UNINAV UTOPIA

Uninav Developers Pvt. Ltd.

Ghaziabad, Uttar Pradesh

RERA approved

Approved

1st Apr 2023

Completion pending

Pending

31st Mar 2027

Registration No.

UPRERAPRJ869140

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ869140
Project StatusNew
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2023-04-01
Completion Date2027-03-31
Total Area (sqm)12554.10
Project Cost (Lacs)9997
Duration (Months)48
Registration Fee68000

Promoter Details

Promoter NameUninav Developers Pvt. Ltd.
Promoter IDUPRERAPRM9311
Mobile96********

Project Team

rolename
ArchitectANUJ AGARWAL ARCHITECTS
ContractorMAVI CONSTRUCTION-PRATAP MAVI
Structural EngineerDR. GYAN SINGH- Y G CONSULTING AND ENGINEERS LLP

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra11212570

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
CommercialBSMNTOTHER0200-
CommercialGFSHOP4150
Club/CommunityBSMNTOTHER0293-
Type-1/Tower-A/5 Nos.BSMNTOTHER02788-
Type-1/Tower-A-1GF4 BHK2135.250
Type-1/Tower-A-124 BHK2135.25-
Type-1/Tower-A-134 BHK2135.25-
Type-1/Tower-A-144 BHK2135.25-
Type-1/Tower-A-114 BHK2135.25-
Type-1/Tower-A-2GF4 BHK2135.250
Type-1/Tower-A-214 BHK2135.25-
Type-1/Tower-A-224 BHK2135.25-
Type-1/Tower-A-234 BHK2135.25-
Type-1/Tower-A-244 BHK2135.25-
Type-1/Tower-A-3GF4 BHK2135.250
Type-1/Tower-A-314 BHK2135.25-
Type-1/Tower-A-324 BHK2135.25-
Type-1/Tower-A-334 BHK2135.25-
Type-1/Tower-A-344 BHK2135.25-
Type-1/Tower-A-4GF4 BHK2135.250
Type-1/Tower-A-414 BHK2135.25-
Type-1/Tower-A-424 BHK2135.25-
Type-1/Tower-A-434 BHK2135.25-
Type-1/Tower-A-444 BHK2135.25-
Type-1/Tower-A-5GF4 BHK2135.250
Type-1/Tower-A-514 BHK2135.25-
Type-1/Tower-A-524 BHK2135.25-
Type-1/Tower-A-534 BHK2135.25-
Type-1/Tower-A-544 BHK2135.25-
Type-1/Tower-B/2 Nos.BSMNTOTHER01100-
Type-1/Tower-B-1GF4 BHK2135.250
Type-1A/Tower-B-114 BHK2135.25-
Type-1A/Tower-B-124 BHK2135.25-
Type-1A/Tower-B-134 BHK2135.25-
Type-1A/Tower-B-144 BHK2135.25-
Type-1/Tower-B-2GF4 BHK2135.250
Type-1A/Tower-B-214 BHK2135.25-
Type-1A/Tower-B-224 BHK2135.25-
Type-1A/Tower-B-234 BHK2135.25-
Type-1A/Tower-B-244 BHK2135.25-
Type-1/Tower-C/5 Nos.BSMNTOTHER02490-
Type-1A/Tower-C114 BHK2135.25-
Type-1A/Tower-C124 BHK2135.25-
Type-1A/Tower-C134 BHK2135.25-
Type-1A/Tower-C144 BHK2135.25-
Type-1/Tower-C2GF4 BHK2135.250
Type-1/Tower-C214 BHK2135.25-
Type-1/Tower-C224 BHK2135.25-
Type-1/Tower-C234 BHK2135.25-
Type-1/Tower-C244 BHK2135.25-
Type-1/Tower-C3GF4 BHK2135.250
Type-1/Tower-C314 BHK2135.25-
Type-1/Tower-C324 BHK2135.25-
Type-1/Tower-C334 BHK2135.25-
Type-1/Tower-C344 BHK2135.25-
Type-1/Tower-C4GF4 BHK2135.250
Type-1/Tower-C414 BHK2135.25-
Type-1/Tower-C424 BHK2135.25-
Type-1/Tower-C434 BHK2135.25-
Type-1/Tower-C444 BHK2135.25-
Type-1/Tower-C5GF4 BHK2135.250
Type-1/Tower-C514 BHK2135.25-
Type-1/Tower-C524 BHK2135.25-
Type-1/Tower-C534 BHK2135.25-
Type-1/Tower-C544 BHK2135.25-
Type-2/Tower-D/3 NosBSMNTOTHER01497-
Type-2/Tower-D-1GF4 BHK2126.870
Type-2/Tower-D-114 BHK2126.87-
Type-2/Tower-D-124 BHK2126.87-
Type-2/Tower-D-134 BHK2126.87-
Type-2/Tower-D-144 BHK2126.87-
Type-2/Tower-D-2GF4 BHK2126.870
Type-2/Tower-D-214 BHK2126.87-
Type-2/Tower-D-224 BHK2126.87-
Type-2/Tower-D-234 BHK2126.87-
Type-2/Tower-D-244 BHK2126.87-
Type-2/Tower-D-3GF4 BHK2126.870
Type-2/Tower-D-314 BHK2126.87-
Type-2/Tower-D-324 BHK2126.87-
Type-2/Tower-D-334 BHK2126.87-
Type-2/Tower-D-344 BHK2126.87-
Commercial1STUDIO430.31-
Commercial2STUDIO427.27-
Commercial3STUDIO425.58-
Commercial4STUDIO433.78-
Tower-1A/Tower C1GF4 BHK2135.250
Club/CommunityGFOTHER0249.250
Club/Community1OTHER0249.25-
Club/Community2OTHER0249.25-
Club/Community3OTHER0249.25-

