New Launch - India Real Estate Report 2026.

NORTHWIND SANCTUARY Plot No. 7, Sector-PI, Gr. Noida

NORTHWIND ESTATES PRIVATE LIMITED

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Apr 2025

Completion pending

Pending

29th Jan 2030

Registration No.

UPRERAPRJ798312/05/2025

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ798312/05/2025
Project StatusNew
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2025-04-01
Completion Date2030-01-29
Total Area (sqm)18141
Project Cost (Lacs)21078
Duration (Months)58
Registration Fee96000

Promoter Details

Promoter NameNORTHWIND ESTATES PRIVATE LIMITED
Promoter IDUPRERAPRM346081
Mobile99********

Project Team

rolename
ArchitectVishal Sharma - Confluence Consultancy Services
ContractorModern Civil Construction LLP
Structural EngineerVishnu Dutt Sharma - Optimum Design Private Limited

Land Details

typekhasra_or_plot_noarea_sqmt
Plot0718141.70

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
A24 BHK2181.71-
A34 BHK2181.71-
A44 BHK2181.71-
A54 BHK2181.71-
A64 BHK2181.71-
A74 BHK2181.71-
A84 BHK2181.71-
A94 BHK2181.71-
A104 BHK2181.71-
A114 BHK2181.71-
A124 BHK2181.71-
A134 BHK2181.71-
A144 BHK2181.71-
A154 BHK2181.71-
A164 BHK2181.71-
A17PENTHOUSE1309.44-
B13 BHK2100.87-
B24 BHK4119.53-
B34 BHK4119.53-
B44 BHK4119.53-
B54 BHK4119.53-
B64 BHK4119.53-
B74 BHK4119.53-
B84 BHK4119.53-
B94 BHK4119.53-
B104 BHK4119.53-
B114 BHK4119.53-
B124 BHK4119.53-
B134 BHK4119.53-
B144 BHK4119.53-
B154 BHK4119.53-
B164 BHK4119.53-
B174 BHK2119.53-
B173 BHK2100.87-
B184 BHK4119.53-
B194 BHK4119.53-
B20PENTHOUSE2201.71-
C12 BHK271.85-
C13 BHK288.95-
C23 BHK488.95-
C33 BHK488.95-
C43 BHK488.95-
C53 BHK488.95-
C63 BHK488.95-
C73 BHK488.95-
C83 BHK488.95-
C93 BHK488.95-
C103 BHK488.95-
C113 BHK488.95-
C123 BHK488.95-
C133 BHK488.95-
C143 BHK488.95-
C153 BHK488.95-
C163 BHK488.95-
C172 BHK271.85-
C173 BHK288.95-
C183 BHK488.95-
C193 BHK488.95-
C20PENTHOUSE2178.07-
CommercialGFSHOP14.350
CommercialGFSHOP111.220
CommercialGFSHOP122.780
CommercialGFSHOP222.790
CommercialGFSHOP110.630
CommercialGFSHOP14.280
CommercialGFSHOP14.700
CommercialGFSHOP24.390
A1OTHER00-

Development Works

work_namedescription
Demarcation of Plots124.77 Mtr. front, with 24 Mtr. Road 3 Side and one side Other property
Boundary Wall2.1 M from Drain top
Road WorkRCC Trimix Road with Kerbstone on sides, stone paving in front of Towers
FootpathsCement concrete, stone and Grass pavers
Water Supply Including Drinking Water FacilitiesBy Greater Noida Authority water supply system collected in underground water reservoirs Terrace Tanks filled with Hydro Pneumatic pumps with GI rings and risers.
Sewer SystemDWC hume pipe with manhole, chambers and collection chambers and connection with Authority sewer system.
DrainSaucer drain and RCC hume pipe system.
Parks8126 m2 area proposed for park with beautiful landscape with civil work with masonry and stone, horticulture work and various types of plantation and shurbs.
Tree Planting156 Tree proposed
Design For Electric Supply Including Street LightingDirect supply of electricity shall be through NPCL and the electricity load and distribution design shall be as per the electrical drawing.
Community BuildingsProposed ground floor of Tower A and B with Banquet, Gym, Indoor Games facilities and swimming pool.
Treatment and Disposal System of Sewage and Sullage waterSTP and through Authority sewage system
Solid Waste Management And Disposal SystemOrganic waste convertor, collection Bins and Segregation table.
Water Conservation SystemRain water Harvesting Pits and dual plumbing systems, Drip irrigation with sprinklers.
Energy Management System Including Use of Renewable EnergySolar water heating system, solar energy light in common areas, stair cases (LED 6-18 watts), street lighting, Pole mounted light of 60 Watts for proper lumen, Fire water supply, V.F.D motors.
Fire Protection And Fire Safety SystemThe project comes under A4 category ( Residential apartments) as per NBC of india, accordingly the project has been designed with 340 KL of fire tank, Sprinkler system, Hydrant system, hand held fire extinguishers. Manual and automatic fire alarm system has been proposed as per the requirement of NBC
Social Infrastructure And Other Public Amenities Including Public Health ServicesProper water supply and sanitary facilities on the ground floor of every tower.
Emergency Evacuation ServicesRefugee area proposed 60m height
Other Miscellaneous WorkGuard room, entrance and exit gates, maintenance room, commercial facilities, CCTV, Video conferencing, calling facility and security Guards for proper watch and ward.

Bank Details

Bank NameINDUSIND BANK LIMITED
BranchSECTOR - OMEGA BRANCH GREATER NOIDA
Branch AddressGROUND FLOOR SHOP NO. 2 SECTOR OMEGA O1/P2 GREATER NOIDA
Account HolderNWEPL COLL AC FOR NORTHWIND SANCTUARY PLOT NO 7 SEC PI GR NOIDA
Account Number258881110909
IFSC CodeINDB0000513

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy