New Launch - India Real Estate Report 2026.

Jaypee Greens, V-08 Land 2, Greater Noida

Jaiprakash Associates Limited

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

30th Apr 2018

Project completed

Completed

28th Oct 2021

Registration No.

UPRERAPRJ15914

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ15914
Project StatusCompleted
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2018-04-30
Completion Date2021-10-28
Total Area (sqm)605
Project Cost (Lacs)5795362
Duration (Months)42
Registration Fee6050

Promoter Details

Promoter NameJaiprakash Associates Limited
Promoter IDUPRERAPRM6273
Mobile96********

Project Team

rolename
ArchitectArcop Associates Pvt. Ltd.
ContractorNA
Structural EngineerNA

Land Details

typekhasra_or_plot_noarea_sqmt
PlotC7-05, Land-2, Sec-26&31, Gr. Noida605

Development Works

work_namedescription
Demarcation of Plots"Location of Plot : As per Approved Layout and development plan. The Plot has been demarcated as per approved Layout Plan of Land 2 Jaypee Greens, Greater Noida. Status: Demarcation complete."
Boundary Wall"This Project is part of Jaypee Greens Land-2, Sector 26 & 31, Greater Noida. The Over all Boundary Wall of of entire development has been Constructed. Being gated community, separate boundary wall for this Project is not proposed. However Boundary wall is proposed in Front and Rear side which is to be completed by allottee."
Road Work"The Approach Road to the project is Completed. The Internal Roads Connecting the Plot have been completed."
FootpathsThe Pedestrian Foot Paths with Concrete Pavers / Broom finish Concrete / Cobblestone with Kerb Stone along the road as per Layout plan has been completed.
Water Supply Including Drinking Water Facilities"The Pipe Lines for pressurised Water Supply has been laid and Completed for over all Jaypee Greens (which include this unit). Water supply is being made from water treatment plant. Supply to unit shall be given at one point at boundary."
Sewer System"Sewer System have been laid and Completed with Sewerage Treatment Plant already operational for over all Jaypee Greens (which include this unit). Disposal system of unit shall be connected to nearest Man Hole."
Drain"The Drainage System for over all Jaypee Greens (which include this unit) has been laid and functional. The Drainage Water is being Collected in Lakes of Golf Courses for the purpose of rain water harvesting."
ParksParks / landscaped areas has been developed and completed as per Approved Landscape plan for entire development.
Tree PlantingThe Tree Planting has been completed as per Approved Landscape Layout for entire development.
Design For Electric Supply Including Street LightingElectric Supply System and Electric Sub Station is complete. Supply shall be provided at one point along boundary wall. External Electrical System with Street Lighting is complete and operational.
Community BuildingsCommunity Facilities (Social club, Swimming pool, Health club, outdoor sports facilities, etc.) for the over all Jaypee Greens has been completed.
Treatment and Disposal System of Sewage and Sullage waterThe Sewage is being treated at Sewerage Treatment Plant. The Sullage is Converted into Compost. The Sullage Water after necessary treatment is being used for Irrigation of Landscaped areas.
Solid Waste Management And Disposal SystemThe Solid Waste is being collected from door to door. The Segregated waste is being transported through facility management maintenance company to the identified sites of Greater Noida Authority for necessary disposal.
Water Conservation SystemRain Water Harvesting system is functional.
Energy Management System Including Use of Renewable EnergyAutomated (Timer based) system for LED street lighting and irrigation works has being provided.
Fire Protection And Fire Safety SystemFire Protection System and Fire Hydrants for over all Jaypee Greens has been completed and functional. Fire Station with all the infrastructure facilities and staff has been provided.
Social Infrastructure And Other Public Amenities Including Public Health ServicesConvenient Shopping Centre, Integrated sports complex, School, Club facilities etc. have already been provided.
Emergency Evacuation ServicesBeing Independent Unit, building is accessible from all sides and building plans are approved by Fire Authority.
Other Miscellaneous WorkReceiving Station, Electric Sub station with DG Power Backup, Fire Station, Telephone lines, FTTH System are completed and operational. Parks & Playgrounds are completed and are in use. Completion for all the services have been obtained from Statutory Authorities.

Bank Details

Bank NameHDFC Bank Ltd.
BranchKasturba Gandhi Marg, New Delhi
Branch Address209-214, Kailash Building, 26 K.G. Marg, New Delhi-110001
Account HolderJaypee Greens V2-08 Escrow Account
Account Number57500000201589
IFSC CodeHDFC0000003

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy