New Launch - India Real Estate Report 2026.

URBAN HOMES PHASE 1B

UH REALCON PRIVATE LIMITED

Ghaziabad, Uttar Pradesh

RERA approved

Approved

21st May 2014

Project completed

Completed

19th Oct 2022

Registration No.

UPRERAPRJ2327

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ2327
Project StatusCompleted
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2014-05-21
Completion Date2022-10-19
Total Area (sqm)9069
Project Cost (Lacs)7600
Duration (Months)101
Registration Fee50500

Promoter Details

Promoter NameUH REALCON PRIVATE LIMITED
Promoter IDUPRERAPRM1356
Mobile93********

Project Team

rolename
ArchitectN + U DESIGN STUDIO
ContractorPROGRESSIVE BUILDCON PRIVATE LIMITED, SLM CONTRACT
Structural EngineerKEEN ASSOCIATES PRIVATE LIMITED

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra23751875
Khasra2377721
Khasra2378278
Khasra23802843
Khasra23813031
Khasra23821338
Khasra24061648
Khasra2407304
Khasra2410365
Khasra2411266
Khasra24221015

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
D11 BHK1231.586-
D21 BHK1231.586-
D31 BHK1231.586-
D41 BHK1231.586-
D51 BHK1231.586-
D61 BHK1231.586-
D71 BHK1231.586-
D81 BHK1231.586-
D91 BHK1231.586-
D101 BHK1231.586-
D111 BHK1231.586-
D121 BHK1231.586-
D131 BHK1231.586-
D141 BHK1231.586-
E11 BHK1231.586-
E21 BHK1231.586-
E31 BHK1231.586-
E41 BHK1231.586-
E51 BHK1231.586-
E61 BHK1231.586-
E71 BHK1231.586-
E81 BHK1231.586-
E91 BHK1231.586-
E101 BHK1231.586-
E111 BHK1231.586-
E121 BHK1231.586-
E131 BHK1231.586-
E141 BHK1231.586-
H11 BHK1231.586-
H21 BHK1231.586-
H31 BHK1231.586-
H41 BHK1231.586-
H51 BHK1231.586-
H61 BHK1231.586-
H71 BHK1231.586-
H81 BHK1231.586-
H91 BHK1231.586-
H101 BHK1231.586-
H111 BHK1231.586-
H121 BHK1231.586-
H131 BHK1231.586-
H141 BHK1231.586-
G11 BHK1231.586-
G21 BHK1231.586-
G31 BHK1231.586-
G41 BHK1231.586-
G51 BHK1231.586-
G61 BHK1231.586-
G71 BHK1231.586-
G81 BHK1231.586-
G91 BHK1231.586-
G101 BHK1231.586-
G111 BHK1231.586-
G121 BHK1231.586-
G131 BHK1231.586-
G141 BHK1231.586-

Development Works

work_namedescription
Demarcation of PlotsEnclosed with Boundary wall
Boundary WallCombination of RCC column with brick work ,plaster/paint
Road WorkRoad pattern is provided in such a way that approach to all the towers is motorable and section consists of Subgrade prepration with 1 layer GSB and 1 layer of WMM & black top/Cement Concrete pavement
FootpathsCombination of Kerb stone/pavers/mosaic grit on compacted subgrade
Water Supply Including Drinking Water FacilitiesSystem for drinking water is ground water and provided thru underground/overhead Water tanks
Sewer SystemHouseHold Sewerage is collected through sewage lines upto the common STP established for the project and after treatment the sludge and treated water obtained shall be used in green areas like gardens,parks,green landscapes and also for flushing lines
DrainRain water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to rain harvesting pits.
ParksProvision of green area for entire project
Tree PlantingPlanned trees are 46 Nos. accordingly in Open areas and along the boundarywall different types of trees are provided
Design For Electric Supply Including Street LightingElectrical connection for the project from PVVNL or its Licenscee/Sub-Licenscee and connection will be provided to customers thru prepaid meter and proportinate electricity infrastructure cost including feeder construction expenses,substations/panels/transformers/other equipments /expenses,cabling expenses,system loading charges ,security charges etc as applicable and further subject to regular payments of fixed elcectricity charges,usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/levy as applicable and demanded from time to time
Community BuildingsA common club cum swimming pool alongwith Gym etc provided for entire Urban Homes project
Treatment and Disposal System of Sewage and Sullage waterSTP provided for treating household sewerage and the treated Sludge/water is being used for green areas and flushing system
Solid Waste Management And Disposal SystemHouse to House collection system has been provided with a arrangment of separate collection of decomposable and non decomposable waste in separate bags and a treatment arrangement is done for the same
Water Conservation SystemUnderground recharge pits with perforated filter media used for rain water harvesting provided
Energy Management System Including Use of Renewable EnergyNA
Fire Protection And Fire Safety SystemVertcial risers with FHC shaft,MOEFA with pa system and a pump room with a provison of Jockey/Main/diesel pump etc is done
Social Infrastructure And Other Public Amenities Including Public Health ServicesNIL
Emergency Evacuation ServicesFire Staircase provided
Other Miscellaneous WorkNA

Bank Details

Bank NameHDFC BANK LIMITED
BranchHDFC BANK LIMITED LSC-19&20, BLOCK-A, PREET VIHAR, NEW DELHI-110092
Branch AddressLSC-19&20, BLOCK-A, PREET VIHAR, NEW DELHI-110092
Account HolderUH REALCON PRIVATE LIMITED, PHASE,RERA Project Escrow Account phase 1B
Account Number57500000063447
IFSC CodeHDFC0001350

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy