Construction of S.F.S. type 100 nos. E.W.S. houses, S.F.S type 20 nos. L.I.G. houses and S.F.S. type 20 nos. M.I.G houses at Gonda-Faizabaad Marg Bhoomi Vikas Evam Grihsthan Yojna,Gonda.
U.P. Awas Evam Vikas Parishad
Gonda, Uttar Pradesh
Approved
31st Jul 2022
Completed
30th Jul 2025
Registration No.
UPRERAPRJ273960
Project Type
Residential
District
Gonda
Taluka
Gonda
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ273960 |
| Project Status | Completed |
| Project Category | Residential |
| District | Gonda |
| Taluka | Gonda |
| Start Date | 2022-07-31 |
| Completion Date | 2025-07-30 |
| Total Area (sqm) | 6786 |
| Project Cost (Lacs) | 2653 |
| Duration (Months) | 36 |
| Registration Fee | 39000 |
Promoter Details
| Promoter Name | U.P. Awas Evam Vikas Parishad |
| Promoter ID | UPRERAPRM4243 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | ALOK VERMA |
| Contractor | EXECUTIVE ENGINEER CD AYODHYA-THREE GONDA |
| Structural Engineer | AJIT KUMAR CHAUDHARY |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 520,522,546,547,548,549,553 | 6786 |
Unit Configuration
| Development Type | Size Of plot | Number Of Plot/Villas | Carpet Area Of The Villa(In Sq. Mt.) |
|---|---|---|---|
| Villa | 41 | 100 | 22 |
| Villa | 61 | 20 | 33 |
| Villa | 75 | 20 | 38 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | As per approved Layout plan. The plot shall be demarcated by means of Tee. |
| Boundary Wall | Parishad shall not provide any boundary wall. To be built by the alottee concern in line with the Bhawan nirman upvidhi. |
| Road Work | As per specification of UP Awas Evam Vikas Parishad (Chief Engineer Order No. 685/M-4/2017 Dt. 19.03.2017 and others) and work shall be carried out as per U.P.P.W.D. Specifications. Soling coat with 45-90 mm stone ballast. inner coat with 45- 63 mm stone ballast. top coat with 22.4-53 mm stone ballast and bituminous coat over top coat. |
| Footpaths | As per specification of UP Awas Evam Vikas Parishad (Chief Engineer Order No 685/M-4/2017 Dt 19.03.2017 and others) and work shall be carried out as per UPPWD Specifications. |
| Water Supply Including Drinking Water Facilities | Shall be provided as per norms and specifications of UP Jal Nigam . The network consist of Trunk water line led in Trunk road cross section with O.H.T. in sector to cater to the blocks. Water line laying of PVC pipe ISI marked (Pressure 6.00 kg per sqcm.) at site. |
| Sewer System | Provided. The under ground sewer network with manholes chambers shall be provided in accordance with UP Jal Nigam specifications and chief Engineer Order No. - 912/M-1/94 dt 20-10-2005 . Sewer line provided through Class NP3 and NP2 RCC hume pipes (as per design). |
| Drain | Open channelised water drainage network is to be provided . Drain shall be of type CK,C1,C2,......etc. The construction shall be as per UPPWD specifications and guidelines. Brick work drains are provided in ration of 1 ration 6 of cement and approved coarse sand. Culverts are provided in the junctions of road as per design. |
| Parks | Provided as shown in approved layout. The construction and development shall be in line with office order No. 878/ISO/ dt 05-04-2017. Brick work and railing provided at boundary of park. |
| Tree Planting | Provided as shown in approved layout. By side of the road and in parks as per approved layout. The construction and development dhall be inline with office order No. 878/ISO/ dt 05-04-2017 |
| Design For Electric Supply Including Street Lighting | Shall be done in house (by UPAVP) and shall be handed over to UPPCL for issuing individual connections. |
| Community Buildings | Community building will be built in future as per approved map. |
| Treatment and Disposal System of Sewage and Sullage water | Planned sewer network for intire yojna. These plot shall be connected to this proposed network. |
| Solid Waste Management And Disposal System | Kuda ghar provided by UPAVP as per layout. Disposal of solid waste management provided by parishad till handed over of yojna to local body. The solid waste dispose inline with rule and regulations. |
| Water Conservation System | Rain water harvesting in individual plots inline with the building bye laws to be done by concerning alotties |
| Energy Management System Including Use of Renewable Energy | Solar panels in individual plots inline with the building bye laws to be done by the concerning alooties. |
| Fire Protection And Fire Safety System | Not provided. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Provided as shown in approved layout. |
| Emergency Evacuation Services | Provided as shown in approved layout. |
| Other Miscellaneous Work | Not provided. |
Bank Details
| Bank Name | State Bank of India (SBI) |
| Branch | Main Branch Gonda |
| Branch Address | Station road Gonda |
| Account Holder | Upavp Gonda - Faizabad Marg Scheme Gonda Collection A/c |
| Account Number | 40900014740 |
| IFSC Code | SBIN0000084 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Varanasi


Ask Pulse Ai anything about real estate





