PALM DRIVE COMMERCIAL WEST
Kirtimaan Constructions Private Limited
Ghaziabad, Uttar Pradesh
Approved
15th Nov 2020
Completed
31st Dec 2023
Registration No.
UPRERAPRJ192018
Project Type
Commercial
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ192018 |
| Project Status | Completed |
| Project Category | Commercial |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2020-11-15 |
| Completion Date | 2023-12-31 |
| Total Area (sqm) | 242 |
| Project Cost (Lacs) | 155 |
| Duration (Months) | 38 |
| Registration Fee | 4840 |
Promoter Details
| Promoter Name | Kirtimaan Constructions Private Limited |
| Promoter ID | UPRERAPRM129522 |
| Mobile | 78******** |
Project Team
| role | name |
|---|---|
| Architect | Anuj Agarwal |
| Contractor | GR Enterprises |
| Structural Engineer | Keen Associates Private Limited |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | Plot No. C-2, BEARING PART OF KHASRA NO. 1218M, 1219M, 1228M, 1229 AT VILLAGE NOOR NAGAR, GHAZIABAD | 242.03 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| C-2 | BSMNT3 | SHOP | 1 | 17.44 | - |
| C-2 | BSMNT3 | SHOP | 1 | 16.81 | - |
| C-2 | BSMNT3 | SHOP | 1 | 15.85 | - |
| C-2 | GF | SHOP | 1 | 10.8 | 0 |
| C-2 | GF | SHOP | 1 | 14.47 | 0 |
| C-2 | GF | SHOP | 1 | 16.64 | 0 |
| C-2 | GF | SHOP | 1 | 15.81 | 0 |
| C-2 | 1 | SHOP | 1 | 10.8 | - |
| C-2 | 1 | SHOP | 1 | 14.47 | - |
| C-2 | 1 | SHOP | 1 | 16.64 | - |
| C-2 | 1 | SHOP | 1 | 13.18 | - |
| C-2 | 2 | SHOP | 1 | 10.8 | - |
| C-2 | 2 | SHOP | 1 | 14.47 | - |
| C-2 | 2 | SHOP | 1 | 16.64 | - |
| C-2 | 2 | SHOP | 1 | 13.18 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Demarcation of Plot already done as it a plot/ part of approved layout/plotted development "Palm Drive". |
| Boundary Wall | RCC pillar with 230 mm thick exposed Brick Wall of height 1 mt. |
| Road Work | Front approach road work done as it is a plot/part of approved layout/plotted development "Palm Drive" |
| Footpaths | Cement, concrete Interlocking Pavers laid on PCC bed. |
| Water Supply Including Drinking Water Facilities | Water Supply will be provided from the main supply of approved layout/plotted development "Palm Drive", internal/in building provisions of water supply/drinking water has been done. |
| Sewer System | The sewer system will be connected to the main sewer systems of approved layout/plotted development of "Palm Drive", internal/in building provision of sewer system has been done. |
| Drain | Open saucer drain is provided in set back area and connected to the drainage system of approved layout/plotted development "Palm Drive" |
| Parks | Provisions of the required park as per norms has been already done in approved layout/plotted development "Palm Drive" |
| Tree Planting | 3 nos. of trees as per approved map of GDA. |
| Design For Electric Supply Including Street Lighting | Provisions of electric supply and street lighting have been done as per norms and main electricity will be distributed from ESS of approved layout/plotted development "Palm Drive". |
| Community Buildings | Provision of required community building as per norms has been already done in approved layout/plotted development "Palm Drive" |
| Treatment and Disposal System of Sewage and Sullage water | Provisions of required STP as per norms have been already done in approved layout/plotted development "Palm Drive", the disposal of sewerage will be done in sewer line of layout. |
| Solid Waste Management And Disposal System | Provisions of required solid waste management as per norms has been already done in the approved layout/plotted development "Palm Drive", the solid waste generated from this building will be collected/treated as the solid system of the layout. |
| Water Conservation System | Provisions of water harvesting as per norms have been already done in the approved layout/plotted development "Palm Drive". The terrace water of the building will be connected to the water harvesting line of the layout. |
| Energy Management System Including Use of Renewable Energy | Provisions of energy management system as per norms has been done in approved layout/plotted development "Palm Drive" |
| Fire Protection And Fire Safety System | Provisions of the Fire Fighting System will be done as per NOC from Fire Department. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Provisions of Social Infrstrauture and other public amenities have been incorporated in the approved layout/plotted development "Palm Drive". Provision of public toilet has been done. |
| Emergency Evacuation Services | As the height of the building is below 15 mt. and the covered area of 1 floor is less than 500 sq. mt., there is no requirement for an emergency evacuation system. Moreover provision of 1.5 mt. and a wide ventilated staircase and 1 side open corridor are provided. |
| Other Miscellaneous Work | No other misc. work is pending and if GDA/other competent department asks for some other works as per the amended govt. norms (before completion), it will be incorporated in development work |
Bank Details
| Bank Name | ICICI BANK |
| Branch | NOIDA SECTOR THIRTY UTTAR PRADESH |
| Branch Address | Shop No. 18,19,21 and 22, Kirtimaan Plaza, Sector-30 Noida, UP-201307 |
| Account Holder | KIRTIMAAN CONSTRUCTIONS PRIVATE LIMITED PALM DRIVE COMMERCIAL WEST RERA DESIGNATED ACCOUNT |
| Account Number | 157705002485 |
| IFSC Code | ICIC0001577 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate