New Launch - India Real Estate Report 2026.

Umesh Park Phase-1

Modi Industries Limited

Ghaziabad, Uttar Pradesh

RERA approved

Approved

1st Jan 2024

Completion pending

Pending

23rd May 2028

Registration No.

UPRERAPRJ821313/02/2024

Project Type

Residential

District

Ghaziabad

Taluka

Modinagar

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ821313/02/2024
Project StatusNew
Project CategoryResidential
DistrictGhaziabad
TalukaModinagar
Start Date2024-01-01
Completion Date2028-05-23
Total Area (sqm)7611
Project Cost (Lacs)2192
Duration (Months)53
Registration Fee43500

Promoter Details

Promoter NameModi Industries Limited
Promoter IDUPRERAPRM236423
Mobile98********

Project Team

rolename
ArchitectMr. Kuldeep Verma
ContractorMr. Navin Tyagi
Structural EngineerEr. Mohd. Shahfaiz

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra375, 3767611

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
113 BHK193.67-
113 BHK193.67-
113 BHK195.26-
113 BHK186.71-
123 BHK193.67-
123 BHK193.67-
123 BHK195.26-
123 BHK186.71-
133 BHK193.67-
133 BHK193.67-
133 BHK195.26-
133 BHK186.71-
143 BHK193.67-
143 BHK193.67-
143 BHK195.26-
143 BHK186.71-
153 BHK193.67-
153 BHK193.67-
153 BHK195.26-
153 BHK186.71-
163 BHK193.67-
163 BHK193.67-
163 BHK195.26-
163 BHK186.71-
173 BHK193.67-
173 BHK193.67-
173 BHK195.26-
173 BHK186.71-
183 BHK193.67-
183 BHK193.67-
183 BHK195.26-
183 BHK186.71-
193 BHK193.67-
193 BHK193.67-
212 BHK164.02-
212 BHK162.77-
212 BHK160.87-
212 BHK160.87-
212 BHK160.87-
212 BHK160.87-
212 BHK160.87-
212 BHK160.87-
222 BHK164.02-
222 BHK162.77-
222 BHK160.87-
222 BHK160.87-
222 BHK160.87-
222 BHK160.87-
222 BHK160.87-
222 BHK160.87-
232 BHK164.02-
232 BHK162.77-
232 BHK160.87-
232 BHK160.87-
232 BHK160.87-
232 BHK160.87-
232 BHK160.87-
232 BHK160.87-
242 BHK164.02-
242 BHK162.77-
242 BHK160.87-
242 BHK160.87-
242 BHK160.87-
242 BHK160.87-
242 BHK160.87-
242 BHK160.87-
252 BHK164.02-
252 BHK162.77-
252 BHK160.87-
252 BHK160.87-
252 BHK160.87-
252 BHK160.87-
252 BHK160.87-
252 BHK160.87-
262 BHK164.02-
262 BHK162.77-
262 BHK160.87-
262 BHK160.87-
262 BHK160.87-
262 BHK160.87-
262 BHK160.87-
262 BHK160.87-
272 BHK164.02-
272 BHK162.77-
272 BHK160.87-
272 BHK160.87-
272 BHK160.87-
272 BHK160.87-
272 BHK160.87-
272 BHK160.87-
282 BHK164.02-
282 BHK162.77-
282 BHK160.87-
282 BHK160.87-
282 BHK160.87-
282 BHK160.87-
282 BHK160.87-
282 BHK160.87-
292 BHK164.02-
292 BHK162.77-
292 BHK160.87-
292 BHK160.87-
292 BHK160.87-
292 BHK160.87-
292 BHK160.87-
292 BHK160.87-
2102 BHK164.02-
2102 BHK162.77-
2102 BHK160.87-
2102 BHK160.87-
2102 BHK160.87-
2102 BHK160.87-
2102 BHK160.87-
2102 BHK160.87-

Development Works

work_namedescription
Demarcation of PlotsKhasra No. 375, 376, Village Sikri Khurd, main Road, Umesh Park, Modinagar, Ghaziabad, U.P. Total Plot Area = 7610.86 square meters.
Boundary Wall2.1 m high boundary wall with 1.8m high brick work and 0.60m highmild steel grill between two R.C.C. columns approx. 4.5m center to center. The boundary wall shall be earthquake resistant.
Road WorkAll roads in the complex will be in M25 grade concrete. Roads will be laid over 225 mm water bound macadam.
FootpathsAll footpaths in the complex will in combination of concrete pavers of difference colors, shape and thickness of 60mm and 90 mm laid over 150 mm water bound macadam surface.
Water Supply Including Drinking Water FacilitiesPotable water supply from GDA shall be collected in underground collection tank and pumped to overhead water tank located at the terrace. The supply of water to individual flats shall be from the said overhead water tanks. Underground and overhead water tank with automatic pumps for 24 hours water supply.
Sewer SystemThe sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plan (STP) of the project, from where the sewage will be used for irrigation and flushing purpose.
DrainRain water shall be collected in drains having a minimum width of 150 mm connected to the underground cement concrete pipeline. For discharge, water will be collected in manholes to be constructed in periphery of complex, and these manholes shall be finally connected with drain of GDA.
ParksLush green landscaped internal park will be provided and maintained. The landscaped parks will have jogging tracks, Pavilion, children play area and sitting area. The total area in the project will be 1143 sqm. (15 percent of the total plot area)
Tree PlantingOne tree for every 80 sqm of land needs to be planted within construction sites for both residential buildings, ensuring 10 percent green cover for every plot. The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
Design For Electric Supply Including Street LightingElectric supply provided through 33/0.415 KV transformers and by DG set supply for backup. External street lighting shall be through solar power with alternate supply through grid.
Community BuildingsNot Applicable
Treatment and Disposal System of Sewage and Sullage waterSewage shall be treated in sewage Treatment plan (STP) and thereafter treated water to be used for flushing and irrigation
Solid Waste Management And Disposal SystemSolid waster to be collected from individual flats and stored in garbage room in the basement. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents of GDA.
Water Conservation SystemRain water harvesting pits shall be provided for ground water recharging and overflow to be discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Energy Management System Including Use of Renewable EnergyThe main power supply will be through HT power connection, stepped down by transformer and then distributed. DG backup of suitable rating will be provided. The campus lighting will be a combination of solar lights and grid supplied power. The light fittings will be power saving LED fittings.
Fire Protection And Fire Safety SystemFire fighting system will be provided for all buildings as per the prevailing requirement of National Building Code. Sprinkler shall be provided in all common areas, basement and inside the individual apartments. Smoke detecters, fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from fire pumps located in the basement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesFire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Other Miscellaneous WorkNot applicable

Bank Details

Bank NameAxis Bank
BranchModinagar
Branch AddressGround Floor and First Floor, Khasra No. 701, Building No. 79, Srinagar Colony, G.T. Road, modinagar, Ghaziabad- 201204
Account HolderModi Industries Limited- Collection Account For Umesh Park Phase- 1
Account Number923020040607153
IFSC CodeUTIB0002206

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy