C/o of 480 EWS (G+3) houses and development of 1200 buildings under PMAY scheme at Pratap vihar, Ghaziabad
Ghaziabad Development Authority
Ghaziabad, Uttar Pradesh
Approved
1st Nov 2022
Completed
31st Oct 2025
Registration No.
UPRERAPRJ762848/05/2024
Project Type
Residential
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ762848/05/2024 |
| Project Status | Completed |
| Project Category | Residential |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2022-11-01 |
| Completion Date | 2025-10-31 |
| Total Area (sqm) | 13068 |
| Project Cost (Lacs) | 2779 |
| Duration (Months) | 36 |
| Registration Fee | 70500 |
Promoter Details
| Promoter Name | Ghaziabad Development Authority |
| Promoter ID | UPRERAPRM11404 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | RAJIV RATAN SHAH |
| Contractor | SUNIL GARG AND COMPANY |
| Structural Engineer | RAKESH KUMAR SINGH |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 315 | 363332 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 14 | GF | 1 BHK | 12 | 22.77 | 0 |
| 14 | 1 | 1 BHK | 12 | 22.77 | - |
| 14 | 2 | 1 BHK | 12 | 22.77 | - |
| 14 | 3 | 1 BHK | 12 | 22.77 | - |
| 15 | GF | 1 BHK | 12 | 22.77 | 0 |
| 15 | 1 | 1 BHK | 12 | 22.77 | - |
| 15 | 2 | 1 BHK | 12 | 22.77 | - |
| 15 | 3 | 1 BHK | 12 | 22.77 | - |
| 17 | GF | 1 BHK | 12 | 22.77 | 0 |
| 17 | 1 | 1 BHK | 12 | 22.77 | - |
| 17 | 2 | 1 BHK | 12 | 22.77 | - |
| 17 | 3 | 1 BHK | 12 | 22.77 | - |
| 19 | GF | 1 BHK | 12 | 22.77 | 0 |
| 19 | 1 | 1 BHK | 12 | 22.77 | - |
| 19 | 2 | 1 BHK | 12 | 22.77 | - |
| 19 | 3 | 1 BHK | 12 | 22.77 | - |
| 20 | GF | 1 BHK | 12 | 22.77 | 0 |
| 20 | 1 | 1 BHK | 12 | 22.77 | - |
| 20 | 2 | 1 BHK | 12 | 22.77 | - |
| 20 | 3 | 1 BHK | 12 | 22.77 | - |
| 21 | GF | 1 BHK | 12 | 22.77 | 0 |
| 21 | 1 | 1 BHK | 12 | 22.77 | - |
| 21 | 2 | 1 BHK | 12 | 22.77 | - |
| 21 | 3 | 1 BHK | 12 | 22.77 | - |
| 22 | GF | 1 BHK | 12 | 22.77 | 0 |
| 22 | 1 | 1 BHK | 12 | 22.77 | - |
| 22 | 2 | 1 BHK | 12 | 22.77 | - |
| 22 | 3 | 1 BHK | 12 | 22.77 | - |
| 23 | GF | 1 BHK | 12 | 22.77 | 0 |
| 23 | 1 | 1 BHK | 12 | 22.77 | - |
| 23 | 2 | 1 BHK | 12 | 22.77 | - |
| 23 | 3 | 1 BHK | 12 | 22.77 | - |
| 24 | GF | 1 BHK | 12 | 22.77 | 0 |
| 24 | 1 | 1 BHK | 12 | 22.77 | - |
| 24 | 2 | 1 BHK | 12 | 22.77 | - |
| 24 | 3 | 1 BHK | 12 | 22.77 | - |
| 25 | GF | 1 BHK | 12 | 22.77 | 0 |
| 25 | 1 | 1 BHK | 12 | 22.77 | - |
| 25 | 2 | 1 BHK | 12 | 22.77 | - |
| 25 | 3 | 1 BHK | 12 | 22.77 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Demarcation of plots will be done after all the development work is completed. |
| Boundary Wall | Brick work boundary wall at the height of 0.85 m and length of 295.20m is propose. |
| Road Work | Road will constrcution as per sanctioned layout plan, Earth filling work sub grade prepration, GSB-200mm laying, WMM-150 mm laying and final premix carpet-20mm will be done in stepwise construction/development program. |
| Footpaths | Foothpath will be made as per requirment. |
| Water Supply Including Drinking Water Facilities | water supply through overhead water tank already constrcuted nearly. HDPE pipe 110mm, 160mm, Swith incubes, Air valves, fore hydrant should be installed as per sanctioned plan. |
| Sewer System | Sewer systemwith STP proposed, Sewer will be constructed under ground which will be linked with the main trunck sewer using 250mm SN 8 Pipe and 300mm SN 8 Pipe at adjcent main road STP is situated at Pratap Vihar (for the proposed project). |
| Drain | RCC drain system with the size of 300mm X 350mm and 500mm X 600mm will be constructed as per the sanction layout plan. |
| Parks | All the parks will be developed as per sanctioned layout plan according to specifications Bricks made boundary wall at the height of 1 meter is also proposed around the parks |
| Tree Planting | Many types of flower Bushes and trees is propose to plant in the park bushes and trees is the part of the green area. |
| Design For Electric Supply Including Street Lighting | Electricity work is proposed street lighting on each external road through electric pole. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | STP is situated at Pratap Vihar near Jal nigam for disposal of sewer to adjcent main trunk sewer line already laid at adjcent main road. |
| Solid Waste Management And Disposal System | Solid waste management and disposal system has been already proposed to adjcent sector of Pratap vihar there for SWM will be done at nearby site. After completing the project solid waste management system will be handed over to the Nagar nigam Ghaziabad. |
| Water Conservation System | Yes provision of disposal of drain/storm water through Rain Water Harvesting. |
| Energy Management System Including Use of Renewable Energy | not applicable |
| Fire Protection And Fire Safety System | not applicable |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Area Reserved for Commercial plots. |
| Emergency Evacuation Services | not applicable |
| Other Miscellaneous Work | not applicable |
Bank Details
| Bank Name | HDFC BANK LTD. |
| Branch | SANJAY NAGAR GHAZIABAD |
| Branch Address | HDFC BANK LTD, GROUND FLOOR, P 39, 1, SANJAY NAGAR, DISTT-GHAZIABAD |
| Account Holder | VC GDA COLL A/C P VIHAR SCH 480 EWS |
| Account Number | 50100511383525 |
| IFSC Code | HDFC0008754 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur