New Launch - India Real Estate Report 2026.

Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad

U.P. Awas Evam Vikas Parishad

Ghaziabad, Uttar Pradesh

RERA approved

Approved

1st Jan 2022

Completion pending

Pending

30th Sept 2026

Registration No.

UPRERAPRJ623188

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ623188
Project StatusNew
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2022-01-01
Completion Date2026-09-30
Total Area (sqm)47243
Project Cost (Lacs)8968
Duration (Months)57
Registration Fee241500

Promoter Details

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter IDUPRERAPRM4243
Mobile87********

Project Team

rolename
ArchitectArvind Deo Arya
ContractorAman Tyagi
Structural EngineerAman Tyagi

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1359, 1360, 1361, 1362 , 1363, 1366, 1367, 1369, 1370 (Part)18890
Khasra2, 3, 4, 5, 15, 5628414

Unit Configuration

Development TypeSize Of plotNumber Of Plot/VillasCarpet Area Of The Villa(In Sq. Mt.)
Villa1625695
Villa1126066
Villa757636
Villa606035

Development Works

work_namedescription
Demarcation of PlotsAs per Approved Lay out Plan
Boundary WallNo Provision of Boundary wall
Road WorkTrunk Roads of Mandola Vihar yojna are already constructed. Internal Roads of 9.0 m and 12.0 m are proposed, which will be constructed by UPAVP as per Parishad Specification
FootpathsAs per specification of UPAVP
Water Supply Including Drinking Water FacilitiesInternal Water supply Line of PVC pipe of 110 mm dia will be laid as per design approved by the competent authority of UPAVP. Water supply will be given by Over head tank which will be constructed by parishad
Sewer SystemInternal Sewer line of 250mm dia RCC NP2 and NP3 pipe will be laid as per design approved by the competant authority of UPAVP
DrainInternal Storm water drain of CK and C type will be provided as per design approved by the competant authority of UPAVP
ParksOpen / Green will be provided as per approved layout.
Tree PlantingTree Planting will be done by UPAVP as per norms approved by horticulture section of Parishad
Design For Electric Supply Including Street LightingElectrification work and street light work will be done by UPAVP as per design and drawing approved by the competant authority of UPAVP. Electricity supply line will be handed over to UP Power corporation after completing and testing of line.
Community BuildingsNo Provision of Community Building
Treatment and Disposal System of Sewage and Sullage waterWill be done by UPAVP as per Specification
Solid Waste Management And Disposal SystemTo be Provided as per UPAVP norms / specification
Water Conservation SystemPresently not planned
Energy Management System Including Use of Renewable EnergyPresently not planned
Fire Protection And Fire Safety Systemas per norms/ specification
Social Infrastructure And Other Public Amenities Including Public Health ServicesPlanned as per provision in the vicinity of the project
Emergency Evacuation Servicesas per layout
Other Miscellaneous WorkNo

Bank Details

Bank NameHDFC Bank
BranchGhaziabad Vasundhara
Branch Address4/5, Om PLaza, Sector-15C, Vasundhara Ghaziabad
Account HolderUPAVP Mandola Vihar Yojna Gzb Collection A/C
Account Number50100453213462
IFSC CodeHDFC000563

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy