KAILASHA ESTATE
BABA CONSTRUCTION PRIVATE LIMITED
Ghaziabad, Uttar Pradesh
Approved
18th Jan 2025
Pending
15th Jan 2030
Registration No.
UPRERAPRJ904686/03/2025
Project Type
Residential
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ904686/03/2025 |
| Project Status | New |
| Project Category | Residential |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2025-01-18 |
| Completion Date | 2030-01-15 |
| Total Area (sqm) | 5330 |
| Project Cost (Lacs) | 12167 |
| Duration (Months) | 60 |
| Registration Fee | 32000 |
Promoter Details
| Promoter Name | BABA CONSTRUCTION PRIVATE LIMITED |
| Promoter ID | UPRERAPRM263781 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | Gaurav Singla |
| Contractor | Baba Infra Solutions LLP |
| Structural Engineer | Rabi Akhtar |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 1069 | 12712 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Kailasha Estate | 1 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 1 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 2 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 2 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 3 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 3 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 4 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 4 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 5 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 5 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 6 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 6 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 7 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 7 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 8 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 8 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 9 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 9 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 10 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 10 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 11 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 11 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 12 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 12 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 13 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 13 | 3 BHK | 4 | 136.23 | - |
| Kailasha Estate | 14 | 3 BHK | 4 | 132.55 | - |
| Kailasha Estate | 14 | 3 BHK | 4 | 136.23 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | We have one plot of size 5330 sq. mtr. having 1 main entrance gate from the 45 m wide front road. 58.07m(NW), 88.0m(NE), 59.84m (SE), 47.08m(SW) |
| Boundary Wall | Brick Work Of Height (7Ft) Consisting Of Rcc Work In Column And Beam for boundary wall. |
| Road Work | All Internal Roads of project are 6Mtr Wide And Will Be Of Bitumen/Rcc. |
| Footpaths | 150Mm High From Road Level With Interlocking Tiles And Curb Stone for footpath in project. |
| Water Supply Including Drinking Water Facilities | For Water supply including drinking water, Facilities will be used from borewell |
| Sewer System | All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system when come into force. |
| Drain | Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line. |
| Parks | Hard and soft landscape is done in park area with electrical lighting and sitting area. |
| Tree Planting | Different variables of trees are planted as per site conditions in the project. |
| Design For Electric Supply Including Street Lighting | Street light is directly operated but solar panel installed on top floor of the building |
| Community Buildings | Community halls & Dining hall is provided on the ground floor of the building. |
| Treatment and Disposal System of Sewage and Sullage water | All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system when come into force. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management. |
| Water Conservation System | Rain water harvesting pit is given in open area for terrace water and site water for water conservation. |
| Energy Management System Including Use of Renewable Energy | Solar Plant Will Be Installed On Top For Conservation Of Electricity and energy management. |
| Fire Protection And Fire Safety System | Fire Equipments And Fire Fixtures Will Be Done As Per Fire Fighting Norms And As Per Fire Noc |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not applicable. |
| Emergency Evacuation Services | We Will Have Staircases Which Will Be Provided With Emergency Exit Doors And Emergency Exit Gates for emergency evacuation services. |
| Other Miscellaneous Work | As Per Requirements On Period Of Time |
Bank Details
| Bank Name | HDFC Bank Ltd |
| Branch | Ghaziabad-Vaishali |
| Branch Address | VC-1, Sec-1, Vaishali, Ghazaibad, UP |
| Account Holder | BCPL Collection A/c for Kailasha Estate |
| Account Number | 50200106233681 |
| IFSC Code | HDFC0000422 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





