New Launch - India Real Estate Report 2026.

SOLITAIRIAN CITY - (PARY) PHASE-3

PARY DEVELOPERS PRIVATE LIMITED

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Jan 2017

Completion pending

Pending

30th Jun 2028

Registration No.

UPRERAPRJ6887

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ6887
Project StatusOngoing
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2017-01-01
Completion Date2028-06-30
Total Area (sqm)7449
Project Cost (Lacs)12618.94
Duration (Months)138
Registration Fee42500

Promoter Details

Promoter NamePARY DEVELOPERS PRIVATE LIMITED
Promoter IDUPRERAPRM7796
Mobile85********

Project Team

rolename
ArchitectVISHAL SHARMA
Structural EngineerVINTECH CONSULTANT

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-B-121622.60
PlotGH-B-245389

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
S1BSMNTOTHER00-
S1BSMNT2OTHER00-
S1BSMNT3OTHER00-
S1GF4 BHK1314.920
S114 BHK1314.92-
S112 BHK2148.31-
S124 BHK1314.92-
S123 BHK2170.53-
S134 BHK1314.92-
S133 BHK2170.53-
S144 BHK1314.92-
S143 BHK2170.53-
S154 BHK1314.92-
S153 BHK2170.53-
S164 BHK1314.92-
S163 BHK2170.53-
S174 BHK1314.92-
S173 BHK2170.53-
S184 BHK1314.92-
S183 BHK2170.53-
S194 BHK1314.92-
S193 BHK2170.53-
S1104 BHK1314.92-
S1103 BHK2170.53-
S1114 BHK1314.92-
S1113 BHK2170.53-
S1124 BHK1314.92-
S1123 BHK2170.53-
S1134 BHK1314.92-
S1133 BHK2170.53-
S1144 BHK1314.92-
S1143 BHK2170.53-
S1154 BHK1314.92-
S1153 BHK2170.53-
S1164 BHK1314.92-
S1163 BHK2170.53-
S1174 BHK1314.92-
S1173 BHK2170.53-
S1184 BHK1314.92-
S1183 BHK2170.53-
S1194 BHK1314.92-
S1193 BHK2170.53-
S1204 BHK1314.92-
S1203 BHK2170.53-
S1214 BHK1314.92-
S1213 BHK2170.53-
S1224 BHK1314.92-
S1223 BHK2170.53-
S1234 BHK1314.92-
S1233 BHK2170.53-
S1244 BHK1314.92-
S1243 BHK2170.53-
S1254 BHK1314.92-
S1253 BHK2170.53-
S1264 BHK1314.92-
S1263 BHK2170.53-
S5BSMNTOTHER00-
S5BSMNT2OTHER00-
S5BSMNT3OTHER00-
S5GF2 BHK266.470
S5GF2 BHK274.570
S512 BHK566.47-
S512 BHK474.57-
S522 BHK474.57-
S532 BHK474.57-
S542 BHK666.47-
S542 BHK474.57-
S552 BHK666.47-
S552 BHK474.57-
S562 BHK666.47-
S562 BHK474.57-
S572 BHK666.47-
S572 BHK474.57-
S582 BHK666.47-
S582 BHK474.57-
S592 BHK666.47-
S592 BHK474.57-
S5102 BHK666.47-
S5102 BHK474.57-
S5112 BHK666.47-
S5112 BHK474.57-
S5122 BHK666.47-
S5122 BHK474.57-
S5132 BHK666.47-
S5132 BHK474.57-
S5142 BHK666.47-
S5142 BHK474.57-
S5152 BHK666.47-
S5152 BHK474.57-
S5162 BHK666.47-
S5162 BHK474.57-
S522 BHK666.47-
S532 BHK666.47-
S5172 BHK666.47-
S5172 BHK474.57-
S5182 BHK666.47-
S5182 BHK474.57-
S5192 BHK666.47-
S5192 BHK474.57-
S5202 BHK666.47-
S5202 BHK474.57-
S5212 BHK666.47-
S5212 BHK474.57-
S5222 BHK666.47-
S5222 BHK474.57-
S5232 BHK666.47-
S5232 BHK474.57-
S5242 BHK666.47-
S5242 BHK474.57-
S5252 BHK666.47-
S5252 BHK474.57-
S5262 BHK666.47-
S5262 BHK474.57-
S5272 BHK666.47-
S5272 BHK474.57-
S5292 BHK166.47-
S5292 BHK174.57-
S528OTHER1966.18-
S529OTHER1311.78-

Development Works

work_namedescription
Demarcation of PlotsGreen Belts plus 40 Meter Double road at front Plot & Right hand side 32 meter road and 32 meter back side road.
Boundary Wall2.1 Meter Height Boundary wall on total plot area
Road Work6 meter Front 22 Meter Wide roads plus 30 Meter wide internal road.
Footpaths4 feet wide foot path surrounding the green area.
Water Supply Including Drinking Water Facilities3 under ground reservoir.
Sewer SystemExternal Sewerage System with STP.
DrainExternal & Internal Drain with Rain Water Harvesting.
ParksTotal Landscape area including Roads is 50258 Sq. Meter.
Tree PlantingThere is Total 544 Trees including Evergreen tree 304.
Design For Electric Supply Including Street Lighting2 way poles around the Entire inside circular roads.
Community BuildingsDouble Story Club House of 22000 Sqft Area.
Treatment and Disposal System of Sewage and Sullage waterSTP & Provision of Effulant Water for the Greens.
Solid Waste Management And Disposal Systemit`s plan as per environmental Norms.
Water Conservation SystemRain Water Harvesting 8 nos. 4.25 m Dia X 4.5 m Depth.
Energy Management System Including Use of Renewable EnergyAs per the Minister of Renewal of Energy.
Fire Protection And Fire Safety SystemSprinklers and Alarm Systems are proposed for all Units.
Social Infrastructure And Other Public Amenities Including Public Health ServicesMain Club and Roof top Club
Emergency Evacuation ServicesAs per the Norms and Fire NOC already Received.
Other Miscellaneous WorkSwimming Pool, Tennis club, Badminton Court ETC.

Bank Details

Bank NameICICI Bank Ltd.
BranchShakti Khand-2, Indirapuram, Ghaziabad
Branch AddressA-1, Plot No.-1, Krishna Apra, D Mall, Shakti Khand-2, Indirapuram, Ghaziabad, Uttar Pradesh, PIN-201014
Account HolderPary Developers Pvt. Ltd. Collection Account for Solitairian City (Pary) Phase-3
Account Number165405001349
IFSC CodeICIC0001654

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy