noida | 836 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| E-6, Land-2 (C3-33) | BSMNT | VILLA | 0 | 36.69 | - |
| E-6, Land-2 (C3-33) | GF | VILLA | 1 | 250.68 | 2 |
| E-6, Land-2 (C3-33) | 1 | VILLA | 0 | 213.15 | - |
| E-6, Land-2 (C3-33) | 2 | VILLA | 0 | 32.16 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | "Location of Plot : As per Approved Layout and development plan. The Plot has been demarcated as per approved Layout Plan of Land 2 Jaypee Greens, Greater Noida. Status: Demarcation complete." |
| Boundary Wall | "This Project is part of Jaypee Greens Land-2, Sector 26 & 31, Greater Noida. The Over all Boundary Wall of of entire development has been Constructed. Being gated community, separate boundary wall for this Project is not proposed. However Boundary wall is proposed in Front and Rear side which is to be completed by allottee." |
| Road Work | "The Approach Road to the project is Completed. The Internal Roads Connecting the Plot have been completed." |
| Footpaths | The Pedestrian Foot Paths with Concrete Pavers / Broom finish Concrete / Cobblestone with Kerb Stone along the road as per Layout plan has been completed. |
| Water Supply Including Drinking Water Facilities | "The Pipe Lines for pressurised Water Supply has been laid and Completed for over all Jaypee Greens (which include this unit). Water supply is being made from water treatment plant. Supply to unit shall be given at one point at boundary." |
| Sewer System | "Sewer System have been laid and Completed with Sewerage Treatment Plant already operational for over all Jaypee Greens (which include this unit). Disposal system of unit shall be connected to nearest Man Hole." |
| Drain | "The Drainage System for over all Jaypee Greens (which include this unit) has been laid and functional. The Drainage Water is being Collected in Lakes of Golf Courses for the purpose of rain water harvesting." |
| Parks | Parks / landscaped areas has been developed and completed as per Approved Landscape plan for entire development. |
| Tree Planting | The Tree Planting has been completed as per Approved Landscape Layout for entire development. |
| Design For Electric Supply Including Street Lighting | Electric Supply System and Electric Sub Station is complete. Supply shall be provided at one point along boundary wall. External Electrical System with Street Lighting is complete and operational. |
| Community Buildings | Community Facilities (Social club, Swimming pool, Health club, outdoor sports facilities, etc.) for the over all Jaypee Greens has been completed. |
| Treatment and Disposal System of Sewage and Sullage water | The Sewage is being treated at Sewerage Treatment Plant. The Sullage is Converted into Compost. The Sullage Water after necessary treatment is being used for Irrigation of Landscaped areas. |
| Solid Waste Management And Disposal System | The Solid Waste is being collected from door to door. The Segregated waste is being transported through facility management maintenance company to the identified sites of Greater Noida Authority for necessary disposal. |
| Water Conservation System | Rain Water Harvesting system is functional. |
| Energy Management System Including Use of Renewable Energy | Automated (Timer based) system for LED street lighting and irrigation works has being provided. |
| Fire Protection And Fire Safety System | Fire Protection System and Fire Hydrants for over all Jaypee Greens has been completed and functional. Fire Station with all the infrastructure facilities and staff has been provided. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Convenient Shopping Centre, Integrated sports complex, School, Club facilities etc. have already been provided. |
| Emergency Evacuation Services | Being Independent Unit, building is accessible from all sides and building plans are approved by Fire Authority. |
| Other Miscellaneous Work | Receiving Station, Electric Sub station with DG Power Backup, Fire Station, Telephone lines, FTTH System are completed and operational. Parks & Playgrounds are completed and are in use. Completion for all the services have been obtained from Statutory Authorities. |
Bank Details
| Bank Name | ICICI Bank |
| Branch | GREATER NOIDA |
| Branch Address | KRISHNA APRA ROYAL PLAZA, D-2,E(ACB) ALPHA-1, GREATER NOIDA-UTTAR PRADESH- 201306 |
| Account Holder | Jaypee Greens (A division of Jaiprakash Associates Ltd)-E2-06-(I) |
| Account Number | 025405003615 |
| IFSC Code | ICIC0000254 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





