New Launch - India Real Estate Report 2026.

CHURNING MONK

GAURA BUILDERS PRIVATE LIMITED

Ghaziabad, Uttar Pradesh

RERA approved

Approved

12th Jun 2025

Completion pending

Pending

30th Jun 2029

Registration No.

UPRERAPRJ400892/08/2025

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ400892/08/2025
Project StatusNew
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2025-06-12
Completion Date2029-06-30
Total Area (sqm)2667
Project Cost (Lacs)3961
Duration (Months)49
Registration Fee18500

Promoter Details

Promoter NameGAURA BUILDERS PRIVATE LIMITED
Promoter IDUPRERAPRM331605
Mobile88********

Project Team

rolename
ArchitectSUNNY KUMAR SINGLA
ContractorP.C. JAINA
Structural EngineerRJSET ENGINEERS

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1131M2671

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
1BSMNT4 BHK00-
1BSMNT24 BHK00-
1BSMNT34 BHK00-
1GF4 BHK000
1LGF4 BHK00-
1UGF4 BHK00-
114 BHK1197.08-
114 BHK1197.08-
124 BHK1197.08-
124 BHK1197.08-
134 BHK1197.08-
134 BHK1197.08-
144 BHK1197.08-
144 BHK1197.08-
154 BHK1197.08-
154 BHK1197.08-
164 BHK1197.08-
164 BHK1197.08-
174 BHK1197.08-
174 BHK1197.08-
184 BHK1197.08-
184 BHK1197.08-
194 BHK1197.08-
194 BHK1197.08-
1104 BHK1197.08-
1104 BHK1197.08-
1114 BHK1197.08-
1114 BHK1197.08-
1124 BHK1197.08-
1124 BHK1197.08-
1134 BHK1197.08-
1134 BHK1197.08-
1144 BHK1197.08-
1144 BHK1197.08-
1151 BHK160.82-
1151 BHK160.82-

Development Works

work_namedescription
Demarcation of PlotsAS PER SITE PLAN
Boundary WallPRECAST 5FT HEIGHT BOUNDARY WALL
Road WorkSHALLBE DEVELOPED AS SHOWN IN LAYOUT.HEAVY PAIVER SHALL BE LAID.THICKNESS WILL BE 300 MM
FootpathsFINISHED WITH INTERLOCKING TILES
Water Supply Including Drinking Water FacilitiesCPVC PIPES SHALL BE LAID DOWN FROM UNDERGROUND WATER TANK TO OVERHEAD WATER TANK IN EACH BLOCK.
Sewer SystemUPVC PIPES SHALL BE LAID DOWN FROM SEWRGE TO PLUMBING SHAFT JOINT TO VERTICAL STACKS AND THEN TRANSFER TO MAIN SEWER HOLE.
DrainUPVC PIPES SHALL BE LAID INTO BALCONY AND TERRACE CONNECTED TO DRAINAGE MANHOLE.
Parks5 PERCENT GREEN AREA IS TO BE DEVELOPED AS PER NORMS.
Tree PlantingTREE-SILVER OAK TREE,NEEM ETC.
Design For Electric Supply Including Street LightingWILL BE PROVIDED AS PER UPPCL GUIDELINES
Community BuildingsCLUB IS PROVIDED.
Treatment and Disposal System of Sewage and Sullage waterSTP IS PROVIDED. EXCESS WATER IS TO BE DISPOSED TO MAIN SEWER LINE.
Solid Waste Management And Disposal SystemALL WASTE IS SEGRIGATE AT SITE AND DISPOSE BY AUTHORIZED VENDOR
Water Conservation SystemDUAL FLUSHING WILL BE PROVIDED
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemFIRE SAFETY WILL BE INSTALLED AS PER NBC 2016 CODE NORMS.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesAS NBC 2016 NORMS
Other Miscellaneous WorkIF REQUIRED THEN WILL BE DONE

Bank Details

Bank NameINDIAN OVERSEAS BANK
BranchBRANCH2,NAVYUG MARKET ,GHAZIABAD
Branch AddressBRANCH2, NAVYUG MARKET,GHAZIYABAD
Account HolderGAURA BUILDERS PVT LTD COLLECTION ACCOUNT FOR CHURNING MONK
Account Number045702000003400
IFSC CodeIOBA0000457

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy