PRABHAT HEIGHTS
FOREVER INFRASTRUCTURE PRIVATE LIMITED
Ghaziabad, Uttar Pradesh
Approved
15th Aug 2023
Completed
30th Dec 2024
Registration No.
UPRERAPRJ471476
Project Type
Residential
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ471476 |
| Project Status | Completed |
| Project Category | Residential |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2023-08-15 |
| Completion Date | 2024-12-30 |
| Total Area (sqm) | 2850 |
| Project Cost (Lacs) | 2922.95 |
| Duration (Months) | 17 |
| Registration Fee | 19500 |
Promoter Details
| Promoter Name | FOREVER INFRASTRUCTURE PRIVATE LIMITED |
| Promoter ID | UPRERAPRM182517 |
| Mobile | 97******** |
Project Team
| role | name |
|---|---|
| Architect | RAHUL GUPTA |
| Contractor | MR. UPENDER TYAGI MS. BHARDWAJ CONSTRUCTION CO. ((8586927501)) |
| Structural Engineer | BUILTECH SERVICES INC (JITENDER KUMAR (9899005606)) |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | H1 | 2850 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| A(BLOCK H1) | 1 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 2 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 3 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 4 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 5 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 6 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 7 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 8 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 9 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 10 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 11 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 12 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 13 | 3 BHK | 3 | 92.29 | - |
| A(BLOCK H1) | 14 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 1 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 2 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 3 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 4 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 5 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 6 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 7 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 8 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 9 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 10 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 11 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 12 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 13 | 3 BHK | 3 | 92.29 | - |
| B(BLOCK H1) | 14 | 3 BHK | 3 | 92.29 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | EAST SIDE - 73.86M, WEST SIDE - 68.05M, NORTH SIDE - 43.80M, SOUTH SIDE - 30.6M |
| Boundary Wall | RCC COLUMN AND BEAM STR. WITH BRICK WORK MS RAILING (150 MM RCC OR 230 MM BRICK WORK) |
| Road Work | CEMENT CONCRETE/ CONCRETE PAVERS WITH AVERAGE THICKNESS OF 100MM |
| Footpaths | CEMENT CONCRETE/ANY OTHER MATERIAL/ CONCRETE PAVERS WITH 60 - 80 MM THICKNESS |
| Water Supply Including Drinking Water Facilities | UNDERGROUND AND OVERHEAD WATER TANKS ARE PROVIDED AND CONNECTION TO EACH AND EVERY TOILET AND KITCHEN |
| Sewer System | WELL - LAID INTERCONNECTED SEWER LINES WILL BE PROVIDED WHICH ARE FURTHER CONNECTED TO THE SEWER LINE LAID BY THE CROSSING REPUBLIK FURTHER TREATMENT IN THE STP LOCATED IN CROSSING REPUBLIK GHAZIABAD |
| Drain | DRAINAGE SYSTEM WILL BE PROVIDED ON THE BASIS OF COMPLIANCE OF NBC WITH CALCULATION OF DISCHARGE |
| Parks | NA |
| Tree Planting | TREE PLANTATIONS WITH EVERGREEN AND SEASONAL CATEGORY |
| Design For Electric Supply Including Street Lighting | ELECTRICAL SUPPLY SYSTEM WILL BE PROVIDED ACCORDING TO THE ELECTRICAL LOAD CALCULATION ON THE DATA PROVIDED BY THE SUB METERING SYSTEM WHERE THE CONNECTION SHOULD BE PROVIDED BY THE COMPANY TO THE FLAT OWNER AT THE TIME OF COMPLETION. |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | SEWAGE AND SULLAGE SHALL BE DISCHARGED TO THE STP PROVIDED BY CROSSING REPUBLIK IN CROSSING REPUBLIK |
| Solid Waste Management And Disposal System | CROSSING REPUBLIC WILL PROVIDE THE MANAGEMENT AND WASTE DISPOSAL |
| Water Conservation System | LOW FLOW WATER FIXTURE ARE USED AND RAIN WATER HARVESTING |
| Energy Management System Including Use of Renewable Energy | NA |
| Fire Protection And Fire Safety System | FIRE FIGHTING SYSTEM AND PROTECTION SYSTEM WILL BE PROVIDED AS PER NBC AND NOC FROM UP FIRE SERVICE. INSTALLATION OF SPRINKLES SHALL BE DONE IN BASEMENTS ONLY. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | FIRE TENDER ROAD AND FIRE ESCAPE STAIRCASE WILL BE PROVIDED |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | ICICI BANK |
| Branch | VAISHALI |
| Branch Address | ICICI Bank Ltd, Shop no 4, Plot no 18, Ajnara Landmark, Sec 4, Vaishali, Ghaziabad, UP- 201010 |
| Account Holder | FOREVER INFRASTRUCTURE PRIVATE LIMITED COLLECTION ACCOUNT FOR PRABHAT HEIGHTS |
| Account Number | 777705125401 |
| IFSC Code | ICIC0001254 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in