Development Works

work_namedescription
Demarcation of PlotsCovered by temporary sheets on the point given by the patwari
Boundary Wall7ft height boundary wall of RCC wall/column and brick work as per drawings
Road WorkCement Concrete Road over the subbase 200mm thick GSB+2 layer of WBM
Footpaths75mm high from the road level with cc interlocking tiles over the subbase of 100mm thick P.C.C. and 50mm thick bed of fine sand.
Water Supply Including Drinking Water Facilitieswater connection for the domestic uses will be provided be the concerned authority and storage will be done in under ground water tank of the capacity as per the norms
Sewer Systemmain sewer line has been designed as per norms and pvc pipe of 10kg pressure will be used in the vertical stags in the shafts, partially sewer line will be lay in basement ceiling and sill finally connect to STP.
Drainunderground pipeline drain will be lay in slops as per norms and collecting chambers as per the norms will be provide to collect the surface rain water.
ParksSoft Landscape will be done in the park with sufficient electrical lightning
Tree Plantingtree plantation of the different variable of trees as per the site conditions are planned by follows the authority guidelines
Design For Electric Supply Including Street LightingM.S. street light designer poles with energy saving LED lightning fixtures will be used. partially light will be operated from the solar panel will installed on the terrace.
Community BuildingsFramed RCC Structure
Treatment and Disposal System of Sewage and Sullage waterSTP will be installed as basement for treated the sewer and treated water will be recycled for use in flushing and gardening
Solid Waste Management And Disposal Systemwill be done be the external vendors by collecting the garbage from the dustbin/shops and segreggate the same for the recycling the dry waste and prepare the compost from the wet waste
Water Conservation Systemrain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area
Energy Management System Including Use of Renewable Energysolar panel will be installed on the terrace for the conservation if the electricity as per the norms of MOE
Fire Protection And Fire Safety Systemsystem will be provide as per the fire department guidelines by fulfill the fire norms as per the NBCC
Social Infrastructure And Other Public Amenities Including Public Health Servicesshall be provided as per building bye laws of Ghaziabad development authority
Emergency Evacuation Servicesseparate fire stair case is designed for evacuation service in the building
Other Miscellaneous Workas per the requirement on period of time

Bank Details

Bank NameHDFC BANK LTD
BranchRAJ NAGAR EXTENSIOIN
Branch AddressRAJ NAGAR EXTENSION GHAZIABAD
Account HolderUNINAV DEVELOPERS PVT LTD COLLECTION A/C FOR UNINAV UTOPIA
Account Number50200078752122
IFSC CodeHDFC0009481

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy