New Launch - India Real Estate Report 2026.

Vaastu Homes

Envyrons Infrastructure Private Limited

Ghaziabad, Uttar Pradesh

RERA approved

Approved

1st Jan 2024

Completion pending

Pending

31st Dec 2028

Registration No.

UPRERAPRJ802380/10/2024

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ802380/10/2024
Project StatusNew
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2024-01-01
Completion Date2028-12-31
Total Area (sqm)12000
Project Cost (Lacs)35428
Duration (Months)60
Registration Fee65000

Promoter Details

Promoter NameEnvyrons Infrastructure Private Limited
Promoter IDUPRERAPRM297862
Mobile98********

Project Team

rolename
ArchitectAr. Hardik Mittal
ContractorM.R. Builders
Structural EngineerNavrang Kumar

Land Details

typekhasra_or_plot_noarea_sqmt
PlotPlot No. 4/BS-02/02, Siddharth Vihar Yojna, Ghaziabad, Uttar Pradesh12000

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
CommercialGFSHOP1413.580
CommercialGFSHOP113.720
CommercialGFSHOP113.470
CommercialGFSHOP16.010
CommercialGFSHOP14.700
CommercialGFSHOP115.820
CommercialGFSHOP112.730
CommercialGFSHOP113.420
Commercial1SHOP410.57-
Commercial1SHOP210.72-
Commercial1SHOP110.47-
ARGFOTHER1416.780
AR1OTHER1115.52-
AR24 BHK1134.97-
AR23 BHK1131.72-
AR23 BHK1117.84-
AR23 BHK1117.46-
AR23 BHK1112.57-
AR23 BHK1140.37-
AR2OTHER1292.41-
AR24 BHK1134.95-
AR2OTHER1315.49-
AR34 BHK1134.97-
AR33 BHK1131.72-
AR33 BHK1117.84-
AR33 BHK1117.46-
AR33 BHK1112.57-
AR33 BHK1138.72-
AR34 BHK1134.95-
AR44 BHK1134.97-
AR4OTHER1315.49-
AR43 BHK1131.72-
AR43 BHK1117.84-
AR43 BHK1117.46-
AR43 BHK1112.57-
AR43 BHK1140.37-
AR4OTHER1292.41-
AR44 BHK1134.95-
AR54 BHK1134.97-
AR53 BHK1131.72-
AR53 BHK1117.84-
AR53 BHK1117.46-
AR53 BHK1112.57-
AR53 BHK1138.72-
AR54 BHK1134.95-
AR64 BHK1134.97-
AR6OTHER1315.49-
AR63 BHK1131.72-
AR63 BHK1117.84-
AR63 BHK1117.46-
AR63 BHK1112.57-
AR63 BHK1140.37-
AR6OTHER1292.41-
AR64 BHK1134.95-
AR74 BHK1134.97-
AR73 BHK1131.72-
AR73 BHK1117.84-
AR73 BHK1117.46-
AR73 BHK1112.57-
AR73 BHK1138.72-
AR74 BHK1134.95-
AR84 BHK1134.97-
AR8OTHER1315.49-
AR83 BHK1131.72-
AR83 BHK1117.84-
AR83 BHK1117.46-
AR83 BHK1112.57-
AR83 BHK1140.37-
AR8OTHER1292.41-
AR84 BHK1134.95-
AR94 BHK1134.97-
AR93 BHK1117.84-
AR93 BHK1117.46-
AR93 BHK1112.57-
AR93 BHK1138.72-
AR94 BHK1134.95-
AR93 BHK1131.72-
AR104 BHK1134.97-
AR10OTHER1315.49-
AR103 BHK1131.72-
AR103 BHK1117.84-
AR103 BHK1117.46-
AR103 BHK1112.57-
AR103 BHK1140.37-
AR10OTHER1292.41-
AR104 BHK1134.95-
AR114 BHK1134.97-
AR113 BHK1131.72-
AR113 BHK1117.84-
AR113 BHK1117.46-
AR113 BHK1112.57-
AR113 BHK1138.72-
AR114 BHK1134.95-
AR124 BHK1134.97-
AR12OTHER1315.49-
AR123 BHK1131.72-
AR123 BHK1117.84-
AR123 BHK1117.46-
AR123 BHK1112.57-
AR123 BHK1140.37-
AR12OTHER1292.41-
AR124 BHK1134.95-
AR134 BHK1134.97-
AR133 BHK1131.72-
AR133 BHK1117.84-
AR133 BHK1117.46-
AR133 BHK1112.57-
AR133 BHK1138.72-
AR134 BHK1134.95-
AR144 BHK1134.97-
AR14OTHER1315.49-
AR143 BHK1131.72-
AR143 BHK1117.84-
AR143 BHK1117.46-
AR143 BHK1112.57-
AR143 BHK1140.37-
AR14OTHER1292.41-
AR144 BHK1134.95-
AR154 BHK1134.97-
AR153 BHK1131.72-
AR153 BHK1117.84-
AR153 BHK1117.46-
AR153 BHK1112.57-
AR153 BHK1138.72-
AR154 BHK1134.95-
AR164 BHK1134.97-
AR163 BHK1172.38-
AR163 BHK1117.84-
AR163 BHK1112.57-
AR163 BHK1140.37-
AR163 BHK1160.72-
AR164 BHK1134.95-
AR163 BHK1131.72-
AR174 BHK1134.97-
AR17OTHER1143.11-
AR173 BHK1131.72-
AR173 BHK1117.84-
AR173 BHK1117.46-
AR173 BHK1138.72-
AR17OTHER1131.69-
AR174 BHK1134.95-
AR173 BHK1112.57-
AR184 BHK1134.97-
AR183 BHK1172.38-
AR183 BHK1131.72-
AR183 BHK1117.84-
AR183 BHK1117.46-
AR183 BHK1112.57-
AR183 BHK1140.37-
AR183 BHK1160.72-
AR184 BHK1134.95-
AR194 BHK1134.97-
AR19OTHER1143.11-
AR193 BHK1131.72-
AR193 BHK1117.84-
AR193 BHK1117.46-
AR193 BHK1112.57-
AR193 BHK1138.72-
AR19OTHER1131.69-
AR194 BHK1134.95-
AR204 BHK1134.97-
AR203 BHK1172.38-
AR203 BHK1131.72-
AR203 BHK1117.84-
AR203 BHK1117.46-
AR203 BHK1112.57-
AR203 BHK1140.37-
AR203 BHK1160.72-
AR204 BHK1134.95-
AR214 BHK1134.97-
AR21OTHER1143.11-
AR213 BHK1131.72-
AR213 BHK1117.46-
AR213 BHK1112.57-
AR213 BHK1138.72-
AR21OTHER1131.69-
AR214 BHK1134.95-
AR213 BHK1117.84-
AR22OTHER00-
AR234 BHK1134.97-
AR23OTHER1143.11-
AR233 BHK1131.72-
AR233 BHK1117.84-
AR233 BHK1117.46-
AR233 BHK1112.57-
AR233 BHK1138.72-
AR23OTHER1131.69-
AR234 BHK1134.95-
AR244 BHK1134.97-
AR243 BHK1172.38-
AR243 BHK1131.72-
AR243 BHK1117.84-
AR243 BHK1112.57-
AR243 BHK1140.37-
AR243 BHK1160.72-
AR244 BHK1134.95-
AR254 BHK1134.97-
AR25OTHER1143.11-
AR253 BHK1131.72-
AR253 BHK1117.84-
AR253 BHK1117.46-
AR253 BHK1112.57-
AR253 BHK1138.72-
AR25OTHER1131.69-
AR254 BHK1134.95-
AR264 BHK1134.97-
AR263 BHK1172.38-
AR263 BHK1131.72-
AR263 BHK1117.84-
AR263 BHK1117.46-
AR263 BHK1112.57-
AR263 BHK1140.37-
AR263 BHK1160.72-
AR264 BHK1134.95-
AR274 BHK1134.97-
AR27OTHER1143.11-
AR273 BHK1131.72-
AR273 BHK1117.84-
AR273 BHK1117.46-
AR273 BHK1112.57-
AR273 BHK1138.72-
AR27OTHER1131.69-
AR274 BHK1134.95-
AR284 BHK1134.97-
AR283 BHK1172.38-
AR283 BHK1131.72-
AR283 BHK1117.84-
AR283 BHK1117.46-
AR283 BHK1112.57-
AR283 BHK1140.37-
AR283 BHK1160.72-
AR284 BHK1134.95-
AR294 BHK1134.97-
AR29OTHER1143.11-
AR293 BHK1131.72-
AR293 BHK1117.84-
AR293 BHK1117.46-
AR293 BHK1112.57-
AR293 BHK1138.72-
AR29OTHER1131.69-
AR294 BHK1134.95-
AR304 BHK1134.97-
AR303 BHK1172.38-
AR303 BHK1131.72-
AR303 BHK1117.84-
AR303 BHK1117.46-
AR303 BHK1112.57-
AR303 BHK1140.37-
AR303 BHK1160.72-
AR304 BHK1134.95-
AR314 BHK1134.97-
AR31OTHER1143.11-
AR313 BHK1131.72-
AR313 BHK1117.84-
AR313 BHK1117.46-
AR313 BHK1112.57-
AR313 BHK1138.72-
AR31OTHER1131.69-
AR314 BHK1134.95-
AR324 BHK1134.97-
AR323 BHK1172.38-
AR323 BHK1131.72-
AR323 BHK1117.84-
AR323 BHK1112.57-
AR323 BHK1140.37-
AR323 BHK1160.72-
AR324 BHK1134.95-
AR33OTHER00-
AR344 BHK1134.97-
AR343 BHK1172.38-
AR343 BHK1131.72-
AR343 BHK1117.84-
AR343 BHK1117.46-
AR343 BHK1112.57-
AR343 BHK1140.37-
AR343 BHK1160.72-
AR344 BHK1134.95-
AR354 BHK1134.97-
AR35OTHER1143.11-
AR353 BHK1131.72-
AR353 BHK1117.84-
AR353 BHK1117.46-
AR353 BHK1112.57-
AR353 BHK1138.72-
AR35OTHER1131.69-
AR354 BHK1134.95-
AR364 BHK1134.97-
AR36OTHER1143.11-
AR363 BHK1138.72-
AR36OTHER1131.69-
AR364 BHK1134.95-
ARBSMNTOTHER00-
ARBSMNT2OTHER00-
ARBSMNT3OTHER00-
CommercialBSMNTOTHER00-
CommercialBSMNT2OTHER00-
CommercialBSMNT3OTHER00-
EWS/LIGBSMNTOTHER00-
EWS/LIGBSMNT2OTHER00-
EWS/LIGBSMNT3OTHER00-
EWS/LIGGFOTHER000
EWS/LIG11 BHK634.88-
EWS/LIG11 BHK132.55-
EWS/LIG11 BHK140.12-
EWS/LIG11 BHK140.12-
EWS/LIG11 BHK141.27-
EWS/LIG11 BHK238.86-
EWS/LIG11 BHK138.80-
EWS/LIG21 BHK634.88-
EWS/LIG21 BHK132.55-
EWS/LIG21 BHK140.12-
EWS/LIG21 BHK140.12-
EWS/LIG21 BHK141.27-
EWS/LIG21 BHK238.86-
EWS/LIG21 BHK138.80-
EWS/LIG31 BHK633.10-
EWS/LIG31 BHK130.75-
EWS/LIG31 BHK238.86-
EWS/LIG31 BHK138.80-
EWS/LIG31 BHK141.27-
EWS/LIG31 BHK140.12-
EWS/LIG31 BHK140.12-
EWS/LIG41 BHK633.10-
EWS/LIG41 BHK130.75-
EWS/LIG41 BHK238.86-
EWS/LIG41 BHK138.80-
EWS/LIG41 BHK141.27-
EWS/LIG41 BHK140.12-
EWS/LIG41 BHK140.12-
EWS/LIG51 BHK633.10-
EWS/LIG51 BHK130.75-
EWS/LIG51 BHK238.86-
EWS/LIG51 BHK138.80-
EWS/LIG51 BHK141.27-
EWS/LIG51 BHK140.12-
EWS/LIG51 BHK140.12-
EWS/LIG61 BHK633.10-
EWS/LIG61 BHK130.75-
EWS/LIG61 BHK234.19-
EWS/LIG61 BHK138.86-
EWS/LIG61 BHK141.27-
EWS/LIG61 BHK140.12-
EWS/LIG61 BHK140.12-
EWS/LIG71 BHK633.10-
EWS/LIG71 BHK130.75-
EWS/LIG71 BHK234.19-
EWS/LIG71 BHK138.86-
EWS/LIG71 BHK141.27-
EWS/LIG71 BHK140.12-
EWS/LIG71 BHK140.12-
EWS/LIG81 BHK633.10-
EWS/LIG81 BHK130.75-
EWS/LIG81 BHK234.19-
EWS/LIG81 BHK138.86-
EWS/LIG81 BHK141.27-
EWS/LIG81 BHK140.12-
EWS/LIG81 BHK140.12-
EWS/LIG91 BHK633.10-
EWS/LIG91 BHK130.75-
EWS/LIG91 BHK234.19-
EWS/LIG91 BHK138.86-
EWS/LIG91 BHK141.27-
EWS/LIG91 BHK140.12-
EWS/LIG91 BHK140.12-
EWS/LIG101 BHK333.10-
EWS/LIG10OTHER1175.17-
EWS/LIG10OTHER145.92-
EWS/LIG10OTHER146.81-
EWS/LIG10OTHER1184.88-

Development Works

work_namedescription
Demarcation of PlotsDemarcation of the plot is completed by appointed survey consultant. The plot boundaries are given as per the Uttar Pradeh Avas Vikas Parishad.
Boundary WallBoundary wall is proposed to be constructed as per the survey drawing and architectural layout. Whereas Temporary G.1 Sheet Fencing work done for construction work and permanent boundary wall to be constructed after completion of the construction work.
Road WorkYes, RCC Trimix Road with Kerb Stone on Sides and Stone Paving in front of Towers.
FootpathsAll Footpaths will be constructed as per the Architectural Site Plan and Landscape Drawing.
Water Supply Including Drinking Water FacilitiesYes, Water Supply from Authority, further water to be collected in underground water reservoirs Terrace Tanks, equipped with Hydro Pneumatic pumps with GI rings and risers.
Sewer SystemRCC hume Pipe Underground sewage system with Manhole, Chambers, Collection Chamber and Connections with Authority Sewer System.
DrainDrains are provided in the entire open area that carries water to two number of rainwater harvesting chambers provided at each corner on the site. An excess water will be discharged to the Authority Drain.
ParksParks in the form of Open/Green Area is provided at the ground level which is 20.33 per cent of the plot area i.e. 2439.56 sq.mt.
Tree PlantingAs per MoEFCC norms, no. of trees required = 9059.72/100 = 91 Trees. Provided is 125 Trees.
Design For Electric Supply Including Street LightingElectric Supply and Street Lighting will be developed as per the design provided by the Architect and appointed consultant considering site requirements. The HT Line to be taken from UPPCL, converted to LT Supply with in-house transformers and a switching system. Street lights shall be Led based.
Community BuildingsCommunity area of 342.02 sq. mtrs. at first floor level and Anganbari Area of 190.01 sq.mtrs. at ground floor level as per UPAVP Approved plan and maybe used as common area for Gym Day Care, Indoor Games, etc.
Treatment and Disposal System of Sewage and Sullage waterProposed STP of Capacity i.e. 290 KLD wil be installed for the treatment of Waste Water. After the treatment, water will be generated which will be entirely used for DG Cooling, Horticulture and Flushing . Following arrangements will be made at the site in accordance to Solid Waste Management Rules, 2016- a) 60 per cent Bio-degradable waste b) 30 percent Non-biodegradable c) 10 per cent inert waste The solid waste will be segregated at source and collected through trained employed personals
Solid Waste Management And Disposal SystemDedicated covered and isolated site for storage of wastes. Adequate number of coloured bins (green, blue and dark grey) seperate for Bio-Degradable and Non-Biodegradable are proposed to be provided at the strategic location within site. STP Sludge is proposed to be used for Horticulture Purposes as manure. Horticulture waste is composted and used for gardening purposes. Organic waste convertor will be installed to convert Bio-Degradable wastes into manure. The manure will be used in Horticulture. Roof top area Ground Coverage = 2940.28 m2 Green Area = 2439.56 m2 Paved Area Total Plot Area - ( Roof-top Area + Green Area) = 12000 - (2940.28 + 2439.56) = 6620.16 m2 Runoff load Roof-top Area = 2940.28 x 0.06 x 0.9 = 158.78 m3/hr
Water Conservation SystemGreen Area = 2439.56 x 0.06 x 0.15 = 21.96 m3/hr Paved Area [ Plot Area - (Roof-Top + Green Area)] = 6620.16 x 0.06 x 0.85 = 337.63 m3/hr. Total Runoff Load = (158.78 + 21.96 + 337.63) m3/hr. = 518.37 m3/hr. Considering size of recharge pit size will be 10 m. long, 8 m wide and 2 m deep. So the volume of a single pit will be = 160 Cum Total Recharge will be required = 518.37/160 = 3.24 no.s Hence the power requirement for the project is 2630 kW. 3- Transformer of total capacity 1000 KVA/1000 KVA/630 will be provided. Source of power will be UPPCL.
Energy Management System Including Use of Renewable EnergyDG sets of total capacity 2250 KVA (3 of 750 KVA) each will be provided for power back up. Silent DG sets are proposed to reduce the noise level and CPCB norms will be compiled to check the pollution. Monitoring of DG Sets (Stack emission) will be done quarterly. Height of the stacks will be 150.95 meters from the ground level, and 6 m from the roof top, the height of the highest building is 144.95 m. The Fire Protection System for the building is to be designed as per the provisions of National Building Code- 2005 and the directions of local fire Authority. In addition to above, the Fire Extinguisher system is to be designed in accordance with IS 2190. Height of the building 144.95 m. Fire NOC has been obtained. Fire Fighting facilities.
Fire Protection And Fire Safety SystemHose reel, Landing Valve, wet riser of F.B. Inlet on each floor according to the standards. Fire extinguisher of each floor according to IS-2190. Automatic sprinkler system on entire building. Automatic Fire detection and alarm system (being taken care by Electrical Consultant). Yard Hydrants on the periphery of the building. Public Address and Communication system ( being taken care by Electrical Consultant) Alternate source for fulfilling the electricity requirement. One lift with the provision of Fireman switch. Mechanical ventilation in basement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSocial infrastructural space is provided at ground and first floor level and in community hall and Anganwari as per approved plan by UPAVP. Retail Shops are to be provided as part of commercial area which is to be rent out or sold seperately by the Developer. Private Swimming Pool, Private Common Area/hall, seperate entertainment area at the top floor level of the Towers and ground floor private resort area and the other far area except Anganwari area at the ground level and community area at the first floor level and other such areas shall be provided which is to be rent out or sold seperately by the Developer which will be a part of "Independent Area". All such independent areas are given by the deed of decleration, the part of process of sanctioning of the plan.
Emergency Evacuation ServicesFire staircase is provided in each Tower and in basement area for emergency evacuation as per the NBC guidelines and 9/6 m wide fire tender path has been provided for Fire tender movement in case of emergency.
Other Miscellaneous WorkDedicated seperate entry and exit has been proposed to enter the premises for better security and vehicular movement. Double stack parking provision, IGL Gas piping- supply system, basement ventilation system, entrance lobby air conditioning, provision of air conditioning at other areas as per requirement, etc.

Bank Details

Bank NameAxis Bank Limited
BranchAmbedkar Road, Nehru Nagar, Ghaziabad
Branch AddressPlot no. 3, N/30, Ambedkar Road, Nehru Nagar, Ghaziabad
Account HolderEnvyrons Infrastructure-Collection Account for Vaastu Homes
Account Number924020013286348
IFSC CodeUTIB0000095

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy