VVD-BLOOM
VANSHIKA VEDANT DEVELOPERS LLP
Ghaziabad, Uttar Pradesh
Approved
1st May 2023
Pending
26th Dec 2027
Registration No.
UPRERAPRJ165336
Project Type
Commercial
District
Ghaziabad
Taluka
Ghaziabad
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ165336 |
| Project Status | New |
| Project Category | Commercial |
| District | Ghaziabad |
| Taluka | Ghaziabad |
| Start Date | 2023-05-01 |
| Completion Date | 2027-12-26 |
| Total Area (sqm) | 1221 |
| Project Cost (Lacs) | 791 |
| Duration (Months) | 56 |
| Registration Fee | 23000 |
Promoter Details
| Promoter Name | VANSHIKA VEDANT DEVELOPERS LLP |
| Promoter ID | UPRERAPRM225372 |
| Mobile | 98******** |
Project Team
| role | name |
|---|---|
| Architect | Anuj Agarwal |
| Contractor | Sachin Kumar |
| Structural Engineer | Gulam |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 527m | 1221.64 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Hotel | GF | SHOP | 1 | 33.65 | 0 |
| Hotel | GF | SHOP | 1 | 28.28 | 0 |
| Hotel | GF | SHOP | 1 | 28.34 | 0 |
| Hotel | GF | SHOP | 1 | 28.48 | 0 |
| Hotel | GF | SHOP | 1 | 27.78 | 0 |
| Hotel | GF | SHOP | 1 | 28.48 | 0 |
| Hotel | GF | SHOP | 1 | 27.74 | 0 |
| Hotel | GF | OTHER | 1 | 23.70 | 0 |
| Hotel | GF | OTHER | 1 | 74.26 | 0 |
| Hotel | 1 | SHOP | 1 | 33.89 | - |
| Hotel | 1 | SHOP | 1 | 28.46 | - |
| Hotel | 1 | SHOP | 1 | 28.53 | - |
| Hotel | 1 | SHOP | 1 | 28.66 | - |
| Hotel | 1 | SHOP | 1 | 28.17 | - |
| Hotel | 1 | SHOP | 1 | 28.66 | - |
| Hotel | 1 | SHOP | 1 | 27.91 | - |
| Hotel | 1 | OTHER | 1 | 73.24 | - |
| Hotel | 2 | OTHER | 1 | 336.24 | - |
| Hotel | 2 | OTHER | 1 | 54.3 | - |
| Hotel | 3 | STUDIO | 1 | 62.13 | - |
| Hotel | 3 | STUDIO | 1 | 27.98 | - |
| Hotel | 3 | STUDIO | 1 | 28.11 | - |
| Hotel | 3 | STUDIO | 1 | 27.63 | - |
| Hotel | 3 | STUDIO | 1 | 71.23 | - |
| Hotel | 3 | STUDIO | 1 | 30.78 | - |
| Hotel | 3 | STUDIO | 1 | 24.42 | - |
| Hotel | 4 | OTHER | 1 | 270 | - |
| Hotel | 5 | STUDIO | 1 | 42.36 | - |
| Hotel | 5 | STUDIO | 1 | 26.39 | - |
| Hotel | 5 | STUDIO | 1 | 26.46 | - |
| Hotel | 5 | STUDIO | 1 | 26.13 | - |
| Hotel | 5 | STUDIO | 1 | 49.88 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Covered by the temporary sheets on the point given by the patwari. |
| Boundary Wall | 7 ft. height boundary wall of RCC wall/column and brickwork as per drawings. |
| Road Work | Cement concrete road over the subbase 200mm thick GSB+ 2 layer of WSM. |
| Footpaths | 75 mm high from the road level with cc interlocking tiles over the subbase of 100 mm thick P.C.C and 50 mm thick bed of fine sand. |
| Water Supply Including Drinking Water Facilities | Water connection for commercial uses will be provided by the Ghaziabad Development Authority and storage will be done under a groundwater tank of the capacity super the norms. |
| Sewer System | The main sewer line has been designed as per norms and a PVC pipe of 10 KG pressure will be used in the vertical stags in the shafts partial sewer line will be laid in the basement ceiling and will finally connect to STP. |
| Drain | An underground pipeline drain will be laid in the slope as per norms and collecting chambers as per the norms will be provided to collect the surface rainwater. |
| Parks | The soft landscape will be done in the park with sufficient electrical lighting. |
| Tree Planting | Tree plantation of the different variables of trees as per the site conditions is planned which follows the authority guidelines. |
| Design For Electric Supply Including Street Lighting | M.S. Street light designer poles with energy-saving LED lighting fixtures will be used. Partial light will be operated from the solar panel which will be installed on the terrace. |
| Community Buildings | Not Applicable |
| Treatment and Disposal System of Sewage and Sullage water | STP will be installed in the basement for treating the sewer and treated water will be recycled for use in flushing and gardening. |
| Solid Waste Management And Disposal System | Solid waste management and disposal system will be done by an external vendor by collecting the garbage from the dustbin./shops and segregating the same for recycling the dry waste and preparing the compost from the wet waste. |
| Water Conservation System | Rain water harvesting pit has been planned in the open area for recharging the groundwater by collecting the rainwater from the terrace and road surface area. |
| Energy Management System Including Use of Renewable Energy | Solar panels will be installed on the terrace for the conservation of electricity as per the norms of MOE. |
| Fire Protection And Fire Safety System | Fire protection and fire safety system will be provided as per the fire department guidelines by fulfilling the fire norms as per NBC. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not Applicable |
| Emergency Evacuation Services | A separate fire staircase is designed for evacuation service in the building. |
| Other Miscellaneous Work | As per the requirement on the period of time. |
Bank Details
| Bank Name | Bank of India |
| Branch | Raj Nagar extension |
| Branch Address | Khasra No. 839, Main road Raj Nagar Extension |
| Account Holder | VANSHIKA VEDANT DEVELOPERS LLP- COLLECTION ACCOUNT FOR VVD-BLOOM |
| Account Number | 714320910000001 |
| IFSC Code | BKID0007143 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





