UCHDPL-VERIDIA-3-OAKWOOD ENCLAVE

Uppal Chadha Hi-Tech Developers Pvt. Ltd.

Ghaziabad, Uttar Pradesh

RERA approved

Approved

15th Apr 2022

Project completed

Completed

14th Oct 2025

Registration No.

UPRERAPRJ243850

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ243850
Project StatusCompleted
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2022-04-15
Completion Date2025-10-14
Total Area (sqm)11749
Project Cost (Lacs)10048
Duration (Months)42
Registration Fee64000

Promoter Details

Promoter NameUppal Chadha Hi-Tech Developers Pvt. Ltd.
Promoter IDUPRERAPRM5538
Mobile72********

Project Team

rolename
ArchitectNiraj Kumar Nanda
ContractorModern Construction Co. India
Structural EngineerDr. Rajeev Dua

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra109175.39
Khasra2348006.94
Khasra242202.37
Khasra243184.12
Khasra2471686.98
Khasra248789.4
Khasra249270.2
Khasra250218.41
Khasra255214.18
Khasra2571.4

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Tower-314 BHK20155.67-
Tower-324 BHK20155.67-
Tower-334 BHK20155.67-
Tower-344 BHK20155.67-
Tower-355 BHK20216.9-
Tower-365 BHK00-

Development Works

work_namedescription
Demarcation of PlotsPlots Demarcated as per Approved Layout of Building Plan
Boundary WallBoundary Wall Shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m
Road WorkWidth (M). Width of Carriage way (M). GSB (MM). WMM (M). Interlocking tiles over sand bed (M). 7.5 7.5 150 100 65 9 9 150 100 65
FootpathsWidth (M). GSB (MM). Interlocking tiles over sand bed (MM). 7.5 2.5 60 9 75 60
Water Supply Including Drinking Water FacilitiesThe Water supply system planned to provide 24x7 water supply. HDPE pipe PN-8, PE-80 for water supply network. 4x150 KL RCC storage tanks (4x150 KL UGT and 62 KL OHT. 1 Tube-Wells.
Sewer SystemRCC pipes class NP2 has been proposed. Manholes/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500mm.
DrainRCC pipe class NP2 has been used. Manholes/Chambers made with Brick Masonry in Conical shape with dia 900mm.
ParksWire fencing along boundary, Grassing and tree Plantation.
Tree PlantingOne tree on one side of 9m road and 7.5 road. Both side trees on 12m and 18m road.
Design For Electric Supply Including Street LightingCompact substation 2000 KVA - 1nos. 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and single arm bracket Street light poles with 55 watt cast iron LED fixture. Feeder panels-6 way, 8 way and 12way.
Community BuildingsNA.
Treatment and Disposal System of Sewage and Sullage water550 KLD STP with MBBR Technology is planned within the premise.
Solid Waste Management And Disposal SystemDoor to Door Collection shall be ensured from each household. Segregation waste treatment facility at Sec-6. Organic waste is Composted with the help of Automatic organic waste converter machine.
Water Conservation System1Nos. Modular type rain water harvesting pits planned in green areas of the proposed development.
Energy Management System Including Use of Renewable EnergyUse of LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC. Installation solar PV cells as required capacity synched with power supply grid are being proposed to meet requirements of EIA Authorities. Energy Metering to regular the usage of electricity. Efficient equipment like motors, pumps, Ac"s, Lift, etc, Zero use of Hydro-chlorofluorocarbon (HCFC) refrigerants in (HVAC) equipment and Unitary Air-Conditioners installed in the building(s). Use of halon free fire suppression equipment.
Fire Protection And Fire Safety SystemFire Staircases and FHC, is planned at each floor as per NBC requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire Staircase Planned as per NBC requirement.
Other Miscellaneous WorkNA

Bank Details

Bank NameYES BANK
BranchRajnagar, Ghaziabad
Branch AddressC-37, RAJNAGAR, GHAZIABAD-201002
Account HolderUCHDPL COLLECTION ACCOUNT FOR VERIDIA 3 OAKWOOD ENCLAVE
Account Number00387250000339
IFSC CodeYESB0000038

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy