Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda.
U.P. Awas Evam Vikas Parishad
Gonda, Uttar Pradesh
Approved
1st Dec 2020
Completed
30th May 2026
Registration No.
UPRERAPRJ814610
Project Type
Residential
District
Gonda
Taluka
Gonda
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ814610 |
| Project Status | Completed |
| Project Category | Residential |
| District | Gonda |
| Taluka | Gonda |
| Start Date | 2020-12-01 |
| Completion Date | 2026-05-30 |
| Total Area (sqm) | 9098 |
| Project Cost (Lacs) | 2548 |
| Duration (Months) | 66 |
| Registration Fee | 50500 |
Promoter Details
| Promoter Name | U.P. Awas Evam Vikas Parishad |
| Promoter ID | UPRERAPRM4243 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | Arvind Dev |
| Contractor | Name of Contractor will be final after Tender process. |
| Structural Engineer | Sanjay Jaiswal |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 135 | 9098 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| B1 | GF | 1 BHK | 12 | 22.77 | 0 |
| B1 | 1 | 1 BHK | 12 | 22.77 | - |
| B1 | 2 | 1 BHK | 12 | 22.77 | - |
| B1 | 3 | 1 BHK | 12 | 22.77 | - |
| B2 | GF | 1 BHK | 12 | 22.77 | 0 |
| B2 | 1 | 1 BHK | 12 | 22.77 | - |
| B2 | 2 | 1 BHK | 12 | 22.77 | - |
| B2 | 3 | 1 BHK | 12 | 22.77 | - |
| B3 | GF | 1 BHK | 12 | 22.77 | 0 |
| B3 | 1 | 1 BHK | 12 | 22.77 | - |
| B3 | 2 | 1 BHK | 12 | 22.77 | - |
| B3 | 3 | 1 BHK | 12 | 22.77 | - |
| B4 | GF | 1 BHK | 12 | 22.77 | 0 |
| B4 | 1 | 1 BHK | 12 | 22.77 | - |
| B4 | 2 | 1 BHK | 12 | 22.77 | - |
| B4 | 3 | 1 BHK | 12 | 22.77 | - |
| B6 | GF | 1 BHK | 12 | 22.77 | 0 |
| B6 | 1 | 1 BHK | 12 | 22.77 | - |
| B6 | 2 | 1 BHK | 12 | 22.77 | - |
| B6 | 3 | 1 BHK | 12 | 22.77 | - |
| B7 | GF | 1 BHK | 12 | 22.77 | 0 |
| B7 | 1 | 1 BHK | 12 | 22.77 | - |
| B7 | 2 | 1 BHK | 12 | 22.77 | - |
| B7 | 3 | 1 BHK | 12 | 22.77 | - |
| B8 | GF | 1 BHK | 12 | 22.77 | 0 |
| B8 | 1 | 1 BHK | 12 | 22.77 | - |
| B8 | 2 | 1 BHK | 12 | 22.77 | - |
| B8 | 3 | 1 BHK | 12 | 22.77 | - |
| B11 | GF | 1 BHK | 12 | 22.77 | 0 |
| B11 | 1 | 1 BHK | 12 | 22.77 | - |
| B11 | 2 | 1 BHK | 12 | 22.77 | - |
| B5 | GF | 1 BHK | 0 | 0 | 0 |
| B5 | 1 | 1 BHK | 0 | 0 | - |
| B5 | 2 | 1 BHK | 0 | 0 | - |
| B5 | 3 | 1 BHK | 12 | 22.77 | - |
| B11 | 3 | 1 BHK | 12 | 22.77 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per Layout Plan by UPAVP. |
| Boundary Wall | Not Applicable |
| Road Work | Yet to be started as per Layout plan.Internal Road work will be done by UPAVP and External Road work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Bituminous road is proposed with Base of WMM/WBM and including GSB. |
| Footpaths | Yet to be started as per Layout plan.Internal Footpath work will be done by UPAVP and External Footpath work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Footpath prosed as per UPAVP guidelines by Interlocking tiles or SOB Brick soling. |
| Water Supply Including Drinking Water Facilities | Yet to be started as per Layout plan.Internal Water Supply Including Drinking Water Facilities work will be done by UPAVP and External Water Supply Including Drinking Water Facilities work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Water supply proposed as per UPAVP guidelines with rising main. |
| Sewer System | Yet to be started as per Layout plan.Internal Sewer System work will be done by UPAVP and External Sewer System work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Septic tamk and soak pit proposed as per site requirement for sewage disposal. |
| Drain | Yet to be started as per Layout plan.Internal DRAIN System work will be done by UPAVP and External DRAIN System work will be done by UP LOCAL BODIES as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Brick work in 1 ratio 6 proposed for drain with pointing. |
| Parks | Yet to be started as per Layout plan by UPAVP. |
| Tree Planting | Yet to be started as per Layout plan by UPAVP. |
| Design For Electric Supply Including Street Lighting | Yet to be started as per Layout plan.Internal ELECTRIC SUPPLY System work will be done by UPAVP and External ELECTRIC SUPPLY System work will be done by UP PCL as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018 |
| Community Buildings | Not applicable. |
| Treatment and Disposal System of Sewage and Sullage water | After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme. |
| Solid Waste Management And Disposal System | After completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme. |
| Water Conservation System | Not applicable. |
| Energy Management System Including Use of Renewable Energy | Not applicable. |
| Fire Protection And Fire Safety System | As per Layout Plan |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Not applicable. |
| Emergency Evacuation Services | Not applicable. |
| Other Miscellaneous Work | As per Layout Plan |
Bank Details
| Bank Name | HDFC Bank |
| Branch | Gonda |
| Branch Address | Gonda |
| Account Holder | Executive Engineer Construction Division Two UPAVP |
| Account Number | 50100291409166 |
| IFSC Code | HDFC0001901 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in