New Launch - India Real Estate Report 2026.

Jaypee Greens Kassia I, SDZ, YEW

Jaiprakash Associates Limited

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

19th Feb 2011

Project completed

Completed

31st Dec 2019

Registration No.

UPRERAPRJ4716

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ4716
Project StatusCompleted
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2011-02-19
Completion Date2019-12-31
Total Area (sqm)16439
Project Cost (Lacs)0
Duration (Months)107
Registration Fee87500

Promoter Details

Promoter NameJaiprakash Associates Limited
Promoter IDUPRERAPRM6273
Mobile96********

Project Team

rolename
ArchitectM/s Design Forum International
ContractorJaiprakash Associates Limited
Structural Engineer"M/s NNC DESIGN INTERNATION"

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-G1-A16439

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
KAS004BSMNTOTHER00-
KAS004GFOTHER1142.220
KAS0041OTHER1145.76-
KAS00421 BHK168.60-
KAS005BSMNTOTHER00-
KAS005GFOTHER1142.220
KAS0051OTHER1145.76-
KAS00521 BHK168.60-
KAS006BSMNTOTHER00-
KAS006GFOTHER1142.220
KAS0061OTHER1145.76-
KAS00621 BHK168.60-
KAS007BSMNTOTHER00-
KAS007GFOTHER1142.220
KAS0071OTHER1145.76-
KAS00721 BHK168.60-
KAS008BSMNTOTHER00-
KAS008GFOTHER1142.220
KAS0081OTHER1145.76-
KAS00821 BHK168.60-
KAS009BSMNTOTHER00-
KAS009GFOTHER1142.220
KAS0091OTHER1145.76-
KAS00921 BHK168.60-
KAS010BSMNTOTHER00-
KAS010GFOTHER1142.220
KAS0101OTHER1145.76-
KAS01021 BHK168.60-
KAS011BSMNTOTHER00-
KAS011GFOTHER1142.220
KAS0111OTHER1145.76-
KAS01121 BHK168.60-
KAS012BSMNTOTHER00-
KAS012GFOTHER1142.220
KAS0121OTHER1145.76-
KAS01221 BHK168.60-
KAS014BSMNTOTHER00-
KAS014GFOTHER1142.220
KAS0141OTHER1145.76-
KAS01421 BHK168.60-
KAS015BSMNTOTHER00-
KAS015GFOTHER1142.220
KAS0151OTHER1145.76-
KAS01521 BHK168.60-
KAS016BSMNTOTHER00-
KAS016GFOTHER1142.220
KAS0161OTHER1145.76-
KAS01621 BHK168.60-
KAS017BSMNTOTHER00-
KAS017GFOTHER1142.220
KAS0171OTHER1145.76-
KAS01721 BHK168.60-
KAS018BSMNTOTHER00-
KAS018GFOTHER1142.220
KAS0181OTHER1145.76-
KAS01821 BHK168.60-
KAS019BSMNTOTHER00-
KAS019GFOTHER1142.220
KAS0191OTHER1145.76-
KAS01921 BHK168.60-
KAS020BSMNTOTHER00-
KAS020GFOTHER1142.220
KAS0201OTHER1145.76-
KAS02021 BHK168.60-
KAS021BSMNTOTHER00-
KAS021GFOTHER1142.220
KAS0211OTHER1145.76-
KAS02121 BHK168.60-
KAS022BSMNTOTHER00-
KAS022GFOTHER1142.220
KAS0221OTHER1145.76-
KAS02221 BHK168.60-
KAS023BSMNTOTHER00-
KAS023GFOTHER1142.220
KAS0231OTHER1145.76-
KAS02321 BHK168.60-
KAS024BSMNTOTHER00-
KAS024GFOTHER1142.220
KAS0241OTHER1145.76-
KAS02421 BHK168.60-
KAS025BSMNTOTHER00-
KAS025GFOTHER1142.220
KAS0251OTHER1145.76-
KAS02521 BHK168.60-
KAS026BSMNTOTHER00-
KAS026GFOTHER1142.220
KAS0261OTHER1145.76-
KAS02621 BHK168.60-
KAS027BSMNTOTHER00-
KAS027GFOTHER1142.220
KAS0271OTHER1145.76-
KAS02721 BHK168.60-

Development Works

work_namedescription
Demarcation of Plots"As per location of Plot : NE - Insitutional plot SE - 28 M Wide Master Plan Road SW -24 M Wide Master Plan Road NW -Insitutional/Green The Plot has been demarcated"
Boundary Wall"This Project is part of Sports City Township. The over all boundary wall / fencing of the Township has been constructed except few Passages. Cluster boundary wall of the project has been planned and the same shall be constructed along with the completion of construction of all of the towers."
Road Work"The 30 M wide approach road to the project is completed. The internal roads connecting the towers have been planned as per submission drawings. The internal roads shall be constructed before completion of Project."
FootpathsThe pedestrian footpaths with Kerb Stone as per Landscape Plan have been planned and the same shall be constructed before completion of Project
Water Supply Including Drinking Water Facilities"The pipe lines for water supply have been partially laid at Township Level. The drinking water is avaialable and is being supplied through water centre after necessary treatments as and when required. The tapping points for individual towers shall be made available and the same shall be connected before completion of Project. "
Sewer SystemThe internal drain system is planned to be completed before completion of the project . The pipe lines for Sewer System have been planned at Township Level. The tapping points will be completed as and when required along with completion of project and occupancy of residents thereof. The facility for treating sewage is available at the Sewage Treatment Plant , presently operational in the township .
Drain"The drainage system has been laid at Township Level.The planned internal storm system has been laid out . The drainage water is being collected in seasonal ponds and lakes of Boulevard. The planned tapping points for the project shall be available and the same will be connected as and when required. "
ParksParks / Play fields are planned at Township Level. The planned green areas within the cluster are planned to be completed before completion of project.
Tree Planting"Tree planting as per approved landscape plan at township level is complete. The tree planting at cluster level shall be done as and when required before completion of the Towers."
Design For Electric Supply Including Street Lighting"The electric supply from Grid Sub Station as planned for the Township is complete. The tapping points for the project are available and the same are being connected as and when required. "
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterThe sewage will be treated at Sewage Treatment Plant. The sullage will be converted into compost. The sullage water after necessary treatment will be supplied for flushing, irrigation and landscaping.
Solid Waste Management And Disposal SystemThe solid waste to be collected from door to door apartments after occupancy of resident will be transferred to segregation centres planned at Sewege Treatment Plant at Township level. The segregated waste shall be transported through facility management maintenance company to the identified sites of YEIDA Authority for necessary disposal. Solid waste management agency shall be deployed for collection of any solid waste generated during construction stage.
Water Conservation SystemTreated water from Sewage Treatment Plant shall be used for irrigation and road washing, flushing etc.
Energy Management System Including Use of Renewable EnergyAs per approved environment impact assessment authority advice
Fire Protection And Fire Safety SystemThe Fire Station with all the infrastructure facilities and staff is planned at Township level. Towers and basements are being provided with all the provisions of Fire Protection & Safety System as laid down in respective fire approval from the fire department. Fire tender is available at Township level.
Social Infrastructure And Other Public Amenities Including Public Health ServicesAt township level, Higher Secondary School (Sardar Patel Vidyalaya), Temples, Cafeteria, Police Outpost, Dispensery facilities etc. have already been provided. World class Formula -1 is operational within the Township and round the year races , corporate events etc are being hosted and held in Buddh International Circuit. International standard Cricket Stadium with Outfield, spectator stands already made ready and corporate league and other cricket matches are being held at the Cricket Ground.
Emergency Evacuation ServicesFire Escape Staircases are being provided in tower and basements as per Norms laid down in respective fire approval of the fire department.
Other Miscellaneous WorkAt Township Level Sewage Treatment Plant & Service Centres, Electric Grid Sub station with DG Power Backup, Fire tenders and mobile fire saftey equipments, Boulevard & Parks and Seasonal ponds have been provided.

Bank Details

Bank NameICICI Bank
BranchExpress Trade Tower2
Branch AddressPlot No. B-36, Sec 132, Noida – 201303
Account HolderJAIPRAKASH ASSOCIATES LTD. - KASSIA I
Account Number157905001284
IFSC CodeICIC0001579

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy