New Launch - India Real Estate Report 2026.

WINDSOR PARADISE-II (BLOCK F)

High End Infratech Private Limited

Ghaziabad, Uttar Pradesh

RERA approved

Approved

22nd Dec 2015

Project completed

Completed

30th Sept 2021

Registration No.

UPRERAPRJ7383

Project Type

Residential

District

Ghaziabad

Taluka

Ghaziabad

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ7383
Project StatusCompleted
Project CategoryResidential
DistrictGhaziabad
TalukaGhaziabad
Start Date2015-12-22
Completion Date2021-09-30
Total Area (sqm)2862
Project Cost (Lacs)3100
Duration (Months)70
Registration Fee19500

Promoter Details

Promoter NameHigh End Infratech Private Limited
Promoter IDUPRERAPRM5955
Mobile+9196********

Project Team

rolename
ArchitectANUJ AGARWAL
ContractorUNITY AURUM CONSTRUCTION PVT LTD
Structural EngineerAMAR KANT CHAUDHARY

Land Details

typekhasra_or_plot_noarea_sqmt
Khasrapart of khasra no.1007 (total registry 12070 sq.mt2862

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
BLOCK-F12 BHK153.93-
BLOCK-F13 BHK268.96-
BLOCK-F13 BHK187.23-
BLOCK-F13 BHK195.07-
BLOCK-F14 BHK1116-
BLOCK-F22 BHK153.93-
BLOCK-F23 BHK268.96-
BLOCK-F23 BHK187.23-
BLOCK-F23 BHK195.07-
BLOCK-F24 BHK1116-
BLOCK-F32 BHK153.93-
BLOCK-F33 BHK268.96-
BLOCK-F33 BHK187.23-
BLOCK-F33 BHK195.07-
BLOCK-F34 BHK1116-
BLOCK-F42 BHK153.93-
BLOCK-F43 BHK268.96-
BLOCK-F43 BHK187.23-
BLOCK-F43 BHK195.07-
BLOCK-F44 BHK1116-
BLOCK-F52 BHK153.93-
BLOCK-F53 BHK268.96-
BLOCK-F53 BHK187.23-
BLOCK-F53 BHK195.07-
BLOCK-F54 BHK1116-
BLOCK-F62 BHK153.93-
BLOCK-F63 BHK268.96-
BLOCK-F63 BHK187.23-
BLOCK-F63 BHK195.07-
BLOCK-F64 BHK1116-
BLOCK-F72 BHK153.93-
BLOCK-F73 BHK268.96-
BLOCK-F73 BHK187.23-
BLOCK-F73 BHK195.07-
BLOCK-F74 BHK1116-
BLOCK-F82 BHK153.93-
BLOCK-F83 BHK268.96-
BLOCK-F83 BHK187.23-
BLOCK-F83 BHK195.07-
BLOCK-F84 BHK1116-
BLOCK-F92 BHK153.93-
BLOCK-F93 BHK168.96-
BLOCK-F93 BHK187.23-
BLOCK-F93 BHK195.07-
BLOCK-F94 BHK1116-
BLOCK-F102 BHK153.93-
BLOCK-F103 BHK268.96-
BLOCK-F103 BHK187.23-
BLOCK-F103 BHK195.07-
BLOCK-F104 BHK1116-
BLOCK-F112 BHK153.93-
BLOCK-F113 BHK268.96-
BLOCK-F113 BHK187.23-
BLOCK-F113 BHK195.07-
BLOCK-F114 BHK1116-
BLOCK-F122 BHK153.93-
BLOCK-F123 BHK268.97-
BLOCK-F123 BHK187.23-
BLOCK-F123 BHK195.07-
BLOCK-F124 BHK1116-
BLOCK-F132 BHK153.93-
BLOCK-F133 BHK268.96-
BLOCK-F133 BHK187.23-
BLOCK-F133 BHK195.07-
BLOCK-F134 BHK1116-
BLOCK-F142 BHK153.93-
BLOCK-F143 BHK268.96-
BLOCK-F192 BHK153.93-
BLOCK-F193 BHK268.96-
BLOCK-F193 BHK187.23-
BLOCK-F193 BHK195.07-
BLOCK-F194 BHK1116-
Block-F143 BHK187.23-
Block-F143 BHK195.07-
Block-F144 BHK1116-
Block-F152 BHK153.93-
Block-F153 BHK268.96-
Block-F153 BHK195.07-
Block-F154 BHK1116-
Block-F153 BHK187.23-
Block-F162 BHK153.93-
Block-F163 BHK268.96-
Block-F163 BHK187.23-
Block-F163 BHK195.07-
Block-F164 BHK1116-
Block-F172 BHK153.93-
Block-F173 BHK268.96-
Block-F173 BHK187.23-
Block-F173 BHK195.07-
Block-F174 BHK1116-
Block-F182 BHK153.93-
Block-F183 BHK268.96-
Block-F183 BHK187.23-
Block-F183 BHK195.07-
Block-F184 BHK1116-

Development Works

work_namedescription
Demarcation of PlotsPrivate - Freehold Land , Demarcation was already done before starting the project
Boundary WallBoundary wall on RCC tie - Beams supported on RCC footings
Road WorkCement Concrete Internal Roads (CC Roads above the two coarse of WBM .
FootpathsInterlocking Pavers on PCC & compacted surface
Water Supply Including Drinking Water FacilitiesTo be provided by Ghaziabad Development Authority & Storage will be done in under ground water tank.
Sewer SystemMain Sewer line has been designed as per norms and partily laid in basement ceiling and will finally connect to Sewer line / STP
DrainUnderground pipe drain with chamber
ParksLandscape and Park has been designed as per authority guidelines.
Tree PlantingTree Planting has been designed as per authority guidelines
Design For Electric Supply Including Street LightingDesign has been done as per UP Electricity Board Guidelines
Community BuildingsClub has been designed as per authority norms & facility like-Party Hall, Gaming Zone , Entertainment area,etc.
Treatment and Disposal System of Sewage and Sullage waterSewage will be treated for recycling (If required) otherwise, it will be connected to the sewer line of authority which is already connected to to central functional STP of GDA for this locality.
Solid Waste Management And Disposal SystemDoor to door collection & will be disposed up to garbage point of authority.
Water Conservation SystemRecycling of treated water and rain water system to be provided.
Energy Management System Including Use of Renewable EnergySolar panels has been provided as per norms at suitable place.
Fire Protection And Fire Safety SystemSystem will be provided as per the fire department guidelines.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPrimary School and convenient shops in the premises
Emergency Evacuation ServicesProvision of Exit Sign & Emergency Lights
Other Miscellaneous WorkN/A

Bank Details

Bank NameAXIS BANK LTD
BranchAXIS BANK LTD G&F Floor, A to Z Shopping Broadways Premises Co-Op Society Ltd, Dr. B.R. Ambedkar Road, Dadar-TT, Dadar (East), Mumbai-400014
Branch AddressG&F Floor, A to Z Shopping Broadways Premises Co-Op Society Ltd, Dr. B.R. Ambedkar Road, Dadar-TT, Dadar (East), Mumbai-400014
Account HolderHIGH END INFRATECH PRIVATE LIMITED-Collection
Account Number918020056612907
IFSC CodeUTIB0000124

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy