New Launch - India Real Estate Report 2026.

RG Mirage Tower M

RG Residency Private Limited

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Jul 2022

Project completed

Completed

30th Jun 2026

Registration No.

UPRERAPRJ158423

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ158423
Project StatusCompleted
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2022-07-01
Completion Date2026-06-30
Total Area (sqm)5029
Project Cost (Lacs)16192
Duration (Months)48
Registration Fee30500

Promoter Details

Promoter NameRG Residency Private Limited
Promoter IDUPRERAPRM154195
Mobile95********

Project Team

rolename
ArchitectVishal Sharma -Confluence
ContractorJai Prakash- Saurabh Mason Private Limited
Structural EngineerV.D. Sharma

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-02, Sector 120, Noida, Distt. Gautam Buddha Nagar, Uttar Pradesh51067

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER-MGF3 BHK3113.140
TOWER-M13 BHK4113.14-
TOWER-M14 BHK1151.32-
TOWER-M14 BHK1150.61-
TOWER-M23 BHK1116.80-
TOWER-M23 BHK4113.14-
TOWER-M24 BHK1151.32-
TOWER-M24 BHK1150.61-
TOWER-M33 BHK1116.80-
TOWER-M33 BHK4113.14-
TOWER-M34 BHK1151.32-
TOWER-M34 BHK1150.61-
TOWER-M43 BHK1116.80-
TOWER-M43 BHK4113.14-
TOWER-M44 BHK1151.32-
TOWER-M44 BHK1150.61-
TOWER-M53 BHK1116.80-
TOWER-M53 BHK4113.14-
TOWER-M54 BHK1151.32-
TOWER-M54 BHK1150.61-
TOWER-M63 BHK1116.80-
TOWER-M63 BHK4113.14-
TOWER-M64 BHK1151.32-
TOWER-M64 BHK1150.61-
TOWER-M73 BHK1116.80-
TOWER-M73 BHK4113.14-
TOWER-M74 BHK1151.32-
TOWER-M74 BHK1150.61-
TOWER-M83 BHK1116.80-
TOWER-M83 BHK4113.14-
TOWER-M84 BHK1151.32-
TOWER-M84 BHK1150.61-
TOWER-M93 BHK1116.80-
TOWER-M93 BHK4113.14-
TOWER-M94 BHK1151.32-
TOWER-M94 BHK1150.61-
TOWER-M103 BHK1116.80-
TOWER-M103 BHK4113.14-
TOWER-M104 BHK1151.32-
TOWER-M104 BHK1150.61-
TOWER-M113 BHK1116.80-
TOWER-M113 BHK4113.14-
TOWER-M114 BHK1151.32-
TOWER-M114 BHK1150.61-
TOWER-M123 BHK1116.80-
TOWER-M123 BHK4113.14-
TOWER-M124 BHK1151.32-
TOWER-M124 BHK1150.61-
TOWER-M133 BHK1116.80-
TOWER-M133 BHK4113.14-
TOWER-M134 BHK1151.32-
TOWER-M134 BHK1150.61-
TOWER-M143 BHK1116.80-
TOWER-M143 BHK4113.14-
TOWER-M144 BHK1151.32-
TOWER-M144 BHK1150.61-
TOWER-M153 BHK1116.80-
TOWER-M153 BHK4113.14-
TOWER-M154 BHK1151.32-
TOWER-M154 BHK1150.61-
TOWER-M163 BHK1116.80-
TOWER-M163 BHK4113.14-
TOWER-M164 BHK1151.32-
TOWER-M164 BHK1150.61-
TOWER-M173 BHK1116.80-
TOWER-M173 BHK4113.14-
TOWER-M174 BHK1151.32-
TOWER-M174 BHK1150.61-
TOWER-M183 BHK1116.80-
TOWER-M183 BHK4113.14-
TOWER-M184 BHK1151.32-
TOWER-M184 BHK1150.61-
TOWER-M193 BHK1116.80-
TOWER-M193 BHK4113.14-
TOWER-M194 BHK1151.32-
TOWER-M194 BHK1150.61-
TOWER-M203 BHK1116.80-
TOWER-M203 BHK4113.14-
TOWER-M204 BHK1151.32-
TOWER-M204 BHK1150.61-
TOWER-M213 BHK1116.80-
TOWER-M213 BHK4113.14-
TOWER-M214 BHK1151.32-
TOWER-M214 BHK1150.61-
TOWER-M223 BHK1116.80-
TOWER-M223 BHK4113.14-
TOWER-M224 BHK1151.32-
TOWER-M224 BHK1150.61-
TOWER-M233 BHK1116.80-
TOWER-M233 BHK4113.14-
TOWER-M234 BHK1151.32-
TOWER-M234 BHK1150.61-
TOWER-M243 BHK1116.80-
TOWER-M243 BHK4113.14-
TOWER-M244 BHK1151.32-
TOWER-M244 BHK1150.61-
TOWER-M253 BHK1116.80-
TOWER-M253 BHK4113.14-
TOWER-M254 BHK1151.32-
TOWER-M254 BHK1150.61-
TOWER-M263 BHK1116.80-
TOWER-M263 BHK2113.14-
TOWER-M264 BHK1151.32-
TOWER-M264 BHK1150.61-
TOWER-M27OTHER0254.11-
TOWER-M28OTHER0122.19-

Development Works

work_namedescription
Demarcation of PlotsPlot No. GH-02,Sector 120, NOIDA demarcation had been done by NOIDA Development Authority.
Boundary WallYes, Masonry Pucca and Railing Boundary Wall.
Road WorkYes, RCC Trimix Road with Kerb Stone on Sides and Stone Paving front of Towers.
FootpathsYes, Footpath will be constructed using Interlocking / Paver as per Sanctioned Plans.
Water Supply Including Drinking Water FacilitiesYes, Water supply from Authority further water to be collected in Under Ground Water Reservoirs and Terrace Tanks, equipped with hydro Pneumatic Pumps with GI rings and rises.
Sewer SystemProper Sewerage system will be constructed using R.C.C./ UPVC pipes as per drawings and will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
DrainDraining System will be constructed using R.C.C. / UPVC pipes as per drawings.
ParksYes, Beautiful Landscape with Civil Work with Masonry and Stone, Horticulture Work and various types of Plantation.
Tree PlantingSufficient No of trees as per Sanctioned layout ( approx. 4527 sq.mt Landscaped area) will be planted in the project. Beautiful landscape with civil work with masonry and stone, horticulture work and various type of plantation , shrubs . trees are to be planted out of that 50% will be evergreen tree.
Design For Electric Supply Including Street LightingHT electrical supply will be made by competent authority, a sub station will be set-up in project as per drawing and LT electrical supply will be available for individual unit(s). Sufficient power back-up arrangement will be made using DG sets. Street Lighting will be done using LT supply ./ power backup.
Community BuildingsYes, with Banquet, Gym, Indoor Games facilities at 27th 28th Floor lvl.
Treatment and Disposal System of Sewage and Sullage waterSewerage Treatment Plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be available for gardening and flushing and residual of sewerage treatment plant will be drained in government sewer system.
Solid Waste Management And Disposal SystemYes, Solid waste will collected manually and disposal will be done as per norms.
Water Conservation SystemWater Conservation will be done by rain water harvesting system through Sewerage Treatment Plant (STP).
Energy Management System Including Use of Renewable EnergyGood quality and approved brand equipment will be used in sub station to minimize energy loss and Solar Energy System will be installed as per norms and approved drawings.
Fire Protection And Fire Safety SystemDiesel Pump 1 No 2850 lpm and 150 lpm head, Electrical Pump fi=or hydrant - 1 No 2850 lpm and 150 m head, Electrical Pump for Sprinkler - 1no. 2850 lpm and 150 m head, Jockey Pumps - 2no.s 180 lpm and 150 m head, Basement internal and external hydrants sprinklers. Fire tender path shall be provided as per NBC. Fire fighting systems along with pumps and UGT of Fire Tank capacity(200) KL (common) and OHT of Fire tank capacity 10KL (each block) shall be provided as per NBC & NOC from fire Dept.
Social Infrastructure And Other Public Amenities Including Public Health ServicesProper Water Supply and Sanitary facilities on Ground Floor of Every Tower.
Emergency Evacuation ServicesYes, Refuge area provided at Every Towers on 18th ,21st 24th Floor in addition to Main and Fire Staircase. Staircase shall be provided in Basement & all the Towers for fire / emergency exit as per NBC.
Other Miscellaneous WorkProper Security system including security guard ,CCTV cameras and controlled access will be made available.

Bank Details

Bank NameHDFC Bank
BranchSector 110, NOIDA
Branch AddressPlot No. 1, Block A-2, Commercial Complex, Sector-110, NOIDA, Distt. Gautam Buddha Nagar, Uttar Pradesh, PIN-201304
Account HolderRG REGIDENCY PVT. LTD COLLECTION ACCOUNT FOR RG MIRAGE TOWER M
Account Number59200000008090
IFSC CodeHDFC0000930

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy