THE ELEMENT - PHASE -I

IN INFRAESTATES LLP

Ghaziabad, Uttar Pradesh

RERA approved

Approved

1st Oct 2023

Completion pending

Pending

31st Mar 2028

Registration No.

UPRERAPRJ443457

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ443457
Project StatusNew
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2023-10-01
Completion Date2028-03-31
Total Area (sqm)3109
Project Cost (Lacs)18185
Duration (Months)54
Registration Fee21000

Promoter Details

Promoter NameIN INFRAESTATES LLP
Promoter IDUPRERAPRM243691
Mobile97********

Project Team

rolename
ArchitectANSHU SINGH
ContractorIN INFRAESTAES LLP
Structural EngineerDR. GYAN SINGH

Land Details

typekhasra_or_plot_noarea_sqmt
PlotGH-1/1, SECTOR-11, PRATAP VIHAR, GHAZIABAD6217.80

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Aura13 BHK4108.654-
Aura23 BHK4108.654-
Aura33 BHK4108.654-
Aura43 BHK4108.654-
Aura53 BHK4108.654-
Aura63 BHK4108.654-
Aura73 BHK4108.654-
Aura83 BHK4108.654-
Aura93 BHK4108.654-
Aura103 BHK4108.654-
Aura113 BHK4108.654-
Aura123 BHK4108.654-
Aura133 BHK4108.654-
Aura143 BHK4108.654-
Aura153 BHK4108.654-
Aura163 BHK4108.654-
Aura173 BHK4108.654-
Aura183 BHK4108.654-
Aura193 BHK4108.654-
Aura203 BHK4108.654-
Aura213 BHK4108.654-
Aura223 BHK4108.654-
Aura233 BHK4108.654-
Aura243 BHK4108.654-
Aura253 BHK4108.654-
Aura263 BHK4108.654-
Aura273 BHK4108.654-
Aura283 BHK4108.654-

Development Works

work_namedescription
Demarcation of PlotsProject "THE ELEMENT" PHASE -1 (3108.90 Sq. Mtr) , the total plot area 6217.80 sq. mtr. on plot no. GH-1/1, Sector-11, Pratap Vihar, Ghaziabad UP allotted by Ghaziabad Development Authority (GDA). The demarcation of plot is already done by the GDA officials and handed over to owner.
Boundary WallRCC plinth Beam, brickwork and MS Railing, as per approved plan of GDA
Road WorkRCC road with top finish with trimix/interlocking blocks road with intermittent tile/ stone paving
FootpathsPavers/stone tiles will be used in foothpaths
Water Supply Including Drinking Water FacilitiesThe water supply to be provided by the competent authority at single point in plot, thereafter the further internal development and distribution in flats/units will be done by the developer
Sewer SystemRCC hume pipe with manhole, chambers and collection chambers and connections
DrainRCC hume pipe with manhole open drain with concrete perforated cover chamber, collection chamber with rain water harvesting.
ParksYes landscape with civil work with masonry and stone, horticulture work and various type of plantation, shrubs
Tree PlantingYes, tree planting along some parts of the road and park in the project, planned and develop as per approved plan of GDA
Design For Electric Supply Including Street LightingYes, pole light will be provided along with internal road side
Community BuildingsWill be develop as per approved plan of GDA will all basis facilities as required
Treatment and Disposal System of Sewage and Sullage waterTreatment and disposal system of sewage and sullage water through by STP, proposed and planned to develop in project
Solid Waste Management And Disposal SystemYes organic waste converter and collection bins will be provided under project as per concern authorities and norms
Water Conservation SystemWater conservation system adequate number provided, as per approved plan by GDA
Energy Management System Including Use of Renewable EnergyAs per requirement for energy management system provision taken in project for efficient use of energy
Fire Protection And Fire Safety SystemFire NOC received and attached, all fire equipment and provisions will be provided as per NOC approved by UP Fire Department
Social Infrastructure And Other Public Amenities Including Public Health ServicesWill agree to provide in project social infrastructure and other public aminities including public health services, as per gove policies and regulations
Emergency Evacuation ServicesAs per GDA approved plan, will be provided
Other Miscellaneous WorkNA

Bank Details

Bank NameINDIAN BANK
BranchINDIAN BANK VASUNDHARA
Branch AddressC-40, TEN TOWER SECTOR-15, VASUNDHARA GHAZIABAD
Account HolderIN INFRAESTATES LLP THE ELEMENT COLLECTION ACCOUNT
Account Number7546904448
IFSC CodeIDIB000V118

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy