New Launch - India Real Estate Report 2026.

RPS09/2025

Yamuna Expressway Industrial devlopment Authority

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Jul 2025

Completion pending

Pending

30th Jun 2030

Registration No.

UPRERAPRJ103634/04/2025

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ103634/04/2025
Project StatusNew
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2025-07-01
Completion Date2030-06-30
Total Area (sqm)105870
Project Cost (Lacs)14514
Duration (Months)60
Registration Fee534500

Promoter Details

Promoter NameYamuna Expressway Industrial devlopment Authority
Promoter IDUPRERAPRM14529
Mobile78********

Project Team

rolename
ArchitectDEEPAK CHAUDHARY
ContractorYAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Structural EngineerSHYAM SUNDER

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra297,298,299,300,301,302,303,304,305,306,307,308,309,313,314,315,316,336,337,346,348,349,350,351,352,353,355105869.55

Development Works

work_namedescription
Demarcation of PlotsFor Demarcation of Plots Total Nos. of RCC Tee Post -1104 Nos. Total RCC Demarcation Board-60 Nos.
Boundary WallNot applicabler
Road Work12 Mtr wide Road- Length- 2200 Mtr Width-5.5 mtr (carriageway) Thickness of carriageway-layer wise details as follows (a)1st layer (90mm-45mm stone blast)-10cm (b) 2nd layer (63 mm-45mm stone blast)-7.5cm (c) 3rd layer (53mm-22.4mm stone blast) 7.5cm (d) Top Bituminus layer- mixed seal surface-2.5cm Total thickness-27.5cm 18 mtre Road- Lenght 414 mtr Width-7.00mtr (Carriageway) Thickness of carriageway-Layer wise details as following- (a) 1st layer (63mm-45mm stone blast) 10cm (b) 2nd layer (63mm-45mm stone blast) 7.5cm (c) 3rd layer (63mm-45mm stone blast) 7.5cm (d)4rth layer (53mm-22.5mm stone blast) 7.5cm (e) Top Bituminus layer -Mix seal surface -2.5cm Total Thickness-35cm 24 mtr wide road Length-488 mtr Width-7.00mter (carriageway) Thickness of carriageway-Layer wise details as follows (a)1st layer (90mm-45mm stone blast) 10cm (b) 2nd layer (63mm-45mm stone blast) 7.5cm (c)3rd layer )63mm-45mm stone blast) 7.5mm (d) 4rth layer (53mm-22.5mm stone blast) 7.5 cm (e)Top Bituminus layer -Mix seal surface -2.5cm Total thickness-35cm (d)
FootpathsNot applicable
Water Supply Including Drinking Water FacilitiesWater Supply Line- (a) 550mtr length in 250mm dia pipe DI (Rising main) (b) 1200 mtr in 160mm dia PVC Pipe (c) 1700 mtr length in 110mm dia PVC Pipe
Sewer SystemSewer Line- (a) 2515 mtr length in NP-2, 250mm dia (Hume Pipe) (b) 348 mter length in NP-3 , 350mm dia (Hume pipe) (c) 552 mtr length in NP-3 150mm dia (Hume Pipe) Sewer Main Hole Details- (a) MH-900mm dia -108 nos (b) MH- 1200mm Dia -15 Nos. (c) MH-1500mm dia -15 nos. (d) Chamber- 276 Nos.
DrainRCC Drain (a) 600 mter length- 1200mm wide 1800mm debth (b) 1000 mtr- 900mmwide 1500mm debth (c) 1100 mter length-600mm wide 1000mm debth (d)3504 mtr lenght-450mm wide 650mm debth
ParksTotal area of grassing in park -13000 sqm Total nos. of tree planting in parks-500 nos. Total nos. of shrubs planting in park-1000 nos.
Tree Planting1164 Nos. Tree planting on road side
Design For Electric Supply Including Street Lighting2 Nos. of 11/0.415 KV Sub Station 4 Nos. 360 KVA transformer 100 Nos. Street Light Fitting Poles 70 Nos. Main Feeder Pillars Sub Feeder Pillars 14000 mtr LT HT Cable
Community BuildingsNot applicable
Treatment and Disposal System of Sewage and Sullage waterSewer line will be laid under this project which will be connected to the main line which connect to the STP location at Sector 24A
Solid Waste Management And Disposal SystemNot Applicable
Water Conservation SystemAfter handover plots to the allottee, water harvesting system will be construct by individual allottee of all plots as per YEIDA building Bye laws
Energy Management System Including Use of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameICICI BANK
BranchOMEGA-1, GREATER NOIDA
Branch AddressSHOP NO-1, OMEGA-1, P2 SHOPPING COMPLEX, GREATER NOIDA
Account HolderYEIDA COLLECTION BANK ACCOUNT RPS09/2025
Account Number218301001879
IFSC CodeICIC0002183

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy