New Launch - India Real Estate Report 2026.

UCHDPL-ELIGO

Uppal Chadha Hi-Tech Developers Pvt. Ltd.

Ghaziabad, Uttar Pradesh

RERA approved

Approved

1st Jul 2022

Completion pending

Pending

22nd Mar 2027

Registration No.

UPRERAPRJ422981

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ422981
Project StatusNew
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2022-07-01
Completion Date2027-03-22
Total Area (sqm)17089
Project Cost (Lacs)25242
Duration (Months)57
Registration Fee90500

Promoter Details

Promoter NameUppal Chadha Hi-Tech Developers Pvt. Ltd.
Promoter IDUPRERAPRM5538
Mobile72********

Project Team

rolename
ArchitectNiraj Kumar Nanda
ContractorJugindra Singh Parihar
Structural EngineerDr. Rajeev Dua

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra381576.57
Khasra3822633.06
Khasra383162.26
Khasra383867.73
Khasra38712.60
Khasra3905071.64
Khasra3911749.62
Khasra3925885.28
Khasra39388.85
Khasra41134.14
Khasra4128.00

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower-FGFOTHER000
Tower-F13 BHK493.5-
Tower-F13 BHK493.5-
Tower-F23 BHK493.5-
Tower-F23 BHK493.5-
Tower-F33 BHK493.5-
Tower-F33 BHK493.5-
Tower-F43 BHK493.5-
Tower-F43 BHK493.5-
Tower-F53 BHK493.5-
Tower-F53 BHK493.5-
Tower-F63 BHK493.5-
Tower-F63 BHK493.5-
Tower-F73 BHK493.5-
Tower-F73 BHK493.5-
Tower-F83 BHK493.5-
Tower-F83 BHK493.5-
Tower-GGFOTHER000
Tower-G13 BHK493.5-
Tower-G13 BHK893.5-
Tower-G23 BHK493.5-
Tower-G23 BHK893.5-
Tower-G33 BHK493.5-
Tower-G33 BHK893.5-
Tower-G43 BHK493.5-
Tower-G43 BHK893.5-
Tower-G53 BHK493.5-
Tower-G53 BHK893.5-
Tower-G63 BHK493.5-
Tower-G63 BHK893.5-
Tower-G73 BHK493.5-
Tower-G73 BHK893.5-
Tower-G83 BHK493.5-
Tower-G83 BHK893.5-
Tower-HGFOTHER000
Tower-H13 BHK493.5-
Tower-H13 BHK2493.5-
Tower-H23 BHK493.5-
Tower-H23 BHK2493.5-
Tower-H33 BHK493.5-
Tower-H33 BHK2493.5-
Tower-H43 BHK493.5-
Tower-H43 BHK2493.5-
Tower-H53 BHK493.5-
Tower-H53 BHK2493.5-
Tower-H63 BHK493.5-
Tower-H63 BHK2493.5-
Tower-H73 BHK493.5-
Tower-H73 BHK2493.5-
Tower-H83 BHK493.5-
Tower-H83 BHK2493.5-

Development Works

work_namedescription
Demarcation of PlotsPlots demarcated as per Approved layout of building plan.
Boundary WallBoundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m
Road WorkWidth (m) Width of Carriage way (m) Width of Footpath (m) GSB (mm) WMM (mm) Interlocking tiles over sand bed (mm) 11.5 6 - 150 100 65 12.0 12 - 150 100 65 13.0 7.5 - 150 100 65 14.5 9.0 - 150 100 65
FootpathsWidth (m) Width of Footpath (m) GSB (mm) Interlocking and tiles over sand bed (mm) 11.5 - - - 12.0 - - - 13.0 - - - 14.5 - - -
Water Supply Including Drinking Water FacilitiesThe water supply system planned to provide 24 x 7 water supply. HDPE pipe PN-8, PE-80 for water supply network RCC storage tank s (4x65 KL UGT) 2 Nos. Tube-wells
Sewer SystemRCC pipe class NP2 has been proposed Manhole/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500mm
DrainRCC pipe class NP2 has been used Manhole/Chambers made with Brick Masonry in Conical shape with dia 900mm
ParksWire fencing along boundary, Grassing and tree Plantation
Tree PlantingOne Tree on one side of 9m road and 7.5m road Both side trees on 12m and 18m road
Design For Electric Supply Including Street LightingCompact substation 1 x 2000 KVA and 1 x 630 KVA 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and single arm bracket Street light poles with 55 watt Cast Iron LED fixture. Feeder panels-6 way, 8 way and 12 way.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage water250 KLD STP with MBBR Technology is planned within the premise.
Solid Waste Management And Disposal SystemDoor to Door Collection shall be ensured from each household. Segregation waste treatment facility at Sec-6. Organic waste in composed with the help of Automatic organic waste converter machine.
Water Conservation System2 Nos. Modular type rain water harvesting pits panned in green areas of the proposed development.
Energy Management System Including Use of Renewable EnergyUse of LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC. Installation solar PV cells as required capacity synched with power supply grid are being proposed to meet requirements of EIA Authorities. Energy Metering to regulate the usage of electricity. Efficient equipments like motors, pumps ACs Lifts, etc. Zero use of Hydro-chlorofluorocarbon (HCFC) refrigerants in (HVAC) equipment and Unitary Air-Conditioners installed in the building(s). Use of halon free fire suppression equipment.
Fire Protection And Fire Safety SystemFire staircase and FHC, is planned at each tower and floor as per NBC requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA.
Emergency Evacuation ServicesFire staircase Planned as per NBC requirement.
Other Miscellaneous WorkNA.

Bank Details

Bank NameYES BANK
BranchYES BANK, RAJNAGAR DIST, CENTRE, GHAZIABAD
Branch AddressRAJNAGAR DIST, CENTRE GHAZIABAD
Account HolderUCHDPL COLLECTION ACCOUNT FOR ELIGO
Account Number003872500000402
IFSC CodeYESB0000038

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy