OPULENCE PHASE A
SAHA ESTATE DEVELOPERS PRIVATE LIMITED
Gautam Buddha Nagar, Uttar Pradesh
Approved
1st Apr 2019
Completed
29th Oct 2023
Registration No.
UPRERAPRJ483588
Project Type
Residential
District
Gautam Buddha Nagar
Taluka
Gautam Buddha Nagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ483588 |
| Project Status | Completed |
| Project Category | Residential |
| District | Gautam Buddha Nagar |
| Taluka | Gautam Buddha Nagar |
| Start Date | 2019-04-01 |
| Completion Date | 2023-10-29 |
| Total Area (sqm) | 12510 |
| Project Cost (Lacs) | 18100 |
| Duration (Months) | 55 |
| Registration Fee | 68000 |
Promoter Details
| Promoter Name | SAHA ESTATE DEVELOPERS PRIVATE LIMITED |
| Promoter ID | UPRERAPRM70110 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | SMITA JAIN |
| Contractor | In House |
| Structural Engineer | SUBRATA SAHA |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | SC-02/A8 SECTOR 150, NOIDA | 50560 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| TOWER 8 | 1 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 2 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 3 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 4 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 5 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 6 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 7 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 8 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 9 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 10 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 11 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 12 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 13 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 14 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 15 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 16 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 17 | 4 BHK | 4 | 169.500 | - |
| TOWER 8 | 18 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 1 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 2 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 3 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 4 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 5 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 6 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 7 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 8 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 9 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 10 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 11 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 12 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 13 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 14 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 15 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 16 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 17 | 4 BHK | 4 | 169.500 | - |
| TOWER 9 | 18 | 4 BHK | 4 | 169.500 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | By fixing co-ordinate point with all dimensions and tangents as per given approved drawings. |
| Boundary Wall | Brick work wall upto 1.2 mt. high with M.S grill above . |
| Road Work | R.C.C Road Finishing (trimix) 6.0 m wide has been Provided. |
| Footpaths | 1.5 m wide path with interlocking tiles finishing has been Provided. |
| Water Supply Including Drinking Water Facilities | government supply line facilities .From U.G. Tanks treated water to Over Head Tank and from Over Head Tank to individual flats services. |
| Sewer System | S.T.P System , collection of all sewerage though sewer lines to the S.T.P and treated on different stages, then treated water used for flushing, plantation, and car washing etc. |
| Drain | All rain water collected through collected drains into the disliting chamber and then rain water harvesting fit to maintain water level in the premises. |
| Parks | There are mounds , kids play area, bad-Minton court, sitting benches etc. |
| Tree Planting | Tree planting along with the boundary and parks area. |
| Design For Electric Supply Including Street Lighting | From UPPCL to Meter Room and line connected to HT Panel Room then Divided in LT Panel for all towers area . |
| Community Buildings | shall be provided in this area which includes gym area, community area, Swimming area etc. |
| Treatment and Disposal System of Sewage and Sullage water | Through S.T.P System and then treated the water in different stages. |
| Solid Waste Management And Disposal System | Disposal as per norms Premises. |
| Water Conservation System | Rain water Harvesting Provided as per requirement. |
| Energy Management System Including Use of Renewable Energy | Solar panels shall be provided . |
| Fire Protection And Fire Safety System | All Fire equipment using in all towers and all basements. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | All safety norms and related equipment will be provided |
| Other Miscellaneous Work | AS PER PLAN |
Bank Details
| Bank Name | Kokat Mahindra Bank |
| Branch | Kotak Mahindra Bank |
| Branch Address | Plot No. 31 & 32, Block – G, Sector 18, Noida – 201301(U. P.) |
| Account Holder | Saha Estate Developers Private Limited |
| Account Number | 0512339698 |
| IFSC Code | KKBK0000181 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





