Global City Walk
Garg Realtech Private Limited
Ghaziabad, Uttar Pradesh
Approved
1st Jul 2023
Pending
30th Jun 2027
Registration No.
UPRERAPRJ958302
Project Type
Commercial
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ958302 |
| Project Status | New |
| Project Category | Commercial |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2023-07-01 |
| Completion Date | 2027-06-30 |
| Total Area (sqm) | 5714.12 |
| Project Cost (Lacs) | 8224 |
| Duration (Months) | 48 |
| Registration Fee | 69000 |
Promoter Details
| Promoter Name | Garg Realtech Private Limited |
| Promoter ID | UPRERAPRM224165 |
| Mobile | 95******** |
Project Team
| role | name |
|---|---|
| Architect | Anuj Agarwal Architects |
| Contractor | P K Sharma |
| Structural Engineer | Keen Associates Pvt. Ltd |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 522M & 526D | 5889.94 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Block - A | BSMNT | SHOP | 1 | 12.32 | - |
| Block - A | BSMNT | SHOP | 1 | 8 | - |
| Block - A | BSMNT | SHOP | 1 | 8.99 | - |
| Block - A | BSMNT | SHOP | 1 | 9 | - |
| Block - A | BSMNT | SHOP | 1 | 11.87 | - |
| Block - A | BSMNT | SHOP | 1 | 12 | - |
| Block - A | BSMNT | SHOP | 2 | 12.25 | - |
| Block - A | BSMNT | SHOP | 1 | 12.27 | - |
| Block - A | BSMNT | SHOP | 2 | 12.65 | - |
| Block - A | BSMNT | SHOP | 1 | 12.69 | - |
| Block - A | BSMNT | SHOP | 1 | 12.70 | - |
| Block - A | BSMNT | SHOP | 1 | 12.82 | - |
| Block - A | BSMNT | SHOP | 1 | 12.93 | - |
| Block - A | BSMNT | SHOP | 1 | 13.49 | - |
| Block - A | BSMNT | SHOP | 1 | 13.52 | - |
| Block - A | BSMNT | SHOP | 4 | 13.64 | - |
| Block - A | BSMNT | SHOP | 4 | 13.65 | - |
| Block - A | BSMNT | SHOP | 1 | 13.68 | - |
| Block - A | BSMNT | SHOP | 1 | 13.78 | - |
| Block - A | BSMNT | SHOP | 1 | 13.79 | - |
| Block - A | BSMNT | SHOP | 6 | 13.93 | - |
| Block - A | BSMNT | SHOP | 1 | 14.08 | - |
| Block - A | BSMNT | SHOP | 2 | 14.53 | - |
| Block - A | BSMNT | SHOP | 1 | 14.73 | - |
| Block - A | BSMNT | SHOP | 1 | 14.76 | - |
| Block - A | BSMNT | SHOP | 1 | 17.45 | - |
| Block - A | BSMNT | SHOP | 1 | 19.17 | - |
| Block - A | BSMNT | SHOP | 1 | 20.94 | - |
| Block - A | BSMNT | OTHER | 1 | 145.42 | - |
| Block - A | BSMNT | OTHER | 1 | 181 | - |
| Block - A | BSMNT | OTHER | 1 | 227.63 | - |
| Block - A | BSMNT | OTHER | 1 | 55.85 | - |
| Block - A | GF | SHOP | 1 | 12.32 | 0 |
| Block - A | GF | SHOP | 1 | 8 | 0 |
| Block - A | GF | SHOP | 2 | 8.74 | 0 |
| Block - A | GF | SHOP | 1 | 8.86 | 0 |
| Block - A | GF | SHOP | 1 | 8.92 | 0 |
| Block - A | GF | SHOP | 1 | 8.95 | 0 |
| Block - A | GF | SHOP | 1 | 8.99 | 0 |
| Block - A | GF | SHOP | 2 | 9 | 0 |
| Block - A | GF | SHOP | 1 | 9.15 | 0 |
| Block - A | GF | SHOP | 1 | 9.26 | 0 |
| Block - A | GF | SHOP | 1 | 10.34 | 0 |
| Block - A | GF | SHOP | 1 | 10.35 | 0 |
| Block - A | GF | SHOP | 1 | 10.60 | 0 |
| Block - A | GF | SHOP | 2 | 10.83 | 0 |
| Block - A | GF | SHOP | 2 | 11.07 | 0 |
| Block - A | GF | SHOP | 1 | 11.08 | 0 |
| Block - A | GF | SHOP | 1 | 11.20 | 0 |
| Block - A | GF | SHOP | 2 | 11.39 | 0 |
| Block - A | GF | SHOP | 1 | 11.53 | 0 |
| Block - A | GF | SHOP | 1 | 11.74 | 0 |
| Block - A | GF | SHOP | 1 | 11.87 | 0 |
| Block - A | GF | SHOP | 1 | 12 | 0 |
| Block - A | GF | SHOP | 2 | 12.25 | 0 |
| Block - A | GF | SHOP | 1 | 12.27 | 0 |
| Block - A | GF | SHOP | 1 | 12.36 | 0 |
| Block - A | GF | SHOP | 1 | 12.41 | 0 |
| Block - A | GF | SHOP | 1 | 12.42 | 0 |
| Block - A | GF | SHOP | 2 | 12.65 | 0 |
| Block - A | GF | SHOP | 2 | 12.69 | 0 |
| Block - A | GF | SHOP | 2 | 12.70 | 0 |
| Block - A | GF | SHOP | 2 | 12.82 | 0 |
| Block - A | GF | SHOP | 1 | 12.93 | 0 |
| Block - A | GF | SHOP | 1 | 13.27 | 0 |
| Block - A | GF | SHOP | 1 | 13.49 | 0 |
| Block - A | GF | SHOP | 1 | 13.52 | 0 |
| Block - A | GF | SHOP | 4 | 13.64 | 0 |
| Block - A | GF | SHOP | 4 | 13.65 | 0 |
| Block - A | GF | SHOP | 1 | 13.68 | 0 |
| Block - A | GF | SHOP | 1 | 13.78 | 0 |
| Block - A | GF | SHOP | 1 | 13.79 | 0 |
| Block - A | GF | SHOP | 6 | 13.93 | 0 |
| Block - A | GF | SHOP | 1 | 14.08 | 0 |
| Block - A | GF | SHOP | 2 | 14.53 | 0 |
| Block - A | GF | SHOP | 1 | 14.73 | 0 |
| Block - A | GF | SHOP | 1 | 14.76 | 0 |
| Block - A | GF | SHOP | 1 | 17.45 | 0 |
| Block - A | GF | SHOP | 1 | 19.17 | 0 |
| Block - A | GF | SHOP | 1 | 20.94 | 0 |
| Block - A | GF | OTHER | 1 | 64.14 | 0 |
| Block - A | GF | OTHER | 1 | 78.46 | 0 |
| Block - A | GF | OTHER | 1 | 74.91 | 0 |
| Block - A | 1 | SHOP | 1 | 12.32 | - |
| Block - A | 1 | SHOP | 1 | 8 | - |
| Block - A | 1 | SHOP | 1 | 8.99 | - |
| Block - A | 1 | SHOP | 1 | 9 | - |
| Block - A | 1 | SHOP | 1 | 11.87 | - |
| Block - A | 1 | SHOP | 1 | 12 | - |
| Block - A | 1 | SHOP | 2 | 12.25 | - |
| Block - A | 1 | SHOP | 1 | 12.27 | - |
| Block - A | 1 | SHOP | 1 | 12.69 | - |
| Block - A | 1 | SHOP | 1 | 12.70 | - |
| Block - A | 1 | SHOP | 1 | 12.82 | - |
| Block - A | 1 | SHOP | 1 | 12.93 | - |
| Block - A | 1 | SHOP | 1 | 13.52 | - |
| Block - A | 1 | SHOP | 2 | 13.64 | - |
| Block - A | 1 | SHOP | 4 | 13.65 | - |
| Block - A | 1 | SHOP | 1 | 13.78 | - |
| Block - A | 1 | SHOP | 1 | 13.79 | - |
| Block - A | 1 | SHOP | 2 | 13.93 | - |
| Block - A | 1 | SHOP | 1 | 14.08 | - |
| Block - A | 1 | SHOP | 2 | 14.53 | - |
| Block - A | 1 | SHOP | 1 | 14.73 | - |
| Block - A | 1 | SHOP | 1 | 14.76 | - |
| Block - A | 1 | SHOP | 1 | 17.45 | - |
| Block - A | 1 | SHOP | 1 | 19.17 | - |
| Block - A | 1 | SHOP | 1 | 20.94 | - |
| Block - A | 1 | SHOP | 1 | 61.30 | - |
| Block - A | 1 | OTHER | 1 | 85.16 | - |
| Block - A | 1 | OTHER | 1 | 559.12 | - |
| Block - A | 1 | OTHER | 1 | 56.70 | - |
| Block - A | 2 | OTHER | 1 | 558.68 | - |
| Block - A | 2 | OTHER | 1 | 56.72 | - |
| Block - A | 2 | OTHER | 1 | 25.64 | - |
| Block - A | 2 | OTHER | 1 | 25.68 | - |
| Block - A | 2 | OTHER | 1 | 216.28 | - |
| Block - A | 2 | 1 BHK | 2 | 25.33 | - |
| Block - A | 2 | 1 BHK | 2 | 31.42 | - |
| Block - A | 2 | 1 BHK | 2 | 32.65 | - |
| Block - A | 4 | 1 BHK | 5 | 24.36 | - |
| Block - A | 4 | 1 BHK | 2 | 25.33 | - |
| Block - A | 4 | 1 BHK | 4 | 28.21 | - |
| Block - A | 4 | 1 BHK | 8 | 31.42 | - |
| Block - A | 4 | 1 BHK | 6 | 32.65 | - |
| Block - A | 4 | 1 BHK | 1 | 25.16 | - |
| Block - A | 4 | 1 BHK | 4 | 24.32 | - |
| Block - A | 5 | 1 BHK | 5 | 24.36 | - |
| Block - A | 5 | 1 BHK | 2 | 25.33 | - |
| Block - A | 5 | 1 BHK | 4 | 28.81 | - |
| Block - A | 5 | 1 BHK | 8 | 31.42 | - |
| Block - A | 5 | 1 BHK | 6 | 32.65 | - |
| Block - A | 5 | 1 BHK | 1 | 25.16 | - |
| Block - A | 5 | 1 BHK | 4 | 24.32 | - |
| Block - A | 6 | 1 BHK | 5 | 24.36 | - |
| Block - A | 6 | 1 BHK | 2 | 25.33 | - |
| Block - A | 6 | 1 BHK | 4 | 31.42 | - |
| Block - A | 6 | 1 BHK | 8 | 31.42 | - |
| Block - A | 6 | 1 BHK | 6 | 32.65 | - |
| Block - A | 6 | 1 BHK | 1 | 25.16 | - |
| Block - A | 6 | 1 BHK | 4 | 24.32 | - |
| Block - A | 7 | OTHER | 3 | 24.36 | - |
| Block - A | 7 | 1 BHK | 2 | 25.33 | - |
| Block - A | 7 | OTHER | 4 | 28.81 | - |
| Block - A | 7 | OTHER | 6 | 31.42 | - |
| Block - A | 7 | 1 BHK | 2 | 31.42 | - |
| Block - A | 7 | OTHER | 4 | 32.65 | - |
| Block - A | 7 | 1 BHK | 2 | 32.65 | - |
| Block - A | 8 | 1 BHK | 3 | 24.36 | - |
| Block - A | 8 | 1 BHK | 2 | 25.33 | - |
| Block - A | 8 | 1 BHK | 4 | 28.81 | - |
| Block - A | 8 | 1 BHK | 8 | 31.42 | - |
| Block - A | 8 | 1 BHK | 6 | 32.65 | - |
| Block - A | 9 | 1 BHK | 3 | 24.36 | - |
| Block - A | 9 | 1 BHK | 2 | 25.33 | - |
| Block - A | 9 | 1 BHK | 4 | 28.81 | - |
| Block - A | 9 | 1 BHK | 8 | 31.42 | - |
| Block - A | 9 | 1 BHK | 6 | 32.65 | - |
| Block - A | 3 | OTHER | 0 | 0 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Covered by temporary sheets on the point given by the patwari. |
| Boundary Wall | 7ft height boundary wall of RCC wall /column and brick work as per drawings |
| Road Work | Cement Concrete Road over the subbase 200mm thick GSB + 2 layer of WBM. |
| Footpaths | 75mm high from the road level with cc interlocking tiles over the subbase of 100 mm thick P.C.C and 50 mm |
| Water Supply Including Drinking Water Facilities | water connection for the domestic uses will be Provided by the Ghaziabad Development Authority and Storage will be done in under ground water tank of the capacity as per the norms. |
| Sewer System | Main Sewer line has been designed as per norms and pvc pipe of 10 kg pressure will be used in the vertical stags in the shafts,partially sewer line will be lay in basement ceiling and will finally connect to STP. |
| Drain | Underground pipeline drain will be lay in slope as per norms and collecting chambers as per the norms will be provide to collect the surface rain water. |
| Parks | soft Landscape will be done in the park with sufficient electrical lighting |
| Tree Planting | Tree Plantation of the different variable of tree as per the site conditions are planned by follows the authority guidelines |
| Design For Electric Supply Including Street Lighting | M.S street light Designer poles with energy saving LED lighting fixtures will be use. Partially light will be operated from the solar panel which will installed on the terrace. |
| Community Buildings | not applicable |
| Treatment and Disposal System of Sewage and Sullage water | STP will be installed at basement for treated the Sewer and treated water will be recycled for use in flushing and gardeining. |
| Solid Waste Management And Disposal System | will be done by the external vendors by collecting the garbage from the dustbin/shops and segreggate the same for the recycling the dry waste and prepare the compost from the wet waste. |
| Water Conservation System | rain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area |
| Energy Management System Including Use of Renewable Energy | Solar panel will be installed on the terrace for the conservation of the electricity as per the norms of MOE. |
| Fire Protection And Fire Safety System | System will be provide as per the fire department guidelines by fullfil the fire norms as per the NBC. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | not applicable |
| Emergency Evacuation Services | separate fire stair case is designed for evacuation service in the building |
| Other Miscellaneous Work | as per the requirement on period of time. |
Bank Details
| Bank Name | HDFC Bank Ltd. |
| Branch | RDC, Ghaziabad |
| Branch Address | D-44, RDC, Ghaziabad |
| Account Holder | GARG REALTECH PVT LTD COLLECTION A/C GCW |
| Account Number | 50200058555221 |
| IFSC Code | HDFC0000153 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





