New Launch - India Real Estate Report 2026.

Construction of 396 Nos houses under PMAY (U) in second Phase at Gonda.

U.P. Awas Evam Vikas Parishad

Gonda, Uttar Pradesh

RERA approved

Approved

1st Dec 2020

Project completed

Completed

30th May 2026

Registration No.

UPRERAPRJ814610

Project Type

Residential

District

Gonda

Taluka

Gonda

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ814610
Project StatusCompleted
Project CategoryResidential
DistrictGonda
TalukaGonda
Start Date2020-12-01
Completion Date2026-05-30
Total Area (sqm)9098
Project Cost (Lacs)2548
Duration (Months)66
Registration Fee50500

Promoter Details

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter IDUPRERAPRM4243
Mobile87********

Project Team

rolename
ArchitectArvind Dev
ContractorName of Contractor will be final after Tender process.
Structural EngineerSanjay Jaiswal

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra1359098

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
B1GF1 BHK1222.770
B111 BHK1222.77-
B121 BHK1222.77-
B131 BHK1222.77-
B2GF1 BHK1222.770
B211 BHK1222.77-
B221 BHK1222.77-
B231 BHK1222.77-
B3GF1 BHK1222.770
B311 BHK1222.77-
B321 BHK1222.77-
B331 BHK1222.77-
B4GF1 BHK1222.770
B411 BHK1222.77-
B421 BHK1222.77-
B431 BHK1222.77-
B6GF1 BHK1222.770
B611 BHK1222.77-
B621 BHK1222.77-
B631 BHK1222.77-
B7GF1 BHK1222.770
B711 BHK1222.77-
B721 BHK1222.77-
B731 BHK1222.77-
B8GF1 BHK1222.770
B811 BHK1222.77-
B821 BHK1222.77-
B831 BHK1222.77-
B11GF1 BHK1222.770
B1111 BHK1222.77-
B1121 BHK1222.77-
B5GF1 BHK000
B511 BHK00-
B521 BHK00-
B531 BHK1222.77-
B1131 BHK1222.77-

Development Works

work_namedescription
Demarcation of PlotsAs per Layout Plan by UPAVP.
Boundary WallNot Applicable
Road WorkYet to be started as per Layout plan.Internal Road work will be done by UPAVP and External Road work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Bituminous road is proposed with Base of WMM/WBM and including GSB.
FootpathsYet to be started as per Layout plan.Internal Footpath work will be done by UPAVP and External Footpath work will be done by UPPWD as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Footpath prosed as per UPAVP guidelines by Interlocking tiles or SOB Brick soling.
Water Supply Including Drinking Water FacilitiesYet to be started as per Layout plan.Internal Water Supply Including Drinking Water Facilities work will be done by UPAVP and External Water Supply Including Drinking Water Facilities work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Water supply proposed as per UPAVP guidelines with rising main.
Sewer SystemYet to be started as per Layout plan.Internal Sewer System work will be done by UPAVP and External Sewer System work will be done by UP JAL NIGAM as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Septic tamk and soak pit proposed as per site requirement for sewage disposal.
DrainYet to be started as per Layout plan.Internal DRAIN System work will be done by UPAVP and External DRAIN System work will be done by UP LOCAL BODIES as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018. Brick work in 1 ratio 6 proposed for drain with pointing.
ParksYet to be started as per Layout plan by UPAVP.
Tree PlantingYet to be started as per Layout plan by UPAVP.
Design For Electric Supply Including Street LightingYet to be started as per Layout plan.Internal ELECTRIC SUPPLY System work will be done by UPAVP and External ELECTRIC SUPPLY System work will be done by UP PCL as per GO No. 1878/Aath-1-16-80/Miscellaneous/2010 Date-17.10.2018
Community BuildingsNot applicable.
Treatment and Disposal System of Sewage and Sullage waterAfter completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme.
Solid Waste Management And Disposal SystemAfter completion of project will be handed over to local authority.Sewarage and sullage waste Point is situated in Proposede scheme.
Water Conservation SystemNot applicable.
Energy Management System Including Use of Renewable EnergyNot applicable.
Fire Protection And Fire Safety SystemAs per Layout Plan
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable.
Emergency Evacuation ServicesNot applicable.
Other Miscellaneous WorkAs per Layout Plan

Bank Details

Bank NameHDFC Bank
BranchGonda
Branch AddressGonda
Account HolderExecutive Engineer Construction Division Two UPAVP
Account Number50100291409166
IFSC CodeHDFC0001901

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Varanasi

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy