CIVIL LINES
PRITHVEELINK DEVELOPERS PVT. LTD.
Ghaziabad, Uttar Pradesh
Approved
27th Aug 2023
Pending
27th Aug 2027
Registration No.
UPRERAPRJ828031
Project Type
Residential
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ828031 |
| Project Status | New |
| Project Category | Residential |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2023-08-27 |
| Completion Date | 2027-08-27 |
| Total Area (sqm) | 12030 |
| Project Cost (Lacs) | 1555 |
| Duration (Months) | 49 |
| Registration Fee | 65500 |
Promoter Details
| Promoter Name | PRITHVEELINK DEVELOPERS PVT. LTD. |
| Promoter ID | UPRERAPRM246642 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | ANUJ AGARWAL |
| Contractor | N.A. |
| Structural Engineer | N.A. |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 606 | 12030 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | There are Total of 67 Residential Plots plus 2 Commercial Plots as per Sanctioned map by Ghaziabad Development Authority. All the Plots will be demarcated by the kerb stones at the corners as per the size and alignment of the plots will be done as per the approved map. |
| Boundary Wall | Project Boundary with Wall / MS Grill (of approximately 6 feet height over RCC plinth beam) will be constructed along the project boundary as per sanctioned map by Ghaziabad Development Authority. The foundation of the boundary will be constructed with RCC / brick and mortar. |
| Road Work | Bitumen / CC based road will be constructed as per approved layout map. Best quality roads will be constructed with use of A Grade material. The Slopes - Longitudinal and Transverse will be maintained to assist smooth ride and quick removal of water. |
| Footpaths | Footpaths will be constructed as per project requirements and needs. Compacted earth topped with sand bed and then 80 mm interlocking paver tiles would be laid to assist safe walking with anti skid all weather surface. The strength of paving blocks will be approximately M-30. |
| Water Supply Including Drinking Water Facilities | Government water supply would be seeked after taking approvals from statutory departments. Underground water tank is being constructed in the project. The water will be pumped to individual units through underground piping arrangement. |
| Sewer System | Centralized sewer system shall be provided. All sewerage water shall go to the project STP for treatment and treated water shall be recycled and it will be used in gardening. |
| Drain | Storm water system shall be provided. Storm water from roads and other landscape areas shall be connected to storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall be connected with project drain. |
| Parks | Park will be laid as per layout approved by Ghaziabad Development Authority. The lush green park will also be having sitting area. |
| Tree Planting | Tree plantation of different variety of trees as per site conditions are planned by following authority guidelines. |
| Design For Electric Supply Including Street Lighting | The Electrical Design for the domestic usage and common areas of the project will be designed as per guidelines issued by local electricity department. Separate transformer and electrical room will be provided for the project. MS street light designer poles with energy saving LED lighting fixtures will be used and the electrical connection will be provided to each unit through distribution box. |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | STP will be installed at the site for treatment of the Sewer and treated water will be recycled for use in gardening. |
| Solid Waste Management And Disposal System | 15 Sq. Mts. Garbage Collection Centre is to be constructed within the project for solid waste management. In addition, garbage collection bins will be installed at common areas to keep the project premise clean. |
| Water Conservation System | Rain water harvesting pit(s) will be constructed in the project to collect storm and rain water. The water will be collected in the collection chamber which will be put through series of granular filtration process to clear the water, which will then be taken down to the water table through perforate PVC pipe. |
| Energy Management System Including Use of Renewable Energy | Not Applicable, still all the common energy consumptions will be reduced through use of better and latest technologies. |
| Fire Protection And Fire Safety System | Not Applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | Not Applicable |
| Other Miscellaneous Work | As per project Requirement |
Bank Details
| Bank Name | ICICI BANK |
| Branch | Indirapuram, Ghaziabad-201010 (U.P.) |
| Branch Address | AG-1, Plot No. 3, Aditya City Centre, Vaibhav Khand, Indirapuram, Ghaziabad-201010 (U.P.) |
| Account Holder | PRITHVEELINK DEVELOPERS PVT. LTD. COLLECTION ACCOUNT FOR CIVIL LINES |
| Account Number | 003105042933 |
| IFSC Code | ICIC0000718 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in