New Launch - India Real Estate Report 2026.

TOWER 4

Wegmans Industries Pvt Ltd

Gautam Buddha Nagar, Uttar Pradesh

RERA approved

Approved

1st May 2023

Completion pending

Pending

15th Dec 2030

Registration No.

UPRERAPRJ563533

Project Type

Commercial

District

Gautam Buddha Nagar

Taluka

Gautam Buddha Nagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ563533
Project StatusNew
Project CategoryCommercial
DistrictGautam Buddha Nagar
TalukaGautam Buddha Nagar
Start Date2023-05-01
Completion Date2030-12-15
Total Area (sqm)5826
Project Cost (Lacs)3324
Duration (Months)92
Registration Fee69000

Promoter Details

Promoter NameWegmans Industries Pvt Ltd
Promoter IDUPRERAPRM12469
Mobile98********

Project Team

rolename
ArchitectDevesh Verma
ContractorRajiv Baghel
Structural EngineerRavindra Dattatraya Deshpande

Land Details

typekhasra_or_plot_noarea_sqmt
Plot03, Sector Knowledge Park-III, Greater Noida40554

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
TOWER 4GFSHOP11386.9130
TOWER 41SHOP11308.420-
TOWER 42SHOP11308.420-
TOWER 43SHOP1727.20-
TOWER 43OTHER1581.22-
TOWER 44OTHER1505.845-
TOWER 44OTHER1510.080-

Development Works

work_namedescription
Demarcation of PlotsTotal Plot area= 40554 Sq. Mtr. Current Project Plot area= 5826 Sq. Mtr. Plot No.- 03, Sector Knowledge Park-3, Greater Noida UP- Allotted by Greater Noida Industrial Development Authority.
Boundary Wall2.1 meter high boundary wall with 450 mm high brick and plaster wall.
Road WorkAll roads in the complex will be in combination with concrete pavers. Roads will be laid over 225 mm water-bound macadam.
FootpathsAll footpaths in the complex will be a combination of concrete pavers of different colors, shape and thickness of 65 mm and 80 mm laid over 150 mm water bound macadam surface.
Water Supply Including Drinking Water FacilitiesPotable water supply from GNIDA shall be collected in underground collection tank and pumped to overhead water tank (2 numbers) located at the top floor terrace of total capacity of 20KL.
Sewer SystemThe sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project, from where the sewage will be used for irrigation and flushing purpose.
DrainRain water will be collected in drains having a minimum width of 150 mm connected to the underground cement concrete pipeline. For discharge, water will be collected in man holes to be constructed in the periphery of complex and these man holes shall be finally connected with drain of Greater Noida Authority.
ParksNot Applicable
Tree PlantingThe trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
Design For Electric Supply Including Street LightingElectric supply provided through 11/0.415 KV transformers and by DG set supply for backup. External street lighting shall be through solar power with alternate supply through grid.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterSewage shall be treated in Sewage Treatment Plant (STP) and thereafter treated water to be used for flushing and irrigation.
Solid Waste Management And Disposal SystemSolid waste to be collected and stored in garbage room. Recyclable shall be processed in the compost machine to make compost. Non recyclable water shall be disposed of through approved agents of Greater Noida Authority.
Water Conservation SystemRain water harvesting pit shall be provided for ground water recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Energy Management System Including Use of Renewable EnergySolar panel shall be provided on terrace for renewable energy. Single point metering will be therefore energy purchased from the grid/ power supply company.
Fire Protection And Fire Safety SystemFire fighting system shall be provided for building as per the prevailing requirements of National Building Code. Sprinkler shall be provided in all common areas, basement and inside the individual apartments. Smoke dtectors, fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from fire pumps located in the basement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesFire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Other Miscellaneous WorkNot Applicable

Bank Details

Bank NameHDFC Bank
BranchGaur City-1, Greater Noida West Branch
Branch AddressShop No- 4-9, Gaur City-1, AIG Park Greater Noida West, Uttar Pradesh- 201009
Account HolderWEGMANS INDUSTRIES PVT LTD- COLLECTION ACCOUNT FOR TOWER-4
Account Number57500000979123
IFSC CodeHDFC0005212

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy