New Launch - India Real Estate Report 2026.

Aradhyam Plot C

Aradhyam Builders

Ghaziabad, Uttar Pradesh

RERA approved

Approved

1st Apr 2023

Project completed

Completed

31st Mar 2026

Registration No.

UPRERAPRJ794498/08/2024

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ794498/08/2024
Project StatusCompleted
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2023-04-01
Completion Date2026-03-31
Total Area (sqm)4085
Project Cost (Lacs)2801
Duration (Months)36
Registration Fee25500

Promoter Details

Promoter NameAradhyam Builders
Promoter IDUPRERAPRM190650
Mobile99********

Project Team

rolename
ArchitectAnuj Agarwal
ContractorNaveen Tiwari
Structural EngineerAkhilesh Singh

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra2903016
Khasra2911069.59
Khasra294218

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Block-A (Part-A)GF2 BHK344.620
Block-A (Part-A)GF2 BHK242.670
Block-A (Part-A)12 BHK344.62-
Block-A (Part-A)12 BHK242.67-
Block-A (Part-A)22 BHK344.62-
Block-A (Part-A)22 BHK242.67-
Block-A (Part-A)32 BHK344.62-
Block-A (Part-A)32 BHK242.67-
Block-A (Part-A)42 BHK344.62-
Block-A (Part-A)42 BHK242.67-
Block-A (Part-A)52 BHK344.62-
Block-A (Part-A)52 BHK242.67-
Block-A (Part-A)62 BHK344.62-
Block-A (Part-A)62 BHK242.67-
Block-A (Part-A)72 BHK344.62-
Block-A (Part-A)72 BHK242.67-
Block-A (Part-A)82 BHK344.62-
Block-A (Part-A)82 BHK242.67-
Block-A (Part-A)92 BHK344.62-
Block-A (Part-A)92 BHK242.67-
Block-A (Part-A)102 BHK344.62-
Block-A (Part-A)102 BHK242.67-
Block-A (Part-A)112 BHK344.62-
Block-A (Part-A)112 BHK242.67-
Block-A (Part-A)122 BHK344.62-
Block-A (Part-A)122 BHK244.67-
Block-A (Part-X-EWS)GF1 BHK422.890
Block-A (Part-X-EWS)GF1 BHK1122.890
Block-A (Part-X-EWS)GF1 BHK122.960
Block-A (Part-X-EWS)GF1 BHK124.570
Block-A (Part-X-EWS)11 BHK522.89-
Block-A (Part-X-EWS)11 BHK1122.89-
Block-A (Part-X-EWS)11 BHK122.96-
Block-A (Part-X-EWS)11 BHK124.57-
Block-A (Part-X-EWS)21 BHK1622.89-
Block-A (Part-X-EWS)21 BHK122.96-
Block-A (Part-X-EWS)21 BHK124.57-
Block-A (Part-X-EWS)31 BHK1622.89-
Block-A (Part-X-EWS)31 BHK122.96-
Block-A (Part-X-EWS)31 BHK124.57-
Block-A (Part-X-EWS)41 BHK1622.89-
Block-A (Part-X-EWS)41 BHK122.96-
Block-A (Part-X-EWS)41 BHK124.57-
Block-A (Part-X-EWS)51 BHK1622.89-
Block-A (Part-X-EWS)51 BHK122.96-
Block-A (Part-X-EWS)51 BHK124.57-
Block-A (Part-X-EWS)61 BHK1622.89-
Block-A (Part-X-EWS)61 BHK122.96-
Block-A (Part-X-EWS)61 BHK124.57-
Block-A (Part-X-EWS)71 BHK1622.89-
Block-A (Part-X-EWS)71 BHK122.96-
Block-A (Part-X-EWS)71 BHK124.57-
Block-A (Part-X-EWS)81 BHK1622.89-
Block-A (Part-X-EWS)81 BHK122.96-
Block-A (Part-X-EWS)81 BHK124.57-
Block-A (Part-X-EWS)91 BHK1622.89-
Block-A (Part-X-EWS)91 BHK122.96-
Block-A (Part-X-EWS)91 BHK124.57-
Block-A (Part-X-EWS)101 BHK1622.89-
Block-A (Part-X-EWS)101 BHK122.96-
Block-A (Part-X-EWS)101 BHK124.57-
Block-A (Part-X-EWS)111 BHK1622.89-
Block-A (Part-X-EWS)111 BHK122.96-
Block-A (Part-X-EWS)111 BHK124.57-
Block-A (Part-X-EWS)121 BHK1622.89-
Block-A (Part-X-EWS)121 BHK122.96-
Block-A (Part-X-EWS)121 BHK122.57-
Block-A (Part-X-EWS)131 BHK1622.89-
Block-A (Part-X-EWS)131 BHK122.96-
Block-A (Part-X-EWS)131 BHK124.57-

Development Works

work_namedescription
Demarcation of PlotsPlot-C Kh. no. 290m, 291m and 294m Village pasonda, Ghaziabad
Boundary Wall230mm wide and 2.1 metre high earthquake resistant boundary wall of RCC/ Mild steel/ brick filled.
Road WorkAll roads in the complex will in combination of concrete pavers of different colors, shape thickness. Roads will be laid over 225 mm water bound macadam.
FootpathsAll footpaths in the complex will be in combiantion of concrete pavers of different colors, shape and thickness of 65mm and 80mm laid over 150mm water bound macadam surface.
Water Supply Including Drinking Water FacilitiesPotable water supply from Muncipal Water supply shall be collected in underground collection tank and pumped to overhead water tank. The supply of water to individual flats shall be from said overhead and tanks.
Sewer SystemThe sewage will be collected through a soil pipeline arrangement, bends and inspection chambers lending to the sewage water treatment plan (STP) of the project and treated water be used to irrigation and flushing purpose.
DrainDrains having a minimum width of 150 mm will be provided for collection and channelisation rain water (surface runoff)
ParksInternal park will be provided and maintained.
Tree PlantingThe trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted a manner to ensure that there is no hindance in the services/ usage in the Project.
Design For Electric Supply Including Street LightingElectric supply provided through 11/0.433 KV transformers and by DG set supply for backup.
Community BuildingsCommunity facilities area has been designed as per authority norms and facilities.
Treatment and Disposal System of Sewage and Sullage waterSewage shall be reated in Sewage Treatment Plan (STP) and thereafter treated water to be used for flushing and irrigation.
Solid Waste Management And Disposal SystemSolid waste to be collected from individual flats and stored in garbage room. Recylable shall be processed in the Discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Water Conservation SystemRain water harvesting pitsshall be provided for ground water recharging and overflow to be discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Energy Management System Including Use of Renewable EnergySingle/ Multi point metering will be there for energy purchased from the gird/ power supply company.
Fire Protection And Fire Safety SystemSprinkler, fire doors, yard hydrants, smoke detector and fire alarm system will be provided as applicable.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable
Emergency Evacuation ServicesFire staircases shall be provided as per the approved fire drawing for evacuatin to open areas.
Other Miscellaneous WorkNot applicable

Bank Details

Bank NameSTATE BANK OF INDIA
BranchNavyug Market, Ghaziabad
Branch AddressNavyug Market, Ghaziabad, 201001
Account HolderARADHYAM BUILDERS COLLECTION AC FOR ARADHYAM PLOT C
Account Number41340759077
IFSC CodeSBIN0009298

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy