UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE
Uppal Chadha Hi-Tech Developers Pvt. Ltd.
Ghaziabad, Uttar Pradesh
Approved
1st Oct 2023
Completed
28th Dec 2025
Registration No.
UPRERAPRJ196239
Project Type
Residential
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ196239 |
| Project Status | Completed |
| Project Category | Residential |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2023-10-01 |
| Completion Date | 2025-12-28 |
| Total Area (sqm) | 15827 |
| Project Cost (Lacs) | 14591 |
| Duration (Months) | 27 |
| Registration Fee | 84500 |
Promoter Details
| Promoter Name | Uppal Chadha Hi-Tech Developers Pvt. Ltd. |
| Promoter ID | UPRERAPRM5538 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Niraj Kumar Nanda |
| Contractor | Modern Construction Co. India |
| Structural Engineer | Dr. Rajeev Dua |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 256 | 1154.11 |
| Khasra | 247 | 921.78 |
| Khasra | 250 | 520 |
| Khasra | 249 | 317 |
| Khasra | 258 | 801.88 |
| Khasra | 259 | 786 |
| Khasra | 260 | 1333.67 |
| Khasra | 243 | 117.90 |
| Khasra | 242 | 23.78 |
| Khasra | 251 | 1463.14 |
| Khasra | 252 | 1548.37 |
| Khasra | 246 | 1647.51 |
| Khasra | 254 | 836.88 |
| Khasra | 263 | 143.68 |
| Khasra | 265 | 2761.99 |
| Khasra | 253 | 1449.31 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| TOWER-6 | 1 | 4 BHK | 28 | 155.61 | - |
| TOWER-6 | 2 | 4 BHK | 28 | 155.61 | - |
| TOWER-6 | 3 | 4 BHK | 28 | 155.61 | - |
| TOWER-6 | 4 | 4 BHK | 28 | 155.61 | - |
| TOWER-6 | 5 | 5 BHK | 28 | 216.83 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plots Demarcated as per Approved layout of Building Plan. |
| Boundary Wall | Boundary wall shall be made with standard Fly ash Brick and MS Grill with thickness of 230mm and height 1.8m |
| Road Work | Width (M) Width of Carriage way (M) GSB(MM) WMM(MM) Interlocking Tiles over sand Bed(MM) 9.0 9.0 150 100 65 12.0 12.0 150 100 65 Note - Cross sections are enclosed as Annexure |
| Footpaths | Width(M) GSB(MM) Interlocking tiles Over sand Bed (MM) 9.0 2.5 60 12.0 75 60 |
| Water Supply Including Drinking Water Facilities | 1.) The Water Supply system planned to provide 24 X 7 Water Supply. 2.) HDPE Pipe PN-8, PE-80, For Water Supply network 3.) 4 X 105KL RCC Storage Tanks ( 4 X 105 KL UGT) 4.) 1 Tube- Wells |
| Sewer System | 1.) RCC Pipe Class NP2 has been Proposed 2.) Manholes / Chambers made with Masonry in Conical Shape ranging from dia 900 to 1500 mm |
| Drain | 1.) RCC Pipe class NP2 has been used 2.) Manholes/ Chambers made with Masonry in Conical Shape with dia 900 mm |
| Parks | Not applicable |
| Tree Planting | 1.) One tree On One side of 9 m road and 7.5 road 2.) Both side Trees on 12m and 18m road |
| Design For Electric Supply Including Street Lighting | 1.) Compact Substation 2000 KVA -1 Nos 2.) 5m Cast Iron Pole with GI ribbed/Grooved extrusion and single arm bracket street light poles with 50 watt cast Iron LED Fixtures 3.) Feeder Panels-6 way, 8 way ,and 12 way |
| Community Buildings | NA |
| Treatment and Disposal System of Sewage and Sullage water | 550 KLD STP with MBBR Technology is planned within the premise. |
| Solid Waste Management And Disposal System | 1.) Door to Door collection shall be ensured from each household. 2.) Segregation waste treatment facility at sector -6 3.) Organic Waste is composted with the help of automatic organic waste converter machine. |
| Water Conservation System | 1 nos. Modular Type rain water harvesting pits planned in green areas of the proposed development |
| Energy Management System Including Use of Renewable Energy | 1.) Use of LED Lights with Lower LPD"s (Lighting Power Density) when compared to baseline set by ECBC 2.) Installation Sloar PV Cells as required capacity Synched with power supply Internal Grid are being Proposed To meet requirements of EIA Authorities. 3.)Energy Metering To Regulate the usage of electricity 4.)Efficient Equipment like Motors, Pumps, Ac"s, Lifts etc. 5.)Zero use of Hydro-Chlorofluorocarbon(HCFC) refrigerants in (HVAC) equipment and Unitary Air- conditioner Installed in the Buildings. 6.) Use of Halon Free fire suppression equipment |
| Fire Protection And Fire Safety System | Fire Staircases and FHC, is planned at each floor as per NBC requirements |
| Social Infrastructure And Other Public Amenities Including Public Health Services | NA |
| Emergency Evacuation Services | Fire Staircase planned as per NBC Requiremnets |
| Other Miscellaneous Work | NA |
Bank Details
| Bank Name | AXIS BANK LTD. |
| Branch | AXIS BANK LTD, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD |
| Branch Address | PLOT NO. 3, N-30, AMBEDKAR ROAD, NEHRU NAGAR,GHAZIABAD-201001-UP |
| Account Holder | UCHDPL COLLECTION ACCOUNT FOR VERIDIA 6 OAKWOOD ENCLAVE |
| Account Number | 923020044725237 |
| IFSC Code | UTIB0000095 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate





