New Launch - India Real Estate Report 2026.

OPULENCE PHASE-I

SAHA ESTATE DEVELOPERS PRIVATE LIMITED

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Dec 2021

Completion pending

Pending

5th Mar 2027

Registration No.

UPRERAPRJ376920

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Dadri

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ376920
Project StatusNew
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaDadri
Start Date2021-12-01
Completion Date2027-03-05
Total Area (sqm)15316
Project Cost (Lacs)55339
Duration (Months)64
Registration Fee82000

Promoter Details

Promoter NameSAHA ESTATE DEVELOPERS PRIVATE LIMITED
Promoter IDUPRERAPRM70110
Mobile96********

Project Team

rolename
ArchitectVibhor Mukul Singh
ContractorSaha Estates Development Pvt Ltd
Structural EngineerKamal Sabharwal

Land Details

typekhasra_or_plot_noarea_sqmt
KhasraSC-02/A8, Sector 150, Noida15316

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
CommercialGFSHOP241.3380
CommercialGFSHOP140.6390
CommercialGFSHOP114.1860
Tower 1BSMNTOTHER00-
Tower 1GFOTHER000
Tower 113 BHK4106.374-
Tower 123 BHK4106.374-
Tower 133 BHK4106.374-
Tower 143 BHK4106374-
Tower 153 BHK4106.374-
Tower 163 BHK4106.374-
Tower 173 BHK4106.374-
Tower 183 BHK4106.374-
Tower 193 BHK4106.374-
Tower 1103 BHK4106.374-
Tower 1113 BHK4106.374-
Tower 1123 BHK4106.374-
Tower 1133 BHK4106.374-
Tower 1143 BHK4106.374-
Tower 1153 BHK4106.374-
Tower 1163 BHK4106.374-
Tower 1173 BHK4106.374-
Tower 1183 BHK4106.374-
Tower 2BSMNTOTHER00-
Tower 2GFOTHER000
Tower 213 BHK4106.374-
Tower 223 BHK4106.374-
Tower 233 BHK4106.374-
Tower 243 BHK4106.374-
Tower 253 BHK4106.374-
Tower 263 BHK4106.374-
Tower 273 BHK4106.374-
Tower 283 BHK4106.374-
Tower 293 BHK4106.374-
Tower 2103 BHK4106.374-
Tower 2113 BHK4106.374-
Tower 2123 BHK4106.374-
Tower 2133 BHK4106.374-
Tower 2143 BHK4106.374-
Tower 2153 BHK4106.374-
Tower 2163 BHK4106.374-
Tower 2173 BHK4106.374-
Tower 2183 BHK4106.374-
Tower 3BSMNTOTHER00-
Tower 3GFOTHER000
Tower 323 BHK4106.374-
Tower 333 BHK4106.374-
Tower 343 BHK4106.374-
Tower 353 BHK4106.374-
Tower 363 BHK4106.374-
Tower 373 BHK4106.374-
Tower 383 BHK4106.374-
Tower 393 BHK4106.374-
Tower 3103 BHK4106.374-
Tower 3113 BHK4106.374-
Tower 3123 BHK4106.374-
Tower 3133 BHK4106.374-
Tower 3143 BHK4106.374-
Tower 3153 BHK4106.374-
Tower 3163 BHK4106.374-
Tower 3173 BHK4106.374-
Tower 3183 BHK4106.374-
Tower 313 BHK4106.374-

Development Works

work_namedescription
Demarcation of PlotsThe plot will be demarcated as per the sanction and survey drawing. A details Survey of all the coordinates will be done and the exact dimensions will be marked at he site. The demarcation will be as per the lease deed of the project.
Boundary Wall1.5 m high boundary wall along front road with Elegant Design integrated with security rails as per design constructed in RCC Brick Work.
Road WorkAccess roads to all towers will be provided as per design. They will be designed to take up the live load and as per NBC. The roads will be a mix of concrete pavers and stone so that the design is achieved. The roads will take care of all vehicular traffic and will provide access to each and every tower.
FootpathsNetwork of footpaths connects the various part of the Landscape, Towers and Gardens as per landscape design. These footpaths will be made stone, concrete of titles.
Water Supply Including Drinking Water FacilitiesNoida authority shall supply water to entire society that shall further be supplied to dwelling units after filteration from centralised plant. The water will be first supplied to underground storage tanks and then pumped to overhead tanks for uninterrupted water supply.
Sewer SystemAll the sever will be transferred thru the networks of pipes through the shafts and will flow on the STP. Centralised STP is proposed to treat sewage and recycled water will be recirculated for horticulture and flushing.
DrainRain water drains as per design and requirements. The Drains will collect the surface runoff as well as from the terraces and the collected rail water will run thru a proper network of channels. these channels will lead to the rainwater harvesting pits provided. The overflow of the rainwater pits will also be connected to each other as well.
ParksBeautiful parks as per design will be made for residents to enjoy and relax. Various features as flower beds gardens, trees, light bollards, sit out area will be provided in the parks. Various facility for toddlers and kids and relaxing areas for elders will be provided.
Tree PlantingNumbers of trees as per building plan and design. The trees will be a mix of shady, ornamental, flowing, evergreen and seasonal trees. They will provide necessary greenery, shade.
Design For Electric Supply Including Street LightingIndividuals units will get their electricity supply directly from discom and all infrastructure like Lt panels and sub distribution network will be provided by developer. This may subject to change as per pervailling bylaws discom.
Community BuildingsWill be made as per approved building plan with all modern facilities. Multipurpose hall, Games Gymnasium, charging rooms etc, will be provided.
Treatment and Disposal System of Sewage and Sullage waterSTP will be provide as per design to treat the sewage. The STP will be based on SBR/MBBR technology and will be able to treat all the sewage generated. The treated will be used for flushing of the toilets and for the landscaping irrigation works. Additional treated water, if there will be used for the irrigation of the green belt.
Solid Waste Management And Disposal SystemCollection storage and disposal as per NBC and UPPCB. The solid waste will be collected from door to door and will be segregated at the source itself. It will be mandatory to fully segregated their solid waste before handing it over to the collection team, Separate blue and green dustbins will be provided at the common areas for disposal of SW. the recycle waste will be given to authorised recyclers and proper documentation will be done for the same.
Water Conservation SystemRain Water harvesting will be provide as per design and dual flushing system will also be provided. Water conservation practices will be followed throughout the project with residents being advised o practice minimum water wastage and adopt all water conservation practice.
Energy Management System Including Use of Renewable EnergyUsage of LED lights will be done for common areas of the project. The use of the common lighting will be optimized by using automatic timer system. Also other systems of energy optimization will be used such as all common area lighting including the street lights, facade lights corridor and all lights in landscape areas will be LED lights.
Fire Protection And Fire Safety SystemFire protection system as per the approvals and norms. Use of fire sprinkler system, smoke detectors and fire system as per NBC. Fire staircases, fire escape routes, fire drills for the residents, fire related awareness programmes. Fire safety being the utmost important matter during construction and after the handover of the project.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSocial gathering in the club and park are being desired. Amphitheater, park areas, tot lots and other gathering places in the landscaped areas. Club or community building will have maximum social and recreational places.
Emergency Evacuation ServicesAs per approved building plan and fire approvals, fire staircases as per the norms and approvals. Proper fire exit markings will be provided at all and strategic locations to guide the exit during emergency.
Other Miscellaneous WorkBeautification of the whole complex and the work to make the project into a state of the art residential project . all the works will be done as per approved building plans and norms. project is planned on theme based architecture theme and will be stand out as a land mark project.

Bank Details

Bank NameKotak Mahindra Bank
BranchConnaught Place
Branch AddressNew Delhi, Connaught Place
Account HolderSAHA- Collection Account for Opulene Phase-I
Account Number0545968704
IFSC CodeKKBK0000172

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy