New Launch - India Real Estate Report 2026.

STELLAR ONE PHASE III

Stellar Spring Projects Private Limited

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st Jun 2025

Completion pending

Pending

26th Oct 2028

Registration No.

UPRERAPRJ564504/08/2024

Project Type

Residential

District

Gautam Buddha Nagar

Taluka

Dadri

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ564504/08/2024
Project StatusNew
Project CategoryResidential
DistrictGautam Buddha Nagar
TalukaDadri
Start Date2025-06-01
Completion Date2028-10-26
Total Area (sqm)11201
Project Cost (Lacs)30500
Duration (Months)41
Registration Fee61500

Promoter Details

Promoter NameStellar Spring Projects Private Limited
Promoter IDUPRERAPRM8082
Mobile81********

Project Team

rolename
ArchitectSAMEER BALGOTRA
ContractorKEYSTONE DEVELOPERS PVT. LTD.
Structural EngineerSANJEEV SHARMA OF MELIOR STRUCTURAL SOLUTIONS PVT. LTD.

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-09, Sector-111200.518

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
AGF2 BHK470.180
AGF3 BHK4108.070
A12 BHK470.18-
A13 BHK4108.07-
A23 BHK495.61-
A23 BHK4108.07-
A33 BHK495.61-
A33 BHK4108.07-
A43 BHK495.61-
A43 BHK4108.07-
A53 BHK495.61-
A53 BHK4108.07-
A63 BHK495.61-
A63 BHK4108.07-
A73 BHK495.61-
A73 BHK4108.07-
A83 BHK495.61-
A83 BHK4108.07-
A93 BHK495.61-
A93 BHK4108.07-
A103 BHK495.61-
A103 BHK4108.07-
A113 BHK495.61-
A113 BHK4108.07-
A123 BHK495.61-
A123 BHK4108.07-
A133 BHK495.61-
A133 BHK4108.07-
A143 BHK495.61-
A143 BHK4108.07-
A153 BHK495.61-
A153 BHK4108.07-
A163 BHK495.61-
A163 BHK4108.07-
A173 BHK495.61-
A173 BHK4108.07-
A183 BHK495.61-
A183 BHK4108.07-
BGF2 BHK470.180
BGF3 BHK4108.070
B12 BHK470.18-
B13 BHK4108.07-
B23 BHK495.61-
B23 BHK4108.07-
B33 BHK495.61-
B33 BHK4108.07-
B43 BHK495.61-
B43 BHK4108.07-
B53 BHK4108.07-
B53 BHK495.61-
B63 BHK495.61-
B63 BHK4108.07-
B73 BHK495.61-
B73 BHK4108.07-
B83 BHK495.61-
B83 BHK4108.07-
B93 BHK495.61-
B93 BHK4108.07-
B103 BHK495.61-
B103 BHK4108.07-
B113 BHK495.61-
B113 BHK4108.07-
B123 BHK495.61-
B123 BHK4108.07-
B133 BHK495.61-
B133 BHK4108.07-
B143 BHK495.61-
B143 BHK4108.07-
B153 BHK495.61-
B153 BHK4108.07-
B163 BHK495.61-
B163 BHK4108.07-
B173 BHK495.61-
B173 BHK4108.07-
B183 BHK495.61-
B183 BHK4108.07-
CGF2 BHK470.180
CGF3 BHK4108.070
C12 BHK470.18-
C13 BHK4108.07-
C23 BHK495.61-
C23 BHK4108.07-
C33 BHK495.61-
C33 BHK4108.07-
C43 BHK495.61-
C43 BHK4108.07-
C53 BHK495.61-
C53 BHK4108.07-
C63 BHK495.61-
C63 BHK4108.07-
C73 BHK495.61-
C73 BHK4108.07-
C83 BHK495.61-
C83 BHK4108.07-
C93 BHK495.61-
C93 BHK4108.07-
C103 BHK495.61-
C103 BHK4108.07-
C113 BHK495.61-
C113 BHK4108.07-
C123 BHK495.61-
C123 BHK4108.07-
C133 BHK495.61-
C133 BHK4108.07-
C143 BHK495.61-
C143 BHK4108.07-
C153 BHK495.61-
C153 BHK4108.07-
C163 BHK495.61-
C163 BHK4108.07-
C173 BHK495.61-
C173 BHK4108.07-
C183 BHK495.61-
C183 BHK4108.07-

Development Works

work_namedescription
Demarcation of PlotsNorth East side - 24m wide road, South West side - Stellar One Phase II, South East side - Stellar One Phase 1, North West side - 60m wide road, Temporary barricading between each phase boundary. Plot area of Stellar One Phase III is 11200..518 sq. m. and is part of the Total Plot Area 64,803 sq. m. at GH - 09, Sector-1, Greater Noida (West) U.P. allotted by Greater Noida Authority. The Demarcation of total plot area and Stellar One Phase III plot is attached with layout plan.
Boundary Wall2100 mm high boundary wall with a combination of RCC (1000 mm) and MS grill (1100 MM). Temporary barricading between each phase boundary.
Road WorkAll internal road work in concrete paver blocks/VDF.
FootpathsFootpath/Pathway provided as per landscape details.
Water Supply Including Drinking Water FacilitiesGNIDA Water supply shall be collected in the underground tank of adequate capacity for whole project site already built in Stellar One Phase 1 as per NBCC 2016. Overhead domestic tank for each tower shall be filled with pumps to give supply to the units /flats. Watter treatment plant is provided.
Sewer SystemPVC pipe of adequate size with manhole, chambers shall be provided. The sewer lines shall be laid in desired slopes as per available invert level.
DrainPVC pipe /R.C.C. Saucer drain with manhole, chambers with rain water harvesting shall be provided. The number of catch basin shall be provided as per design requirement based on run off.
ParksLandscape with civil work with masonry and stone, horticulture work and various types of plantation, shrubs shall be provided. Native plants shall be planted.
Tree PlantingA variety of trees as per authority and Green Building norms.
Design For Electric Supply Including Street LightingPole light will be provided. Design for electric supply has been uploaded.
Community BuildingsCommunity building will be a common facility for all phase of Stellar One projects as per approved building plan.
Treatment and Disposal System of Sewage and Sullage water800 KLD S.T.P. shall be provided. It will be provided with collection tank. The treated water shall be used for irrigation and flushing purpose.
Solid Waste Management And Disposal SystemOrganic waste converter and garbage collection/segregation area is already provided as per authority norms for complete project in Stellar One phase 1.
Water Conservation SystemRain water harvesting pits are to provided as per norms of EIA / Authority.
Energy Management System Including Use of Renewable EnergyMix of LED lights shall be used to conserve the energy.
Fire Protection And Fire Safety SystemAs per approved fire drawing smoke detector fire alarm system etc. shall be installed. Fire tender path shall be constructed as per fire norms. Fire fighting system with fire pumps of adequate capacity and water storage tanks shall be provided.
Social Infrastructure And Other Public Amenities Including Public Health ServicesAs per approved fire drawing smoke detector fire alarm systems etc. shall be installed. Fire tender path shall be constructed as per fire norms. Fire fighting system with fire pumps of adequate capacity and water storage tanks shall be provided.
Emergency Evacuation ServicesAs per approved layout. Staircases shall be provided in basement /towards to exit in case of emergency / fire and natural calamity.
Other Miscellaneous WorkAs per architects design.

Bank Details

Bank NameHDFC BANK LTD.
BranchSECTOR - 62, NOIDA
Branch AddressSTELLAR IT PARK, C-25, SECTOR-62, NOIDA
Account HolderSTELLAR SPPL STELLAR ONE PH III COLL A/C
Account Number50200097278195
IFSC CodeHDFC0002649

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy