New Launch - India Real Estate Report 2026.

Construction of 432 EWS units under PMAY Scheme at Dasna Ghaziabad

Ghaziabad Development Authority

Ghaziabad, Uttar Pradesh

RERA approved

Approved

11th Mar 2019

Project completed

Completed

9th Mar 2022

Registration No.

UPRERAPRJ520694

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ520694
Project StatusCompleted
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2019-03-11
Completion Date2022-03-09
Total Area (sqm)14074
Project Cost (Lacs)3388
Duration (Months)36
Registration Fee75500

Promoter Details

Promoter NameGhaziabad Development Authority
Promoter IDUPRERAPRM11404
Mobile96********

Project Team

rolename
ArchitectPLANNING SECTION
ContractorSUNIL GARG AND COMPANY
Structural EngineerJAMIA MILIA ISLAMIA UNIVERSITY

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra2301MI14620

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
BLOCK 1GF1 BHK1222.670
BLOCK 111 BHK1222.67-
BLOCK 121 BHK1222.67-
BLOCK 131 BHK1222.67-
BLOCK 2GF1 BHK1222.670
BLOCK 211 BHK1222.67-
BLOCK 221 BHK1222.67-
BLOCK 231 BHK1222.67-
BLOCK 3GF1 BHK1222.670
BLOCK 311 BHK1222.67-
BLOCK 321 BHK1222.67-
BLOCK 331 BHK1222.67-
BLOCK 4GF1 BHK1222.670
BLOCK 411 BHK1222.67-
BLOCK 421 BHK1222.67-
BLOCK 431 BHK1222.67-
BLOCK 5GF1 BHK1222.670
BLOCK 511 BHK1222.67-
BLOCK 521 BHK1222.67-
BLOCK 531 BHK1222.67-
BLOCK 6GF1 BHK1222.670
BLOCK 611 BHK1222.67-
BLOCK 621 BHK1222.67-
BLOCK 631 BHK1222.67-
BLOCK 7GF1 BHK1222.670
BLOCK 711 BHK1222.67-
BLOCK 721 BHK1222.67-
BLOCK 731 BHK1222.67-
BLOCK 8GF1 BHK1222.670
BLOCK 811 BHK1222.67-
BLOCK 821 BHK1222.67-
BLOCK 831 BHK1222.67-
BLOCK 9GF1 BHK1222.670
BLOCK 911 BHK1222.67-
BLOCK 921 BHK1222.67-
BLOCK 931 BHK1222.67-

Development Works

work_namedescription
Demarcation of PlotsNORTH- ABADI, SOUTH-ROAD, EAST-ABADI, WEST-ROAD/ABADI
Boundary Wall5 FT HEIGHT BOUNDARY WALL SHOULD BE CONSTRUCTED
Road WorkIN 6MTR WIDE ROAD 1 LAYER GSB THEN 80MM THICK RUBBER MOLDED INTERLOCKING TILES IN 5MTR WIDTH, IN MAINS ROADS 1 LAYER GSB, WMM, DBM. AND THEN BC ARE PROPOSED
FootpathsNA
Water Supply Including Drinking Water FacilitiesWATER SUPPLY SHOULD BE PROVIDED O/H/T DISTRIBUTION LINE 110MM DIA HDPE PIPE
Sewer SystemTHROUGH RCC HUME PIPE 300DIA AND 250MM DIA VIA STP
DrainBRICK IN DRAIN IN CEMENT MORTAR AND THEN PLASTER
ParksBRICK IN BOUNDARY WALL AND INNERSIDE GREEN PLANTATION
Tree PlantingPROPOSED
Design For Electric Supply Including Street LightingTO BE PROVIDED THROUGH SUBSTATION PROPOSED
Community BuildingsTO BE PROPOSED
Treatment and Disposal System of Sewage and Sullage waterTO BE PROVIDED BY STP
Solid Waste Management And Disposal SystemTO BE PROVIDED BY NAGAR NIGAM
Water Conservation SystemNA
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemFIRE HYDRANT SHOULD BE PROVIDED IN WATER MAIN
Social Infrastructure And Other Public Amenities Including Public Health ServicesSPACE PROVIDED FOR COMMUNITY FACILITIES
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameVIJAYA BANK
BranchNAVYUG MARKET
Branch AddressNAVYUG MARKET GHAZIABAD
Account HolderVC GDA PMAY
Account Number711301012000061
IFSC CodeVIJB0007113

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy