New Launch - India Real Estate Report 2026.

MIGSUN GALLERIA

Royalgolf link city projects private limited

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

5th Feb 2021

Project completed

Completed

17th Nov 2025

Registration No.

UPRERAPRJ187432

Project Type

Commercial

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ187432
Project StatusCompleted
Project CategoryCommercial
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2021-02-05
Completion Date2025-11-17
Total Area (sqm)10115
Project Cost (Lacs)5010
Duration (Months)58
Registration Fee112000

Promoter Details

Promoter NameRoyalgolf link city projects private limited
Promoter IDUPRERAPRM2179
Mobile99********

Project Team

rolename
ArchitectAHMED MIYAN
ContractorJB INFRATECH
Structural EngineerSANJEEV SHARMA

Land Details

typekhasra_or_plot_noarea_sqmt
PlotREP-02364285

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
1BSMNTOTHER00-
1GFSHOP29.320
1GFSHOP210.620
1GFSHOP418.700
1GFSHOP2220
1GFSHOP423.320
1GFSHOP1024.820
1GFSHOP427.280
1GFSHOP229.580
1GFSHOP1300
1GFSHOP430.360
1GFSHOP4632.120
1GFSHOP232.560
1GFSHOP632.920
1GFSHOP433.880
1GFSHOP834.220
1GFSHOP636.900
1GFSHOP241.360
1GFSHOP242.680
1GFSHOP443.060
1GFSHOP443.080
1GFSHOP255.440
1GFSHOP255.460
11SHOP29.32-
11SHOP210.62-
11SHOP311.04-
11SHOP213.40-
11SHOP413.64-
11SHOP214.02-
11SHOP614.06-
11SHOP214.74-
11SHOP3816.08-
11SHOP316.78-
11SHOP217-
11SHOP317.56-
11SHOP5618.46-
11SHOP219.16-
11SHOP319.40-
11SHOP219.48-
11SHOP219.96-
11SHOP420.02-
11SHOP220.04-
11SHOP220.36-
11SHOP220.46-
11SHOP420.72-
11SHOP220.84-
11SHOP221.32-
11SHOP223.50-
11SHOP426.78-
11SHOP426.98-
11SHOP827.44-
11SHOP127.88-
11SHOP428.10-
11SHOP428.86-
11SHOP434.08-
12SHOP29.32-
12SHOP210.62-
12SHOP127.6-
12OTHER132.64-
12OTHER1636.66-
12OTHER1239.90-
12OTHER447.86-
12OTHER1253.62-
12OTHER255.02-
12OTHER1271.64-
12OTHER177.96-
12OTHER178.34-
12OTHER2440.48-
12OTHER2483.10-
13SHOP29.32-
13SHOP210.62-
13SHOP127.60-
13SHOP1132.80-
13OTHER1636.66-
13OTHER1239.90-
13OTHER441.80-
13OTHER642.88-
14OTHER118.24-
14OTHER199.90-
14OTHER5102.60-
14OTHER1107.88-
14OTHER1128.98-
14OTHER1134.28-
14OTHER1138.22-
14OTHER1311.81-
14OTHER1316.79-
14OTHER1351.14-
14OTHER1352.04-
14OTHER11017.24-

Development Works

work_namedescription
Demarcation of PlotsDesigned plots are demarcated as per the sanctioned layout.
Boundary WallBoundary wall shall be commenced as soon as the construction work shall be started.;
Road Workinternal roads designed of different ROW as per the requirement.
FootpathsFootpath shall be provided as per the layout.
Water Supply Including Drinking Water FacilitiesMunicipal water supply plan shall be used for drinking purposes.
Sewer Systemsewerage system shall be used with STP as per the design calculation.
Drainseperate drainage line shall be used as per the design calculation.
Parkslandscape area shall be provided as per the local building byelaws.
Tree Plantingshall be provided as per the layout.
Design For Electric Supply Including Street LightingElectric supply including street light shall be provided as per the layout.
Community BuildingsTO BE COMPLETED AS PER APPROVED LAYOUT
Treatment and Disposal System of Sewage and Sullage waterdisposal system of the sewage and sullage water shall be used through STP for the purpose of landscaping and flushing.
Solid Waste Management And Disposal Systemall the solid waste managed as per the biodegradable waste converted into compost and non biogradable delivered to waste management as per the design.
Water Conservation SystemLow flow water fixtures shall be used for water conservation and STP water is used for landscaping and flushing purpose.
Energy Management System Including Use of Renewable EnergyTO BE COMPLETED AS PER APPROVED LAYOUT
Fire Protection And Fire Safety Systemshall be provided as per the fire drawing and national building code.
Social Infrastructure And Other Public Amenities Including Public Health Servicessocial infrastructure and other public amenities including public health services shall be provided as per the local building byelaws.
Emergency Evacuation Servicesshall be as per the environment management plan and disaster management plan all provisions are made including assembly point.
Other Miscellaneous WorkTO BE COMPLETED AS PER APPROVED LAYOUT

Bank Details

Bank NameHDFC BANK
BranchALPHA COMMERCIAL BELT
Branch AddressGREATER NOIDA, U.P.
Account HolderRLCPPL MIGSUN GALLERIA RERA ESCROW ACCOUNT
Account Number57500000608712
IFSC CodeHDFC0000278

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy