OFFICER CITY-2 (PHASE-1)
MR Proview Realtech Private Limited
Ghaziabad, Uttar Pradesh
Approved
21st Dec 2011
Completed
25th Sept 2020
Registration No.
UPRERAPRJ6085
Project Type
Residential
District
Ghaziabad
Taluka
Modinagar
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ6085 |
| Project Status | Completed |
| Project Category | Residential |
| District | Ghaziabad |
| Taluka | Modinagar |
| Start Date | 2011-12-21 |
| Completion Date | 2020-09-25 |
| Total Area (sqm) | 9282 |
| Project Cost (Lacs) | 7200 |
| Duration (Months) | 106 |
| Registration Fee | 51500 |
Promoter Details
| Promoter Name | MR Proview Realtech Private Limited |
| Promoter ID | UPRERAPRM12058 |
| Mobile | 99******** |
Project Team
| role | name |
|---|---|
| Architect | ANUJ AGARWAL |
| Structural Engineer | SADANAND OJHA |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| A | GF | 3 BHK | 8 | 74.54 | 0 |
| A | 1 | 3 BHK | 8 | 74.54 | - |
| A | 2 | 3 BHK | 8 | 74.54 | - |
| A | 3 | 3 BHK | 8 | 74.54 | - |
| A | 4 | 3 BHK | 8 | 74.54 | - |
| A | 5 | 3 BHK | 8 | 74.54 | - |
| A | 6 | 3 BHK | 8 | 74.54 | - |
| A | 7 | 3 BHK | 8 | 74.54 | - |
| A | 8 | 3 BHK | 8 | 74.54 | - |
| A | 9 | 3 BHK | 8 | 74.54 | - |
| A | 10 | 3 BHK | 8 | 74.54 | - |
| A | 11 | 3 BHK | 8 | 74.54 | - |
| A | 12 | 3 BHK | 8 | 74.54 | - |
| A | 13 | 3 BHK | 8 | 74.54 | - |
| A | 14 | 3 BHK | 8 | 74.54 | - |
| B | GF | 3 BHK | 8 | 65.34 | 0 |
| B | 1 | 3 BHK | 8 | 65.34 | - |
| B | 2 | 3 BHK | 8 | 65.34 | - |
| B | 3 | 3 BHK | 8 | 65.34 | - |
| B | 4 | 3 BHK | 8 | 65.34 | - |
| B | 5 | 3 BHK | 8 | 65.34 | - |
| B | 6 | 3 BHK | 8 | 65.34 | - |
| B | 7 | 3 BHK | 8 | 65.34 | - |
| B | 8 | 3 BHK | 8 | 65.34 | - |
| B | 9 | 3 BHK | 8 | 65.34 | - |
| B | 10 | 3 BHK | 8 | 65.34 | - |
| B | 11 | 3 BHK | 8 | 65.34 | - |
| B | 12 | 3 BHK | 8 | 65.34 | - |
| B | 13 | 3 BHK | 8 | 65.34 | - |
| B | 14 | 3 BHK | 8 | 65.34 | - |
| C | GF | 2 BHK | 8 | 59.28 | 0 |
| C | 1 | 2 BHK | 8 | 59.28 | - |
| C | 2 | 2 BHK | 8 | 59.28 | - |
| C | 3 | 2 BHK | 8 | 59.28 | - |
| C | 4 | 2 BHK | 8 | 59.28 | - |
| C | 5 | 2 BHK | 8 | 59.28 | - |
| C | 6 | 2 BHK | 8 | 59.28 | - |
| C | 7 | 2 BHK | 8 | 59.28 | - |
| C | 8 | 2 BHK | 8 | 59.28 | - |
| C | 9 | 2 BHK | 8 | 59.28 | - |
| C | 10 | 2 BHK | 8 | 59.28 | - |
| C | 11 | 2 BHK | 8 | 59.28 | - |
| C | 12 | 2 BHK | 8 | 59.28 | - |
| C | 13 | 2 BHK | 8 | 59.28 | - |
| C | 14 | 2 BHK | 8 | 59.28 | - |
| D | GF | 2 BHK | 6 | 45.69 | 0 |
| D | 1 | 2 BHK | 6 | 45.69 | - |
| D | 2 | 2 BHK | 6 | 45.69 | - |
| D | 3 | 2 BHK | 6 | 45.69 | - |
| D | 4 | 2 BHK | 6 | 45.69 | - |
| D | 5 | 2 BHK | 6 | 45.69 | - |
| D | 6 | 2 BHK | 6 | 45.69 | - |
| D | 7 | 2 BHK | 6 | 45.69 | - |
| D | 8 | 2 BHK | 6 | 45.69 | - |
| D | 9 | 2 BHK | 6 | 45.69 | - |
| D | 10 | 2 BHK | 6 | 45.69 | - |
| D | 11 | 2 BHK | 6 | 45.69 | - |
| D | 12 | 2 BHK | 6 | 45.69 | - |
| D | 13 | 2 BHK | 6 | 45.69 | - |
| D | 14 | 2 BHK | 6 | 45.69 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Private- Free Hold Land, Demarcation was already done before starting the project |
| Boundary Wall | Boundary wall on RCC Tie, Beam on RCC Footing |
| Road Work | Cements Concrete Internal Roads( CC Roads above to Layers of WBM |
| Footpaths | Interlocking Tile on PCC on competed surface |
| Water Supply Including Drinking Water Facilities | To be provided by Ghaziabad Development Authority and stores will be done underground water tanks |
| Sewer System | Main Sewer line has been design as per norm and partially led in basement ceiling and will finally connect to sewer line/ STP |
| Drain | Under ground Drain pipe with chamber |
| Parks | Landscape and park has been designed as per authority guide lines |
| Tree Planting | Tree panting has been design as per Authority Guide lines |
| Design For Electric Supply Including Street Lighting | Design has been done as per Up electricity Board Guide lines |
| Community Buildings | Club has been Design as per Authority Norms and facility like party hall gaming zone Entertainment area gym etc. |
| Treatment and Disposal System of Sewage and Sullage water | Sewage will be treated for recycling ( if required ) other wise it will be connected two sewage line of Authority which is already connected to central functional STP of GDA For this locality. |
| Solid Waste Management And Disposal System | Door to Door Collection and will be treated by waste disposal management. |
| Water Conservation System | Recycling of Treated water and rain water harvesting system to be provided. |
| Energy Management System Including Use of Renewable Energy | Solar panel will be provided as per norms as suitable Places |
| Fire Protection And Fire Safety System | Fire System is being executed per the norm of department of fire. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Nursary School in the premises |
| Emergency Evacuation Services | Provision of exit sign and emergency light. |
| Other Miscellaneous Work | N/A |
Bank Details
| Bank Name | AXIS BANK LTD. |
| Branch | AXIS BANK LTD. GROUND FLOOR, OFFICE NO-1, TOWER A, PLOT NO-41 THE CORRENTHUM, SECTOR-62, NOIDA |
| Branch Address | GROUND FLOOR, OFFICE NO-1, TOWER A, PLOT NO-41 THE CORRENTHUM, SECTOR-62, NOIDA |
| Account Holder | MR PROVIEW REALTECH PVT. LTD. |
| Account Number | 919020025518330 |
| IFSC Code | UTIB0000723 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow